nVent RAYCHEM JBS-100-A Single Entry Power Connection with Junction Box Instruction Manual
- June 10, 2024
- nVent RAYCHEM
Table of Contents
nVent RAYCHEM JBS-100-A Single Entry Power Connection with Junction Box
APPROVALS
Hazardous Locations
Class I, Div. 2, Groups A, B, C, D Class II, Div. 2, Groups E, F, G Class III CLI, ZN1, AEx e II T* (1)
(JBS-100-A only) Ex eb IIC T Gb (3)
JBS-100-A is IECEx certified for use with:
BTV-CR/BTV-CT: IECEx BAS 20.0011X
QTVR-CT: IECEx BAS 20.0013X
XTV-CT: IECEx BAS 20.0012X
KTV-CT: IECEx BAS 20.0014X
HTV-CT: IECEx PTB 21.0007X
VPL-CT: IECEx BAS 20.0008X
Ex eb IIC T* Gb* ; Class I Zone 1 AEx eb IIC TGb
Ex tb IIIC T*°C Db;* Zone 21 AEx tb IIIC T°C Db
KIT CONTENTS
Item | Qty | Description |
---|---|---|
A | 1 | Stand assembly |
B | 1 | Core sealer |
C | 1 | Green/yellow tube |
D | 1 | Cable lubricant |
E | 1 | Cable tie |
F | 1 | Lid |
G | 1 | Box with terminal blocks |
DESCRIPTION
The nVent RAYCHEM JBS-100-A and nVent RAYCHEM JBS-100-A6 are NEMA 4X-rated
power connection kit. It is designed for use with nVent RAYCHEM BTV-CR, BTV-
CT, QTVR-CT, XTV-CT, KTV-CT, HTV-CT and VPL-CT industrial parallel heating
cables.
The JBS-100-A6 utilizes larger terminal blocks to accommodate up to 6 AWG
power wires.
This kit may be installed at temperatures as low as –67°F (–55°C). For easier
installation store above freezing until just before installation.
For technical support call nVent
800-545-6258.
TOOLS REQUIRED
- Wire cutters
- Adjustable pliers
- Utility knif
- Needle nose pliers
- Large slotted screwdriver
- Marker
- 1/4 in or smaller flat-blade screwdriver
ADDITIONAL MATERIALS REQUIRED
- Pipe strap
- GT-66 or GS-54 glass cloth tape
OPTIONAL MATERIALS
- Recommended conduit drain: JB-DRAIN-PLUG-3/4IN P/N 278621-000
- Small pipe adapter for 1 in (25 mm) and smaller pipes: Catalog number JBS-SPA P/N E90515-000
This component is an electrical device that must be installed correctly to
ensure proper operation and to prevent shock or fire. Read these important
warnings and carefully follow all of the installation instructions.
- To minimize the danger of fire from sustained electrical arcing if the heating cable is damaged or improperly installed, and to comply with the requirements of nVent agency certifications, and national electrical codes, ground-fault equipment protection must be used. Arcing may not be stopped by conventional circuit breakers.
- Component approvals and performance are based on the use of nVent-specified parts only. Do not use substitute parts or vinyl electrical tape.
- The black heating cable core and fibers are conductive and can short. They must be properly insulated and kept dry.
- Damaged bus wires can overheat or short. Do not break bus wire strands when scoring the jacket or core.
- Keep components and heating cable ends dry before and during installation.
- Use only fire-resistant insulation materials, such as fiberglass wrap and flame-retardant foam.
CAUTION
HEALTH HAZARD: Prolonged or repeated contact with the sealant in the core
sealer may cause skin irritation.
Wash hands thoroughly. Overheating or burning the sealant will produce fumes
that may cause polymer fume fever. Avoid contamination of cigarettes or
tobacco.
Consult MSDS VEN 0058 for further information.
CHEMTREC 24-hour emergency telephone:
800-424-9300
Non-emergency health and safety information:
800-545-6258.
BOX INSTALLATION INSTRUCTIONS
Heating cable types
-
Allow approximately 24 in (60 cm) of heating cable for installation. For VPL, cut cable 12 in (30 cm) from bus indentation.
-
Cut off heating cable end at about 45° for easier insertion.
-
Optional: If stand is to be installed on bottom side of pipe, knock out drain hole prior to inserting cable.
-
With label on stand facing desired direction of box opening, push 18 in (45 cm) of heating cable through stand. Use cable lubricant if needed. • Square off cable end with 90° cut.
-
Lightly score outer jacket around and down as shown.
-
Bend heating cable to break jacket at score, then peel off jacket.
-
Push braid back to create a pucker.
-
At pucker use a screwdriver to open braid.
-
Bend heating cable and work it through opening in braid.
-
Lightly score inner jacket around and down as shown.
-
Peel off inner jacket.
-
Notch core.
