vetus Electric Drive Instruction Manual
- June 9, 2024
- vetus
Table of Contents
vetus Electric Drive Instruction Manual
Send Form
- Date
- Reference number
Installer | Owner |
---|---|
Name | Name * |
Address | Address * |
Postcode + City | Postcode + City * |
Country | Country * |
Phone number | Phone number * |
E-mail * |
Information about vessel
Information about vessel | Length ova. * |
---|---|
Home port | Length well. * |
Builder | Beam well. * |
Voortstuwingsmotor
- Model *
- Serial number *
Application
Draft | m | Draft m Displacement |
---|---|---|
Application * | Make a choice | |
Material hull | Make a choice | |
Model | Make a choice | |
Propeller | Propeller shaft | |
--- | --- | |
Type * | Diameter * mm | |
Number of blades * | Flexible coupling * Yes No Model | |
Diameter x pitch * | Trust bearing * Yes No Model |
Installation
Accessibility * | Accessibility * |
---|
Is the engine lined up with the prop shaft/stern drive? * Yes No
Battery bank
Type * | 3 | Undervoltage protection Yes No |
---|---|---|
Total capacity (C20 EN) * | ||
Serial numbers | ||
1. | 4 | 7 |
2. | 5 | 8 |
3 | 6 | 9 |
*This information must be filled in.
Battery cable
Conductor cross section * | mm2 |
---|---|
Length positive cable * | m |
Suction line cooling system
Length | m | Diameter | m |
---|
Dry test
Standby (neutral gear) | A | V |
---|---|---|
Forward Idle | A | V |
Forward Max (eco) | A | V |
Forward Max (normal) | A | V |
Forward Max (power) | A | V |
Sea trail
Standby (neutral gear) V| | V|
---|---|---|---
Forward Max (eco)| A| V| V
Forward Max (normal)| A| V| V
Forward Max (power)| A| V| V
Conclusion dry test / sea trial
Passed Failed
Note
I hereby declare, by checking the items below, that they have been shared and explained to the customer:
- Owner’s manual, regular maintenance and safety information.
- Explain the importance of maintenance, and warranty activation.
- Explained and demonstrated the motor and motor LED indications.
- Dashoard instruments and alarm indications.
- Battery main switch and fuse.
- Keyswitch panel and control lever.
- Charge installation (shore connection, charger, inverter).
- Warranty conditions and terms.
- Approved by builder/installer
Date| Place
---|---
Name| Name - I hereby give permission for my data to be stored and used for contacting me
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>