ARISTA CCA-ETM-Q20 Edge Threat Management Appliance User Guide

June 9, 2024
ARISTA

ARISTA logo CCA-ETM-Q20 Edge Threat Management Appliance
User GuideARISTA CCA-ETM-Q20 Edge Threat Management
Appliance Arista Networks
www.arista.com
DOC-06003-01

CCA-ETM-Q20 Edge Threat Management Appliance

Headquarters
5453 Great America Parkway,
Santa Clara, CA 95054
USA
+1-408 547-5500| Support
+1-408 547-5502
+1-866 476-0000| Sales
+1-408 547-5501
+1-866 497-0000
---|---|---
https://www.arista.com/en/| mailto: [email protected]| mailto: [email protected]

© Copyright 2023 Arista Networks, Inc. All rights reserved. The information contained herein is subject to change without notice. The trademarks, logos and service marks (“Marks”) displayed in this documentation are the property of Arista Networks in the United States and other countries. Use of the Marks are subject to Arista Network Term of Use Policy, available at http://www.arista.com/en/terms-of-use. Use of marks belonging to other parties is for informational purposes only.

Overview

The following topics are covered in this section:

  • Scope
  • Receiving and Inspecting the Equipment
  • Installation Process
  • Safety Information
  • Obtaining Technical Assistance
  • Specifications

1.1 Scope
This guide is intended for properly trained service personnel and technicians who need to install the following Arista appliances:
This guide is covering the CCA-ETM-Q20 appliance.
Important:
Only qualified personnel should install, service, or replace this equipment.
1.2 Receiving and Inspecting the Equipment
Upon receiving the appliance, inspect the shipping boxes and record any external damage. Retain packing materials if you suspect that part of the shipment is damaged; the carrier may need to inspect them.
If the boxes were not damaged in transit, unpack them carefully. Ensure that you do not discard any accessories that may be packaged in the same box as the main unit.
Inspect the packing list and confirm that you received all listed items. Compare the packing list with your purchase order. Parts List provides a list of components included with the appliance.
1.3 Installation Process
The following tasks are required to install and use the appliance:

  1. Select and prepare the installation site Site Selection.
  2. Assemble the installation tools listed Tools and Parts Required for Installation.
  3. Attach the mounting brackets and install the switch in an equipment rack Mounting the Appliance.
  4. Configure the appliance Configuring the Appliance.

Important:
Class 1 Laser Product: This product has provisions to install Class 1 laser transceivers which provide optical coupling to the communication network. Once a Class 1 laser product is installed, the equipment is a Class 1 Laser Product. The customer is responsible for selecting and installing the Class 1 laser transceiver and for insuring that the Class 1 AEL (Allowable Emission Limit) per EN/IEC 60825, CSA E60825-1, and Code of Federal Regulations 21 CFR 1040 is not exceeded after the laser transceiver have been installed. Do not install laser products whose class rating is greater than 1. Refer to all safety instructions that accompanied the transceiver prior to installation. Only Class 1 laser appliances, certified for use in the country of installation by the cognizant agency are to be utilized in this product.
Important:
Ultimate disposal of this product should be handled in accordance with all national laws and regulations.
1.4 Safety Information
Refer to the Arista Networks document Safety Information and Translated Safety Warnings available at: https://www.arista.com/en/support/product- documentation.
1.5 Obtaining Technical Assistance
Any customer, partner, reseller or distributor holding a valid Arista Service Contract can obtain technical support in any of the following ways:

  • Email: http://support.arista.com. This is the easiest way to create a new service request.

  • Web: https://www.arista.com/en/support.
    A support case may be created through the support portal on our website. You may also download the most current software and documentation, as well as view FAQs, Knowledge Base articles, Security Advisories, and Field Notices.

  • Phone: +1 866-476-0000 or +1 408-547-5502.
    Important:
    No user serviceable parts inside. Refer all servicing to qualified service personnel.

