FRYMASTER HLZ-22 Heated Landing Zone User Manual
- June 9, 2024
- FRYMASTER
Table of Contents
- HLZ-22 Heated Landing Zone
- WARRANTY STATEMENT
- PARTS ORDERING AND SERVICE INFORMATION
- HEATED LANDING ZONE
- INSTALLATION/SETUP
- OPERATION
- HLZ MODEL/COMPONENT IDENTIFICATION
- HLZ COMPUTER OPERATION AND PROGRAMMING
- Operator Troubleshooting Guide
- SERVICE INFORMATION
- Diagnostic Tests for HLZ
- Wiring Diagram
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
SERVICE MANUAL
HEATED LANDING ZONE (HLZ 18 AND HLZ 22)
HLZ-22 Heated Landing Zone
This equipment chapter is to be inserted in the Equipment Manual.
MANUFACTURED BY FRYMASTER, L.L.C.
8700 Line Avenue
SHREVEPORT, LOUISIANA 71106
PHONE 1(318) 865-1711
1 (800) 24 FRYER
NOTICE
IF, DURING THE WARRANTY PERIOD, THE CUSTOMER USES A PART FOR THIS FRYMASTER
DEAN EQUIPMENT OTHER THAN AN UNMODIFIED NEW OR RECYCLED PART PURCHASED
DIRECTLY FROM FRYMASTER DEAN, OR ANY OF ITS AUTHORIZED SERVICE CENTERS, AND/OR
THE PART BEING USED IS MODIFIED FROM ITS ORIGINAL CONFIGURATION, THIS WARRANTY
WILL BE VOID. FURTHER, FRYMASTER DEAN AND ITS AFFILIATES WILL NOT BE LIABLE
FOR ANY CLAIMS, DAMAGES OR EXPENSES INCURRED BY THE CUSTOMER WHICH ARISE
DIRECTLY OR INDIRECTLY, IN WHOLE OR IN PART, DUE TO THE INSTALLATION OF ANY
MODIFIED PART AND/OR PART RECEIVED FROM AN UNAUTHORIZED SERVICE CENTER.
FOR YOUR SAFETY
DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS AND LIQUIDS IN THE
VICINITY OF THIS OR ANY OTHER APPLIANCE.
THIS SERVICE MANUAL SUPERCEDES
ALL PREVIOUS EDITIONS OF THE HLZ SERVICE MANUAL.
DO NOT OPERATE OR SERVICE THE HLZ SERIES WITHOUT FIRST READING THIS MANUAL.
DO NOT OPERATE THE HLZ SERIES UNLESS IT HAS BEEN PROPERLY INSTALLED AND
CHECKED.
DO NOT OPERATE THE HLZ SERIES UNLESS ALL SERVICE AND ACCESS PANELS ARE IN
PLACE AND PROPERLY SECURED.
DO NOT ATTEMPT TO REPAIR OR REPLACE ANY COMPONENT OF THE HLZ SERIES UNLESS ALL
POWER TO THE UNIT HAS BEEN DISCONNECTED.
USE CAUTION WHEN SETTING UP, OPERATING, OR CLEANING THE HEATED LANDING ZONE TO
AVOID CONTACT WITH HEATED SURFACES.
HAZARD COMMUNICATION STANDARD, (HCS) – THE PROCEDURES IN THIS MANUAL INCLUDE
THE USE OF CHEMICAL PRODUCTS. THESE CHEMICAL PRODUCTS WILL BE PRINTED IN BOLD
FACE, FOLLOWED BY THE ABBREVIATION (HCS) IN THE TEXT PORTION OF THE PROCEDURE.
SEE THE HAZARD COMMUNICATION STANDARD, (HCS) MANUAL FOR THE APPROPRIATE
MATERIAL SAFETY DATA SHEET(S), (MSDS).
WARRANTY STATEMENT
The Frymaster Corporation makes the following limited warranties to the
original purchaser only for this equipment and replacement parts:
WARRANTY PROVISIONS – HEATED LANDING ZONE
A. The Frymaster Corporation warrants all components against defects in
material and workmanship for a period of 2 years.
B. All parts, with the exception of fuses, are warranted for 1 year after
installation date of cabinet.
C. If any parts, except fuses, become defective during the first year after
installation date, Frymaster will also pay straight-time labor costs to
replace the part, plus up to 100 miles/160 km of travel (50 miles/80 km each
way).
PARTS RETURN
A. All defective in-warranty parts must be returned to a Frymaster Authorized
Factory Service Center within 60 days for credit. After 60 days, no credit
will be allowed.
WARRANTY EXCLUSIONS
This warranty does not cover equipment which has been damaged due to misuse,
abuse, alteration, or accident such as:
- improper or unauthorized repair;
- failure to follow proper installation instructions and/or scheduled maintenance procedures as prescribed in your MRC cards;
- improper maintenance;
- damage in shipment;
- abnormal use;
- removal, alteration, or obliteration of the rating plate;
This warranty also does not cover:
- transportation or travel over 100 miles/160 km (50 miles/80 km each way), or travel time over two (2) hours;
- overtime or holiday charges;
- consequential damages (the cost of repairing or replacing other property which is damaged), loss of time, profits, use or any other incidental damages of any kind.
