S4-QUICKLINK-D Single and Double Sinks Instruction Manual
- June 10, 2024
- QUICKLINK
Table of Contents
S4-QUICKLINK-D Single and Double Sinks
INSTALLATIONS INSTRUCTIONS
Mark out and drill the splashback at the required position.
Set tabling castors to drip tray height.
Bolt fixing bracket(s) to drip trays
-
Bolt drip tray(s) to dishwasher
-
Bolt wall plate/ sink bracket to rear of splash back using fixing block supplied.
-
Level wall plate. fix top 2 wallplate fixings to wall.
-
Disconnect the wallplate. Remove tabling and fix wall plate securely to wall.
-
Connect water supplies from sink bracket to pre-rinse/ taps.
-
Apply jointing compound/ tape tighten drain tee onto sink boss so that outlet faces rear of tabling.
-
Push tapered pipe into drain fitting as far as it will go. Connect the tabling to the wall plate.
-
Glue tapered pipe into tee, with shield end facing wall.
Connect tabling back to wall plate. Mark drain fitting fixing holes and fix to wall.
-
Interconnect drains into open and of tee or cap
Water I drain connections
Ensure all pipework is flushed clear of debris. Service valves should be fitted to supplies. Max. recommended water pressure 3 bar (44psi) Earth bonding connection required. Installation must comply with local authority requirements.
MECHLINE DEVELOPMENTS LIMITED I
Telephone: +44 (0) 1908 261511 I Email:
inlo@mechline.com I Web:
www.mechline.com
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>