MORNINGSTAR RB-RELAY snap-in Ready Relay Block Instruction Manual
- June 9, 2024
- Morningstar
Table of Contents
- MORNINGSTAR RB-RELAY snap-in Ready Relay Block
- Installation and Operation Instructions
- [DIMENSIONS millimeters (inches)
- OVERVIEW and FEATURES
- FEATURES
- INSTALLATION
- Mounting
- CONFIGURATION
- WIRING
- General Use
- LED INDICATIONS and TROUBLESHOOTING
- WARRANTY
- RELAY SPECIFICATIONS
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
MORNINGSTAR RB-RELAY snap-in Ready Relay Block
Installation and Operation Instructions
For the most recent manual revisions, see the version at:
www.morningstarcorp.com
Use following URL to register Morningstar ReadyRelay:
https://www.morningstarcorp.com/product-registration
DIMENSIONS [millimeters (inches)
SAFETY INFORMATION
WARNING: Shock Hazard The Morningstar ReadyRelay must be installed by a
qualified technician in accordance with the electrical regulations of the
installation location.
WARNING: Shock Hazard Disconnect all power sources to the host and all
other connected devices before working with ReadyRelay wiring. Do not install
or remove a
ReadyRelay while the host device is powered ON.
CAUTION: Equipment Damage The relay circuit has no overcurrent
protection. A fuse no larger than six (6) Amps must be installed – in either
leg – to protect the circuit. Since the internal relay circuitry has no
overcurrent protection, the installer must ensure that the circuit is fused.
ReadyRelay failures that result from lack of overcurrent protection are not
covered by the Morningstar warranty.
CAUTION: Equipment Damage Power surges with in-rush current greater than
10 Amps can damage the relay.
WARNINGS: Shock Hazards Read all the instructions and cautions in the
manual before starting the installation.
Beyond replacing the relays themselves, there are no user serviceable parts in
the ReadyRelay Block. Do not disassemble or attempt to repair.
OVERVIEW and FEATURES
- The ReadyRelay requires a Morningstar ReadyRailTM-enabled host device, e.g., GenStar controller or ReadyEdge System Monitor and Communication Center to provide a mounting surface, power, and programming capability.
- The ReadyRelay is an expansion block that adds AC or DC relay dry contact hardware functionality and firmware control and logic to the Morningstar GenStar MPPT charge controller.
- A ReadyRelay connected to the host device will automatically have its firmware updated with the host’s ReadyRelay firmware version. For the latest battery support and features, ensure that the host device has been updated with the most current host device firmware.
FEATURES
INSTALLATION
Morningstar ReadyRelays are DIN-Ready-rail-mounted, and have modular connectors on each side of the block. The left-side male connector mates with the host device female, while the right-side female connector is available for mating with another ReadyRelay (see Figure 1). Each ReadyRelay Block takes one available position on a DIN Rail – the left-most being Position 1.
WARNING: Shock Hazard Do not install or remove a ReadyRelay while host
device is powered ON. Always power OFF host device before working on
ReadyRelay wiring.
CAUTION: Host device configuration settings are made specifically for the
Ready Block positions. Hence, if a Ready(Relay) block is moved,it has to be
re-configured for the new postion. Similarly, be aware that exchanging two
ReadyRelays, e.g., between postions 1 and 2, might require re-configuration or
re-wiring, because the settings for Position 1 will apply to any Ready Block
installed in that position.
Mounting
The ReadyRelay is a modular accessory designed for installation onto a DIN-
ReadyRail.
To install ReadyRelays (see Figure 3-1 below):
- Power OFF host device. If applicable, remove Block cover and cut slot(s) for Block(s)
- Pull yellow tab out
- Fit Block slot downward onto DIN Rail
- Slide the Block to the left, but before joining the male and female mates, be sure that pin guards and pins are lined up correctly. Carefully slide the Block farther to the left to securely join the Block with host-device female mates.
