AcuityBrands 912-00232-000 BH DIM Warm Dimming
LED IMPORTANT SAFETY INSTRUCTIONS
READ AND FOLLOW ALL SAFETY INSTRUCTIONS! SAVE THESE INSTRUCTIONS AND DELIVER TO OWNER AFTER INSTALLATION
-
To reduce the risk of death, personal injury or property damage from fire, electric shock, falling parts, cuts/abrasions, and other hazards please read all warnings and instructions included with and on the fixture box and all fixture labels.
-
Before installing, servicing, or performing routine maintenance upon this equipment, follow these general precautions.
-
Installation and service of luminaires should be performed by a qualified licensed electrician.
-
Maintenance of the luminaires should be performed by person(s) familiar with the luminaires’ construction and operation and any hazards involved. Regular fixture maintenance programs are recommended.
-
It will occasionally be necessary to clean the outside of the retractor/lens. Frequency of cleaning will depend on ambient dirt level and minimum light
output which is acceptable to user. Retractor/lens should be washed in a solution of warm water and any mild, non-abrasive household detergent, rinsed with clean water and wiped dry. Should optical assembly become dirty on the inside, wipe retractor/lens and clean in above manner, replacing damaged gaskets as necessary. -
DO NOT INSTALL DAMAGED PRODUCT! This luminaire has been properly packed so that no parts should have been damaged during transit. Inspect to confirm. Any part damaged or broken during or after assembly should be replaced.
-
Recycle: For information on how to recycle LED electronic products, please visit www.epa.gov.
-
These instructions do not purport to cover all details or variations in equipment nor to provide every possible contingency to meet in connection with installation, operation, or maintenance.
WARNING RISK OF ELECTRIC SHOCK
- Disconnect or turn off power before installation or servicing.
- Verify that supply voltage is correct by comparing it with the luminaire label information.
- Make all electrical and grounded connections in accordance with the National Electrical Code (NEC) and any applicable local code requirements.
- All wiring connections should be capped with UL approved recognized wire connectors.
WARNING RISK OF BURN
- Allow lamp/fixture to cool before handling. Do not touch enclosure or light source.
- Do not exceed maximum wattage marked on luminaire label.
- Follow all manufacturer’s warnings, recommendations and restrictions for: driver type, burning position, mounting locations/methods, replacement and recycling.
CAUTION RISK OF INJURY
- Wear gloves and safety glasses at all times when removing luminaire from carton, installing, servicing or performing maintenance.
- Avoid direct eye exposure to the light source while it is on.
CAUTION RISK OF FIRE
- Keep combustible and other materials that can burn, away from lamp/lens.
- Do not operate in close proximity to persons, combustible materials or substances affected by heat or drying.
CAUTION: RISK OF PRODUCT DAMAGE
- Never connect components under load.
- Do not mount or support these fixtures in a manner that can cut the outer jacket or damage wire insulation.
- Never connect an LED product to an unapproved dimmer pack. Contact ABL directly for any dimmers not specifically recommended for the product.
- Unless individual product specifications deem otherwise: Allow for some volume of airspace around fixture. Avoid covering LED fixtures with insulation, foam, or other material that will prevent convection or conduction cooling.
- Unless individual product specifications deem otherwise: Maximum ambient temperature is 90°C. Do not operate fixture at temperatures higher than this.
- Unless individual product specifications deem otherwise: Never mount in places where fixture will be exposed to rain, high humidity, extreme temperature changes or restricted ventilation.
- LED products are Polarity Sensitive. Ensure proper Polarity before installation.
- Electrostatic Discharge (ESD): ESD can damage LED fixtures. Personal grounding equipment must be worn during all installation or servicing of the unit.
- Do not touch individual electrical components as this can cause ESD, shorten lamp life, or alter performance.
- There are no user serviceable parts inside the unit. Do not rewire, reconfigure, or modify the unit or attempt any repairs yourself. Additionally, field replacement of the LED assembly or lamps is not allowed by UL standards at this time. In the unlikely event your unit may require service, stop using the unit immediately and contact an ABL representative.