There are no implied warranties or merchantability or fitness for any
particular use or purpose.
For international warranty, the above procedures apply, except that the
customer is responsible for freight and duty charges.
PARTS ORDERING AND SERVICE INFORMATION
Parts orders may be placed directly with your local Frymaster Factory
Authorized Servicer (FAS)/Distributor. A list of Frymaster FASC/ Distributors
is posted at WWW.frymaster.com. If you do not have
access to this list, please contact the Frymaster Service Department at
1-800-24-FRYER or 1-318-865-1711.
To speed up your order, the following information is required:
Model Number __
Serial Number __
Voltage ____
Item Part Number
Quantity Needed ____
Service may be obtained by contacting your local Frymaster Authorized Servicer
/Distributor. Service information may be obtained by calling the Frymaster
Service Department. The following information will be needed in order to
assist you quickly and efficiently:
Model Number
Serial Number
Nature of the Problem ___
Also any other information which may be helpful in solving your service
problem.
RETAIN AND STORE THIS MANUAL IN THE EQUIPMENT MANUAL FOR FUTURE USE.
HEATED LANDING ZONE
The Heated Landing Zone or HLZ is designed to hold assembled sandwiches. By circulating heated air evenly across the open staging area, the Heated Landing Zone keeps sandwiches hot without drying or cooking. The Heated Landing Zone meets all McDonald’s standards for safety, efficiency, food safety, and cleanliness.
INSTALLATION/SETUP
Installed ( Upon arrival, inspect the HLZ for concealed damage. Immediately
report any damage to the delivering freight company. Claims must be filed
within 15 days after
receipt of the unit.
Make sure that the unit is placed on an even surface and that the area
surrounding the HLZ is free of clutter that would interfere with air flow.
INSTALL OPTIONAL BURGER BUMPER (Units built before 10/98)
The burger bumper may be placed on either side of the HLZ to prevent pass
through of product. Burger bumpers are provided by the KES. See figure 1.
INSTALL FILTER SCREEN (Units built after 10/98)
The filter screen is design to prevent debris from entering the Computer Cowl
Assembly and clogging the blower assembly. Simply fit the part on to the vent
opening of the
computer cowl assembly. The filter screen will snap into position. If equipped
with an optional holding screw, tighten screw to pull the filter screen snug
into position.
- If the 240 VAC model is operated on 208 VAC, the unit will heat slowly and may not reach maximum temperature. If the 208 VAC model is operated on 240 VAC, component damage is probable. To ensure proper operation, the power source should match the voltage on the rating plate on the bottom of the HLZ.
THIS APPLIANCE IS EQUIPPED WITH A GROUNDING PLUG FOR YOUR PROTECTION AGAINST SHOCK HAZARD AND MUST BE PLUGGED INTO
A PROPERLY GROUNDED RECEPTACLE. DO NOT CUT OR REMOVE THE GROUNDING PRONG FROM THIS PLUG.
POWER REQUIREMENTS:
- Voltage – Two models are available: 208 VAC and 240 VAC*
- Frequency – 60 Hz
- Single Phase
- 20 amp Service
OPERATION
- Plug the unit into the power source.*
- See “HLZ COMPUTER OPERATION AND PROGRAMMING, Section 7” for proper setup and operation of the computer.
- Place product in the HLZ in accordance with the restaurant’s established procedures.
- CLOSING – When closing the store, remove all product from the HLZ and perform daily preventive maintenance in accordance with the MRC. Turn the computer OFF.
HLZ MODEL/COMPONENT IDENTIFICATION
HLZ COMPUTER OPERATION AND PROGRAMMING
7. 1 Programming Temperature
You are able to program the setpoint temperature of both the air heater and
the heater plate via the computer interface. The heater plate factory default
is set to the McDonald’s standard of 160°F. The air heater factory default is
set to the McDonald’s standard of 220°F. If the factory default temperature
settings are acceptable, skip to Section 7.2, Page 6.
Ensure that the HLZ computer is in the OFF position (nothing in the display).
Press the check switch and enter the code (1,2,3,3). The numerals in the upper
right-hand corner represent the key number.
The display will read SET and the LEDs on both the Heater Plate Switch (1) and
the Air Heater Switch (4) will light. Press the switch that corresponds to the
heater you wish to program.
Display reads SET, and LED’s light.
Press to program the heater plate or to program the air heater.
Press the Up and Down Arrow Keys to achieve the desired set-point temperature,
then press the Check Switch once. Both heater LEDs will again light.
Press or to get desired setpoint, then press to lock the temperature in.
If you are finished with programming both heaters, press the Check Switch
again to store the programmed setpoints and exit the programming mode OR to
change the setpoint temperature for the other heater, press the corresponding
Heater Switch (1 or 4). Program as described in Step 4.
When finished, press again to exit programming mode. To change the other
heater, press to program the heater plate or to program the air heater, then
go to Step 4 for instructions.