- Push yellow tab in, to secure Block on rail
- Secure Block(s) to DIN Rail with cover, clamp, or other means provided with host device.
Figure 3-1. ReadyRelay Installation Detail
CONFIGURATION
First connect the battery to the host device to power the host device-relay
block system.
Although the host device’s meter layout (if present) closely resembles the
Morningstar web interface – LiveView – webpages, only relay toggle commands
can be made with the local meter display. Use one of the following methods to
configure the Relay Block in LiveView:
-
With the host device connected to a PC, open a Web browser, and either:
-
A) Enter the host device IP address into the address bar, e.g., http://192.168.1.253
The IP address can be found in the meter display in Settings\Network. OR, -
B) Enter the host device NetBIOS name [product abbreviation + 8-digit serial no.] into the address bar e.g. http://GS21320850. The NetBIOS name can be found in the meter display in Settings\Network.
CAUTION: Configure the ReadyRelay in the Morningstar LiveView webpage, FIRST, before wiring the relay.
Configure. Once in LiveView, enter the installer’s code – 141 – and then enable Installer Setup. Go to Ready Blocks. Any installed blocks will populate the ReadyRelay Configuration Box in the LiveView webpage. The location of each block is listed by positions 1-3, and relay A or B. Position 1 is the left- most block. Relay A is on the left, and relay B is on the right. Choose a block and relay to configure.
Relay Function. Choose how the relay will function: Threshold; Faults and Alarms; Charge Stage; External Source Control (ESC) Start-Stop; Command/Schedule. Each of the two Relay Block relays can be configured for a unique function:
- Threshold. Choose whether the threshold will be reached from a rising or falling level; choose a variable, and then enter the desired ON and OFF thresholds, along with desired delays.Activate ReadyRelays using Command buttons (after configuration in LiveView Installer ReadyRelay setup assignment).
- Faults/Alarms. Activates a relay for optional devices when Block is programmed for specifically occuring fault conditions:
- A) When charging has stopped due to a fault
- B) When charging has stopped due to high battery voltage
- C) When Load has disconnected due to a fault
- D) When Load has disconnected due to high battery voltage
- E) An over temp alarm has occured
- F) Charging current is being limited
- Charge Stage. Toggles the relay for use with optional devices when the selected charge period – Bulk, Absorption, Float, Equalization, Night – is active. Further, relay start and exit delays can optionally be entered.
- External Source Control (ESC) Start-Stop. (A) Assign a relay to, “ESC Start-Stop” signal. (B) Go back to LiveView\Installer Setup\ESC, and program accordingly for desired Timing Controls and custom ESC schedules.
- Command/Schedule. To allow a command to trigger relay activation
(Ready Blocks\Relay Block ON), assign relay as, “Command/Schedule”. Relays can also be scheduled for automatic operation.
IMPORTANT: To enable the use of Manual or Custom External Source Control Profiles, an ESC signal must be assigned to a relay (ReadyRelay Block).
NOTE: Proper generator/auxiliary equipment relay wiring is required – ReadyRelay terminal connections are indicated in Figure 1 on page 3.
WIRING
- WARNING: Shock Hazard Disconnect all power sources to the host and all other connected devices before working with ReadyRelay wiring. Do not install or remove a ReadyRelay while the host device is powered ON.
- WARNING: Shock Hazard Wire sizing and load overcurrent protection devices must conform to NEC or other jurisdictional requirements.
- CAUTION: Equipment Damage Incorrect installation or configuration may result in damage to the generator and/or other system components.
- CAUTION: External Source Control, e.g., generator control should only be configured and installed by experienced electrical professionals.
- CAUTION: Equipment Damage Incorrect installation or configuration may result in damage to the generator and/or other system components.
General Use
Relay contact terminals can be wired to a generator starting circuit, vent
fan, communications equipment, larger relays for power switching, buzzer or
trouble light (no auxiliary devices included).
