Schneider Electric AGS Automatic Generator Installation Guide

June 9, 2024
Schneider Electric

Schneider-logo

Schneider Electric AGS Automatic Generator

Schneider-Electric-AGS-Automatic-Generator-product -
Copy

Instruction

  1. Please fill the AGS info form (one end users / form) and separate APC Global service order
  2. All units must have proof of purchase (if the serial no. and purchased date is different from 3 months)
  3. And email your order to APC Thailand, itdplanner@schneider-electric.com

*Service SO*| Service PO| Product PO| Request Installation date
---|---|---|---
AGS Model / SKU| Q’ty|
UPS Model| Serial No.| **Number of PM         Period of warranty
---|---|---|---|---
| | | | | |

2 times / year

| |

Standard

| | | | | |

3 times / year

| |

3 years

| | | | | | 4 times / year| | 4 years
| | | | | | every month| | 5 years
| | | | | | | |
| | other…..| | other……

Schneider-Electric-AGS-Automatic-Generator-fig-1

Remark: ………….

Schneider Electric CPCS (Thailand) Co., Ltd.
1st, 10th and 11th Floor Rungrojthanakul Building 46 Ratchadapisek Road, Huaykwang Huaykwang, Bangkok 10310 – Thailand
Tel. +66 (0) 2617 5600
Fax +66 (0) 2617 5604
Version aug2020

AGS Installation Policy

Installation Conditions APC-UPS (Single Phase)

  1. The details in the AGS Form must be complete. Otherwise, the company can not be considered for registration. (Especially after the sign).

  2. The customer or distributor must submit AGS Form to the company. The team can install the following conditions as detailed below :

  3. Duration of service after receiving the complete document from the customer or dealer:

  4. days (Bangkok and Metropolitan area)

  5. days (upcountry)

  6. The customer or distributor must deliver the UPS to the installation site (ready to installation) and prepare the power system for the Field service engineer.

  7. Items to be prepared by the customer (the company is not prepared)

  8. Input Line and Output Cable within 5 meters (1Phase & 3 Phases Input Type) or Up to 10 meters in both Input and
    Output

  9. Additional equipment required for installation are: Connector, Cable Lugs, Wire Mark with Accessories

  10. Additional equipment required for electrical wiring is Waterproof Flexible Conduit or Wire Way with Accessories.

  11. The wage for electrical wiring and moving the UPS to the installation point.

  12. The company will send a Field service engineer to service the installation of the UPS. The details are as follows.

  13. Install the power supply according to the specified conditions.

  14. Test the UPS after installation. The company is not responsible for any outgoing power system.
    However, it will indicate that the APC-UPS’s electrical outlets can work properly and securely.

  15. Field service engineer will introduce basic operation, maintenance the UPS, and basic information (Output Load Test Of APC – UPS only)

  16. Service Center and Installation Teams Nationwide
    Area/Team/Telephone/number

  17. Bangkok and Metropolitan area ASP-PDE 0-2171-7477

  18. Center/ASP-PDE/0-2171-7477

  19. Northern/Niwat Yoikratok/(FSE Lead) 083-540-9687

  20. Northeast/Anuthep Nokeaw/(FSE) 083-540-9686

  21. Sounthern/Thanapat PHETCHARUT/(FSE) 063-464-8148

  * The team leader of the installation team in the province and upcountry is Mr. Niwat Yuthok (FSE Lead) call 083-540-9687.
  * Customers can inquire and confirm the appointment, and installation of the UPS as described above. After submitting the AGS Form
  1. Field service engineer will not be able to access the service or installation if the customer does not prepare the location of the power supply and equipment mentioned in the conditions
Pre Installation Check List

please check as detail below

Item Detail Yes No
1 Type of electrical input is single phase electrical system
2 Type of electrical input is three phase electrical system
3 The distance between the UPS and the Input Circuit Breaker is less than 5
meters.
4 Customers provided electrical systems and equipment such as Input Circuit

Breaker and

Output Circuit Breaker.

| |
5| Customer prepared UPS to the installation and prepared the power system for Field service

engineer.

| |

If customer have additional requirement please write down the detail below
Remark:
……………………………………………………………………………………………………………………………

Version aug2020 Internal

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Schneider Electric User Manuals

Related Manuals