All luminaires that contain electronic devices that generate frequencies above
9kHz from any component within the luminaire comply with one of the following
Part 15 of the FCC Rules. Operation is subject to the following two
conditions:
(1) This device may not cause harmful interference
(2) This device must accept any interference received, including interference
that may cause undesired operation.
This device complies with Part 18 of the FCC Rules but may cause interference
with cordless and cell phones, radios, televisions, and other electronic
devices. To correct the problem move the device away from the luminaire or
plug into a different outlet. This product may cause interference to radio
equipment and should
not be installed near maritime safety communications equipment or other
critical navigation or communications equipment operating between 0.45-30MHz.
Failure to follow any of these instructions could void product warranties. For
a complete listing of product Terms and Conditions, please visit
www.acuitybrands.com.
OUR BRANDS
- Indoor/Outdoor: Lithonia Lighting, Carandini, Holophane, RELOC
- Indoor Lighting: Gotham, Mark Architectural Lighting, Peerless, Renaissance Lighting, Winona Lighting
- Outdoor Lighting: American Electric Lighting, Antique Street Lamps, Hydrel, Tersen
- Controls: DARK TO LIGHT, Lighting Control & Design, ROAM, Sensor Switch, Synergy Acuity Brands Lighting, Inc. assumes no responsibility for claims arising out of improper or careless installation or handling of its products.
ABL LED General Warnings, Form No. 503.203
© 201 O Acuity Brands Lighting, Inc. All rights reserved. 12/01 /1 O
BHL Luminaire
INSTALLATION INSTRUCTIONS
General Identification of BHL Luminaire IMPORTANT: Wear cotton gloves AND lift and handle the luminaire from the ends to avoid damaging or soiling the lens surface. Should the lens surface become smudged or otherwise blemished, clean using only a soft, microfiber cotton cloth.
**Grid Ceiling Install (FG,TG)
**
-
Ensure grid spacing is accurate.
BHL 2’ intended for 0’-6” X 2’-0” O.C. grid
BHL 4’ intended for 0’-6” X 4’-0” O.C. grid -
Tilt and push the BHL luminaire through the intended spacing from the bottom. Angle the luminaire to clear the insulation detectors, if applicable. The luminaire ceiling flange should then overlap the room-facing grid piece.
-
For IP66 required applications Sealant or gasket must be field applied between overlap flange and grid rail to ensure room seal. Acuity Brands is not responsible for materials or installation that would ensure IP66 room rating.
Illustrated above is (FG) flat tee grid install. All step apply to (FG) and (TG). See step 6 for (TG) trim illustration. -
Locate the (4) grid support and alignment brackets. For your application select which tab height that will work best. Bend the tab 90 degrees to hold the fixture in place.
Support luminaire using a hole in grid bracket and tie luminaire to the structure. Luminaire must be supported by more than grid rails -
Locate and remove the access plate to the wire fixture. See the control wiring section for application-specific instructions.
-
Example of (TG) tegular tile install. All pervious steps are applicable to TG installation as well.
**Mud in Hard Ceiling Install (GB)
**
-
Check rough cut size and blocking is in place.
Blocking should be spaced 5-1/2” inches apart in all applications
BHL 2’ rough cut should be 0’-’5 ¼” X 1’-23 ¼”
BHL 4’ rough cut should be 0’-’5 ¼” X 3’-23 ¼” -
Locate and remove access plate to wire fixture. For the GB application the fixture must be wired before installation See control wiring section for application
-
Push luminaire into ceiling rough cut. Center the luminaire within the hole.
-
Fasten the luminaire to the ceiling using provided countersunk holes. Must fasten to blocking/structure behind visible ceiling. Ceiling fasteners by others, countersunk holes sized for #8 or #10 flat head screw.
-
Remove the ceiling trim and diffuser by removing the #8 TR15 fasteners.
-
Store the ceiling trim, diffuser, and fasteners for post mud installation. By removing these components, you reduce the risk to of mudding the luminaire closed or getting ceiling paint on the luminaire.