-
Peel bus wire from core.
-
Score core between buswires at inner jacket.
-
Bend and snap core.
-
Peel core from bus wire.
-
Remove any remaining core material from bus wires.
-
Pull braid tight to make pigtail.
-
Push braid back to create a pucker.
-
At pucker use a screwdriver to open braid. \
-
Bend heating cable and work it through opening in braid.
-
Lightly score inner jacket around and down as shown.
-
Peel off inner jacket.
-
Cut and remove all fiber strands.
-
Score and remove center spacer.
-
Remove any remaining fiber material from bus wires.
-
Pull braid tight to make pigtail.
-
Push braid back and bunch as tight as possible.
-
Lightly score inner jacket around and down as shown.
-
Peel off inner jacket.
-
Unwind heating element, cut and remove as shown.
-
Lightly score clear jacket around and down as shown.
-
Bend heating cable to break jacket at the score then peel off jacket.
-
Push braid forward. Use a screwdriver to open braid as shown.
-
Bend heating cable and work it through opening in braid.
-
Remove insulation from ends of bus wires.
-
Pull braid tight to make pigtail.
-
Push braid back to create a pucker.
-
At pucker use a screwdriver to open braid.
-
Bend heating cable and work it through opening in braid.
-
Score inner jacket and conductive core around and down as shown.
-
Peel off inner jacket.
-
Flip the cable 180ºC and score the other side of inner jacket and conductive core.
-
Remove the inner jacket, conductive core by using needle-nose pliers as shown.
-
Remove any remaining material from bus wires.
-
Pull braid tight to make pigtail. 5D Go to Step 6
-
Score and remove center insulation
-
Mark the jacket as shown.
CAUTION: Health Hazard.
Wash hands after contact with sealant. Consult material safety data sheet VEN
0058.
-
If needed, re-twist and straighten bus wires, then insert into the guide tubes as shown.
-
Push core sealer onto the heating cable to the mark made in step 6.
Note: Extra force may be required for larger cables or at lower temperatures. -
Remove the guide tubes and dispose of them in a plastic bag.
-
Slip the green/yellow tube onto the braid. Heat-shrinking is not required.
-
Trim bus wires and braid.
-
• Pull heating cable back into stand so 1 in (25 mm) is exposed as shown. Use cable lubricant if needed.
-
Fasten stand to pipe with label facing desired direction of box opening. Do not pinch heating cable.
-
Loop and tape extra heating cable to pip
-
Screw box onto stand until it stops. Do not overtighten.
-
Loosen locknut using adjustable pliers.
-
Lift box and rotate. Make sure tab on threaded piece fits into one of the four notches in box.
-
Tighten locknut
-
Insert cable tie through slots on stand and box, and tighten firmly to prevent box rotation.
-
This kit uses spring clamp style terminals.
Terminals use a steel spring to clamp the wire to provide improved vibration resistance, reduced maintenance and faster installation.
To connect wires, firmly insert a slotted screwdriver into the square hole ( 1 ) to open the spring. When fully inserted, the screwdriver will lock 2 into place, allowing you to remove your hand and insert the wire into the round hole ( 1 2 ). Remove the screwdriver to clamp the wire. The wire is held securely against the bus bar for low contact resistance over time without the need to periodically retighten screws -
Push screwdriver FIRMLY into square hole.
-
Insert wire into round hole.
-
Use green terminal for braid and ground wire.
-
Remove screwdriver.
-
Repeat for all connections.
-
Install conduit and fittings as shown. To minimize loosening due to pipe vibration, use flexible conduit.
-
Pull in power and ground wires, strip off 1/2 in (13 mm) of insulation and terminate
-
nVent recommends the use of a conduit drain to prevent water condensation build-up.
-
Install lid. Torque = 1.02 to 1.47 Nm
-
Apply insulation and cladding.
-
Weather-seal the stand entry.
-
Leave these instructions with the end user for future reference
WARNING: Explosion Hazard- Substitution of Components May Impair Suitablity for Class I Division 2 (Zone 2)
North America
Tel +1.800.545.6258
Fax +1.800.527.5703
thermal.info@nVent.com
Europe, Middle East, Africa
Tel +32.16.213.511
Fax +32.16.213.604
thermal.info@nVent.com
Asia Pacific
Tel +86.21.2412.1688
Fax +86.21.5426.3167
cn.thermal.info@nVent.com
Latin America
Tel +1.713.868.4800
Fax +1.713.868.2333
thermal.info@nVent.com
©2021 nVent. All nVent marks and logos are owned or licensed by nVent Services
GmbH or its affiliates. All other trademarks are the property of their
respective owners. nVent reserves the right to change specifications without
notice. RAYCHEM-IM-H56046-JBS100A100A6-EN-2112
nVent.com/RAYCHEM
PCN 789781-000