ROLL-INS BLAST CHILLER ASSEMBLY INSTRUCTION

  • VERIFY THAT THE FLOOR, WHERE THE BLAST CHILLER WILL BE INSTALLED, IS LEVELED

  • IN CASE OF SUNKEN FLOOR INSTALLATION , MAKE THE HOLE IN THE FLOOR OF THE BUILDING FOLLOWING THE DIMENSION ON THE DATA SHEET. IT IS ADVISABLE TO MAKE A DEEPER CUTTING LIKE 80/90 mm AND THAN USE A SELF-LEVELING CEMENT IN ORDER TO ACHIEVE THE RIGHT QUOTE OF 75 mm
    ROLL-INS BLAST CHILLEacR ASSEMBLY INSTRUCTION

  • PREPARE A DRAINAGE DUCT NEAR THE DOOR AND CONVEY THE CONDENSATE DRAIN PIPE INTO THE WASTEWATER NETWORK.
    ROLL-INS BLAST CHILLEacR ASSEMBLY INSTRUCTION

  • THE MACHINE MUST BE INSTALLED ON A FLAT, HORIZONTAL SURFACE BOTH TO AVOID PROBLEMS RELATED TO THE STABILITY OF THE MACHINE AND FOR THE APPROPRIATE SLOPE FOR DRAINING THE CONDENSATE.
    ROLL-INS BLAST CHILLEacR ASSEMBLY INSTRUCTION

  • EACH PANELS IS NUMBERED, PLEASE FOLLOW THE NUMBERS TO INSTALL IN THE CORRECT WAY THE PANELS.
    ROLL-INS BLAST CHILLEacR ASSEMBLY INSTRUCTION

  • PUT SILICON IN THE POINTS INDICATED AND ALONG THE PERIMETER AS HIGHLIGHTED WITH THE RED LINE
    ROLL-INS BLAST CHILLEacR ASSEMBLY INSTRUCTION

  • INSTALL THE PANEL N.2 AND CLOSE THE BOTTOM LOCKS
    ROLL-INS BLAST CHILLEacR ASSEMBLY INSTRUCTION

  • INSTALL THE PANEL N.3 AND CLOSE THE “A” LOCK, THAN CLOSE THE OTHERS 5 LOCKS BY FOLLOWING THE SEQUENCE (A, B, C, D…..)
    ROLL-INS BLAST CHILLEacR ASSEMBLY INSTRUCTION

  • INSTALL THE PANEL N.4 AND CLOSE THE “A” LOCK, THAN CLOSE THE OTHERS 5 LOCKS BY FOLLOWING THE SEQUENCE (A, B, C, D…..)
    ROLL-INS BLAST CHILLEacR ASSEMBLY INSTRUCTION

  • INSTALL THE PANEL N.5 AND CLOSE THE “A” LOCK, THAN CLOSE THE OTHERS 5 LOCKS BY FOLLOWING THE SEQUENCE (A, B, C, D…..)
    ROLL-INS BLAST CHILLEacR ASSEMBLY INSTRUCTION

  • INSTALL THE PANEL N.6 AND CLOSE THE “A” LOCK, THAN CLOSE THE OTHERS 5 LOCKS BY FOLLOWING THE SEQUENCE (A, B, C, D…..)
    ROLL-INS BLAST CHILLEacR ASSEMBLY INSTRUCTION

  • INSTALL THE PANEL N.7 AND CLOSE THE “A” LOCK, THAN CLOSE THE OTHERS 5 LOCKS BY FOLLOWING THE SEQUENCE (A, B, C, D…..)
    ROLL-INS BLAST CHILLEacR ASSEMBLY INSTRUCTION

  • INSTALL THE PANEL N.8 AND CLOSE THE “A” LOCK, THAN CLOSE THE OTHERS 5 LOCKS BY FOLLOWING THE SEQUENCE (A, B, C, D…..)
    ROLL-INS BLAST CHILLEacR ASSEMBLY INSTRUCTION

  • INSTALL THE PANEL N.9 AND CLOSE THE LOCKS. PUT SILICON IN THE POINTS INDICATED AND ALONG THE PERIMETER AS HIGHLIGHTED WITH THE RED LINE.
    ROLL-INS BLAST CHILLEacR ASSEMBLY INSTRUCTION

  • INSTALL THE PANEL N.10 AND CLOSE THE LOCKS.
    ROLL-INS BLAST CHILLEacR ASSEMBLY INSTRUCTION
    ROLL-INS BLAST CHILLEacR ASSEMBLY INSTRUCTION
    ROLL-INS BLAST CHILLEacR ASSEMBLY INSTRUCTION
    ROLL-INS BLAST CHILLEacR ASSEMBLY INSTRUCTION
    ROLL-INS BLAST CHILLEacR ASSEMBLY INSTRUCTION
    ROLL-INS BLAST CHILLEacR ASSEMBLY INSTRUCTION

Customer Service

Finanzen / Service 28307 Bremen
Thalenhorststraße 15
Tel.+49 421 48557-0
Fax+49 421 488650
[email protected]

Vertrieb Ost 12681 Berlin
Wolfener Straße 32/34, Haus K
Tel.+4930936684-0
Fax+4930936684-44
[email protected]

Vertrieb West 40699 Erkrath
Max-Planck-Straße 30
Tel.+49 211 540054-0
Fax+49 211 540054-54
[email protected]

Vertrieb Nord 21079 Hamburg
Großmoorbogen 5
Tel.+49 40 766183-0
Fax+49 40 770799
[email protected]

Vertrieb Süd 55218 Ingelheim
Hermann-Bopp-Straße 4
Tel.+49 6132 7101-0
Fax+49 6132 7101-20
[email protected]

www.nordcap.de
QR Code Icon

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

NordCap User Manuals

Related Manuals