1.6 Specifications
This section lists the specifications of the CCA-ETM-Q20.
Table 1: Appliance Specifications (Dimensions and Weights)

Appliance Size (W x D x H) Weight
CCA-ETM-Q20 438mm x 553mm x 44mm 9.5 kg

Table 2: Appliance Specifications (Operational and Storage)

Appliance| Operating Temperature, Relative
Humidity| Storage Temperature, Relative Humidity| Operating Altitude
---|---|---|---
CCA-ETM-Q20| 0 – 40C
20% – 80%| -10 – 70°C
5 – 95%| up to 5000
meters

Table 3: Device Specifications (Power Input)

Power Source Ratings
Dual 300W (Redundant PSU) 300W

Preparation

This section describes the initial setup and preparation for installing the CCA-ETM-Q20.
This chapters contains the following topics:

  • Site Selection
  • Tools and Parts Required for Installation
  • Electrostatic Discharge (ESD) Precautions

2.1 Site Selection
The following criteria should be considered when selecting a site to install the appliance.

  • Temperature and Ventilation: For proper ventilation, install the appliance where there is ample airflow to the front and back of the appliance. The ambient temperature should not go below 0° or exceed 40°C.
    Important: To prevent the appliance from overheating, do not operate it in an area where the ambient temperature exceeds 40°C (104°F).

  • Airflow Orientation: The airflow of the appliance travels from front to back.

  • Rack Space: Install the appliance in a 19″ rack or cabinet. The appliance height is 1 RU. The rack mounting kit provides mounting brackets for four-post racks.
    When mounting the appliance in a partially filled rack, load the rack from bottom to top, with the heaviest equipment at the bottom. Load the appliance at the bottom if it is the only item in the rack.

  • Other Requirements: Select a site where liquids or objects cannot fall onto the equipment and foreign objects are not drawn into the ventilation holes. Verify these guidelines are met:

  • Clearance areas to the front and rear panels allow for unrestricted cabling.

  • All front and rear panel indicators can be easily read.

  • Power cords can reach from the power outlet to the connector on the rear panel.
    Important: All power connections must be removed to de-energize the unit.

2.2 Tools and Parts Required for Installation
Each appliance provides an accessory kit that contains parts that are required to install the appliance.
The accessory parts list is shown at Parts List.
In addition to the accessory kit, the following tools and equipment are required to install the appliance:
Four-Post Rack

  • Screws or rack mounting nuts and bolts.
  • Screwdriver

Accessory kit does not include screws for attaching the appliance to the equipment rack. When installing the appliance into an equipment rack with unthreaded post holes, nuts are also required to secure the appliance to the rack posts.
2.3 Electrostatic Discharge (ESD) Precautions
Observe these guidelines to avoid ESD damage when installing or servicing the appliance.

  • Assemble or disassemble equipment only in a static-free work area.
  • Use a conductive work surface (such as an anti-static mat) to dissipate static charge.
  • Wear a conductive wrist strap to dissipate static charge accumulation.
  • Minimize handling of assemblies and components.
  • Keep replacement parts in their original static-free packaging.
  • Remove all plastic, foam, vinyl, paper, and other static-generating materials from the work area.
  • Use tools that do not create ESD.

Chapter 3: Mounting the Appliance

The appliance is mounted onto a four-post rack by preparing the chassis for mounting, then securing the appliance to the front posts using the mounting brackets, followed by securing it to the rear posts.
3.1 Four-Post Rack Mount
Note: Each chassis side has holes that allow for the attachment of the slide rails. Ensure that the rails are attached symmetrically to the left and right sides of the chassis and the slides can be extended to connect with the rear rack posts. Depending on the depth of the rear rack, the number of screws required will vary.
Note: A minimum of two screws are recommended for each side.
3.2 Rack Mounting the ApplianceARISTA CCA-ETM-Q20 Edge Threat
Management Appliance - Fig 1

1 Mounting screws
2 Left bracket| 3 Mounting screws
4 Right bracket
---|---

  1. Align the left bracket to the left face plate.
  2. Attach the left front mounting bracket using three mounting screws.
  3.  Align the right bracket to the right face plate.
  4. Attach the right front mounting bracket using three mounting screws.

ARISTA CCA-ETM-Q20 Edge Threat Management Appliance - Fig
2

1 Mounting rail 2 Mounting screws
  1. Align the left rail to the four holes on left side of the appliance.
  2. Attach the left rail using four mounting screws.
  3. Align the right rail to the four holes on right side of the appliance.
  4. Attach the right rail using four mounting screws.
    Attaching the Appliance to the rack.