-
Using provided ridged trim to mud into ceiling. Avoid getting material into empty cavity where the diffuser and trim will be placed back in.
-
Reinstall the diffuser, ceiling trim and fasteners. Fasteners should be torqued to 17 in/lbs. Improper /installation of door and diffuser will not allow for IP66 room seal
**Flanged Hard Ceiling Install (FL)
**
-
Check rough cut size and blocking is in place.
BHL 2’ rough cut should be 0’-’5” X 1’-23 ¼”
BHL 4’ rough cut should be 0’-’5” X 3’-23 ¼”
If access is available to ceiling plenum skip to step 2 through 12 and continue with step 2B -
Locate and identify ceiling template side rails, 2 per luminaire template required.
-
Template side rail
-
Snap in teeth and alignment pieces
Notes:
Number of snap in teeth pieces will vary based on length
Snap in teeth with interact with spring clips on luminaire -
Locate and identify the ceiling template end plates, 2 per luminaire ceiling template required.
-
Assembly ceiling template, using the provided hex washer head screw (8 screws per template). Torque fasteners to 15in/lbs.
-
Final assembly of ceiling template. 2FT shown, template will vary based on length.
-
Rotate and tilt ceiling template through the ceiling rough cut.
-
Rotate the template in the plenum ensuring it is in the orientation shown above. If snap in teeth are not orientated correctly, damage to template, ceiling, or luminaire may occur
-
Center, fasten, and secure ceiling template in place. The blue arrows above illustrate the recommended location of fasteners through the ceiling template bottom flange.
Mounting means and/or fasteners provided by others. -
Locate luminaire access plate and make wiring connections. Insulation detectors may vary based on ordered configuration. If “NLT” or “NLIGHT” is ordered ensure to locate and plug in the RJ45 adaptor.
IMPORTANT Test luminaire to ensure its functioning properly before beginning to install within the ceiling template. -
Locate and identify the spring clips on the luminaire.
These will interact with snap in teeth on the ceiling template. -
For IP required applications Sealant or gasket must be field applied between overlap flange and ceiling before installed into ceiling. Acuity Brands is not responsible for materials or installation that would ensure IP66 room rating.
-
Tilt and push the luminaire into the rough cut until it snaps into place securely. Angle the luminaire so the insulation detector goes into the plenum first, if applicable. The spring clips on the luminaire should engage the previously installed ceiling template. If engagement is not occurring, please verify step 7-10 for template location.
Push the luminaire against ceiling to minimize gaps and finish installation.
Step 12 concludes non plenum access (FL) installations, Step 2B through 5B illustrates optional plenum access (FL) installation
- Locate and identify the support bracket on the luminaire. If access to plenum is available and/or using snap in template is not possible the luminaire can be supported via these brackets.
- For IP required applications Sealant or gasket must be field applied between overlap flange and ceiling before installed into ceiling. Acuity Brands is not responsible for materials or installation that would ensure IP66 room rating.
- Tilt and push the luminaire into the rough cut and support the luminaire using the support brackets illustrated in step 2B. Mounting means and/or fasteners provided by others.
- Locate luminaire access plate and make wiring connections. Insulation detectors may vary based on ordered configuration. If “NLT” or “NLIGHT” is ordered ensure to locate and plug in the RJ45 adaptor.
Control Wiring
IMPORTANT****
Contact tech support for any additional wiring questions @ 800.705.SERV(7378)
1400 Lester Rd NW, Conyers, GA 30012 Tel: 800.705.SERV(7378) Email: Website:
https://luminaireled.acuitybrands.com/
© 2021 Acuity Brands Lighting, Inc. All Rights Reserved. “LuminaireLED” is a
registered trademark of Acuity Brands Lighting. Products in this document may
be covered by one or more U.S. Patents and Patents Pending. Specifications are
subject to change without notice. A limited warranty applies.
Complete warranty terms located at
www.AcuityBrands.com/CustomerResources/Terms_and_Conditions.aspx
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>