After wiring, tighten the terminal connector screws to 5 in-lb (0.56 N-m) of
torque.
External Source Control (ESC)
The external source, e.g., generator must be an electric-start model with
automatic choke. It is recommended that the generator have two-wire start
capability. Consult the generator manufacturer’s autostart instructions for
twowire start generators.
A two-wire starting generator generally automates the cranking and starting
routine. The Relay Common and Normally Open (NO) terminals can be wired to
perform a two-wire generator start – see Figure 5-1 below.
System Power Up
Connect the battery to the host device to power the host device-relay block
system.
LED INDICATIONS and TROUBLESHOOTING
See Figure 2-1 in Section 2.0, and table below. The top ReadyRelay LED indicates Block status; the middle LED indicates operation of Relay A; the lower LED indicates operation of Relay B. The status LED will operate with a momentary heartbeat off every (5) seconds.
Status LED | Indication |
---|---|
Block not powered or could not start | OFF |
Normal condition – no faults | Green solid |
Block faulted | Red solid |
Powered pre-boot | Red solid |
Relay A or B LEDs | Indication |
--- | --- |
Relay open | OFF |
Relay closed or closing | Green solid |
Relay fault | Red solid |
WARRANTY
LIMITED WARRANTY – Morningstar Solar Controllers and Inverters
All Morningstar Professional SeriesTM products, except the SureSineTM inverter, are warrantied to be free from defects in materials and workmanship for a period of FIVE (5) years from the date of shipment to the original end user. Warranty on replaced units, or field-replaced components, will be limited only to the duration of the original product coverage.
Morningstar Essentials SeriesTM, and SureSineTM inverter, products are warrantied to be free from defects in materials and workmanship for a period of TWO (2) years from the date of shipment to the original end user. Warranty on replaced units, or field-replaced components, will be limited only to the duration of the original product coverage.
Morningstar will, at its option, repair or replace any such defective units.
WARRANTY EXCLUSIONS AND LIMITATIONS
This warranty does not apply under the following conditions:
- Damage by accident, negligence, abuse or improper use
- PV or load currents exceeding the ratings of the product
- Unauthorized product modification or attempted repair
- Damage occurring during shipment
- Damage resulting from acts of nature such as lightning, weather extremes or infestation
THE WARRANTY AND REMEDIES SET FORTH ABOVE ARE EXCLUSIVE
AND IN LIEU OF ALL OTHERS, EXPRESS OR IMPLIED. MORNINGSTAR SPECIFICALLY
DISCLAIMS ANY AND ALL IMPLIED WARRANTIES, INCLUDING, WITHOUT LIMITATION,
WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. NO
MORNINGSTAR DISTRIBUTOR, AGENT OR EMPLOYEE IS
AUTHORIZED TO MAKE ANY MODIFICATION OR EXTENSION TO THIS WARRANTY.
MORNINGSTAR IS NOT RESPONSIBLE FOR INCIDENTAL OR CONSEQUENTIAL DAMAGES OF ANY
KIND, INCLUDING BUT NOT LIMITED TO LOST PROFITS, DOWN-TIME, GOODWILL OR DAMAGE
TO EQUIPMENT OR PROPERTY.
RELAY SPECIFICATIONS
FOR CURRENT DETAILED CERTIFICATION LISTINGS, REFER TO:
https://www.morningstarcorp.com/support/library
Under, “Type”, choose, “Declaration of Conformity (DOC)”, to view list of
product DOCs.
- ReadyRelay and MeterbusTM
- Morningstar Corporation
- MODBUSTM and MODBUS TCP/IPTM are trademarks of Modbus IDA. ©2022 Morningstar Corporation. All rights reserved.
References
- Solar Charge Controllers & Inverters | Morningstar Off-grid Solar
- Fuck partners in Chico, CA tonight. Nude women in my bed.
- Product Registration - Morningstar Corporation
- Support Library - Morningstar Corporation
Read User Manual Online (PDF format)