ARISTA CCA-ETM-Q20 Edge Threat Management Appliance - Fig
3

1 Back rack post
2 Back bracket
3 Mounting screws| 4 Front rack post
5 Front bracket
6 Mounting screws
---|---

  1. Insert appliance into the racking at the predetermined height within the left side of the rack.
  2. Attach the left rear mounting bracket using three mounting screws.
  3. Attach the left front mounting bracket using three mounting screws.
  4. Repeat Steps 2 and 3 for the right side Appliance installation into the racking.

Chapter 5: Cabling the Appliance

This procedure is for attaching network and power cables to the appliance.

  1. Connect an Ethernet cable from your Internet provider modem or router to the designated Internet port.
  2. Connect an Ethernet cable from your management computer or LAN switch to port 1.
  3. Plug in a power cable to an AC power source and connect it to a power input on the rear panel.
  4. Plug in a second power cable to an AC power source and connect it to the second power input on the rear panel.

You can manage your appliance using the Edge Threat Management Dashboard or from the local network.
From Edge Threat Management Dashboard

  1. Navigate your web browser to https://edge.arista.com/cmd.
  2. Log in with your Edge Threat Management Dashboard account, or click Create Account to set up an account.
  3. Navigate to the Appliances screen and click Add.
  4. Enter the serial number located on the bottom of your appliance.
  5. Click Add to confirm the new appliance.
  6. Complete the initial setup to begin managing your appliance.

From the Local Network

  1. Connect an Ethernet cable from your management computer or LAN switch to the LAN port.
  2. From your management computer, check the network status of your system and confirm that you receive an IPv4 address in the subnet of 192.168.2.0/24 (example: 192.168.2.100).
  3. In a browser, navigate to http://192.168.2.1.
  4. Follow the steps in your browser to complete the setup.

Appendix A: Status Indicators

A.1 Front Indicators
This section describes the front panel LED status of the CCA-ETM-Q20 appliance.
Figure 1: CCA-ETM-Q20 Front Status IndicatorsARISTA CCA-ETM-Q20 Edge
Threat Management Appliance - Fig 4

1 Power
2 Port indicator
3 LAN port indicators| 4 Storage activity
5 Storage power
---|---

A.2 Rear Indicators
This section describes the rear panel LED status of the CCA-ETM-Q20 appliance. 1 Power indicator

Appendix B: Parts List

Each appliance provides an accessory kit that contains parts that are required to install the appliance.
This section lists the installation parts contained in the appliance accessory kit.ARISTA CCA-ETM-Q20 Edge Threat Management Appliance - Fig
6

1 Back bracket
2 Mounting bracket
3 Mounting rail| 4 Power cable
5 Racking mounting screws
6 Appliance mounting screws
---|---

The CCA-ETM-Q20 package includes:

  • Two power cables
  • Rack mounting hardware
  • CCA-ETM-Q20 appliance

The installation kit provides the following four-post mounting parts:

  • 2 – Front mounting brackets (left and right).
  • 2 – Rails (left and right).
  • 6 – Screws for the front mounting brackets
  • 10 – Screws to attach the side rails to the chassis and the back plates to the rails.
  • 2 – Back plates (left and right).

Appendix C: Front Panel

ARISTA CCA-ETM-Q20 Edge Threat Management Appliance - Fig
7

1 Reset button
2 LCD controls
3 LAN ports
4 SFP+ LAN ports| 5 Console port
6 Internet port
7 USB ports
---|---

Appendix D: Rear Panel

The following displays the CCA-ETM-Q20 rear panel.ARISTA CCA-ETM-Q20 Edge
Threat Management Appliance - Fig 8

1 Fans
2 Video out (HDMI)
3 Power switch
4 PSU handle| 5 Power supply socket
6 PSU handle
7 Power supply socket
8 Power supply units
---|---

Appendix E: Regulatory Model Numbers

This appendix lists the Regulatory Model Numbers (RMNs), where applicable, for the product models for the appliances described in this document.

Regulatory Model Number (RMN) Product Number(s)
AN2204, CAR-4040-5200-E90 CCA-ETM-Q20

Appendix F: Taiwan RoHS Information

This appendix provides Taiwan RoHS information for appliances covered by this guide.
For Taiwan BSMI RoHS Table, go to https://www.arista.com/assets/data/pdf/AristaBSMIRoHS.pdf.

ARISTA logo

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

ARISTA User Manuals

Related Manuals