7.2 Operation
1. Press the ON/OFF switch to the ON position (the display will light and
cycle through an initialization sequence). The display will read –LO- until
the air heater and heater plate are within 15°F of setpoint. It will take
approximately 10 minutes for the HLZ to achieve operating temperature.
Press to turn on the computer. The display will read until both heaters are
within 15°F of setpoint
NOTE: A small LED will light in the display when either the heater plate
or air heater is energized.
When the HLZ is ready for operation, the display reads REdY (ready). Place
product in the HLZ in accordance with the restaurant’s established procedures.
NOTE: To check the actual temperature of a heater, press the
corresponding Temperature Switch once. To check the setpoint temperature of a
heater, press the switch twice (an indicator will light when the setpoint is
displayed).
Operator Troubleshooting Guide
Symptom | Possible Cause |
---|---|
No computer display; no flow from air tower | No power |
Circuit breaker out Low voltage
Bad fuse
Bad transformer Hi-limit out
No flow from air tower| Bad latching relay
After 20 minutes of operation computer display shows PROB| RTD probe has
failed. Isolate failed component by checking temperature of air and heater
plate with the temperature display keys on the computer. The plate temperature
should be within ± 15°F of setpoint. The air heat should be within ± 25°F of
setpoint. If both temperatures are good. the coinputer is likely bad.
After 20 minutes of operation computer display shows HI| Plate heater. plate
heater relay or RTD are faulty.
After 20 minutes of operation computer display shows LO| Air heater, air
heater relay or RTD are faulty
SERVICE INFORMATION
9.1 PARTS LIST
Description | Part Number |
---|
Transformer, 208V/240V/12V
Transformer 230V (CE)
Air Heater, 208V
Air Heater 230V (CE)
Air Heater, 240V
Shield, HLZ Heater
Air RTD Probe
Bracket, RTD/Thermocouple
Delivery Air Back W/A
Air Thermocouple
HLZ 22 Plate, Heater with RTD and
Thermocouple, 208V/240V (22”x15.5”)
HLZ 18 Plate, Heater with RTD and
Thermocouple, 208/240V (22”x12”)
Line Filter (CE)
Plug Assembly, Computer
Air Relay, SS Service
Plate Relay, SS Service
Relay, Latching
Blower, 230V (CE)| 807-0979
807-3185
826-1549
807-3630
807-3011
900-8486
807-3036
900-8366SP
823-2741
807-3043
806-9238SP
806-9239
807-2818
806-9636
826-2038
826-1958
807-3021
807-3691
Blower, 208V/240V
Hi-Limit
Fuse Block
Fuse, 20A
Cordset, Twist Lock, HLZ
Cordset, CE
Cordset, Japanese
Cordset, China
Bushing, Right Angle Strain Relief
Adapter, Right Angle Strain Relief (Wshr) RTV#108 Silicone Rubber
Gasket, HLZ Plate/Cowl
Filter Screen
Acrylic Tape
Controller Assembly, HLZ McD
Controller Assembly, SHS Generic
Cowl Assembly
Cowl Tinnerman Clips
Front Delivery Air W/A
Lug, Grounding 14 GA
Pad, HLZ Leg| 807-3637
807-3631
807-2820
807-2819
807-3020
807-1696
807-3419
807-4409
807-3477
200-0965
811-0511
816-0418
810-1724
811-1042
826-2535
812-2277
823-2745
809-0448
823-2742
807-2972
826-1561
---|---
9.2 Interior view of an HLZ (Cowl Assembly removed)
9.3 Repair Procedures
1. Accessing the interior of the HLZ (Set up for testing):
a. Disconnect power cord from outlet.
b. Turn unit on its side. Remove the five access screws located on the bottom
of the unit.
c. Then set the unit back down on its base. Place paper towels on the heater
plate to protect it from scratching. Remove the cowl assembly and lay the cowl
on the heater plate while troubleshooting.
9.4 Replacing Solid State Relays:
a. Avoid miswiring. Examine the terminals carefully and take notes to avoid
miswiring.
b. Remove the plate holding the relay assembly. The nuts holding the relays in
place are easier to reach with the assembly out of the unit.
c. Remove the two nuts holding relays to plate.
d. Apply heat sink compound and install new relay.
e. Reverse this procedure to reinstall.
The cowl assembly is held on by five screws, which are removed from the bottom of the unit.
The relays are best replaced by removing the plate that holds them in place.
Two 5/16 nuts hold the plate in place.
9.5 Opening the Air DeliveryTower:
a. The air thermocouple and air RTD are located in the air delivery tower. To
access them, the front air delivery assembly must be removed.
b. Insert a 5/16” nut driver through the front air delivery assembly access
holes and turn the nuts counterclockwise to loosen. Do not remove the nuts.
Grab the bottom
flange of the front air delivery, push upwards and pull towards you. Be
careful, there are two tabs on the front air delivery bottom that must clear
the heater plate to allow removal of the front air delivery.
9.6 Replacing Air Thermocouple and Air RTD Probe:
a. Follow procedures in section 9.3. to access the Air Delivery tower
components.
b. Cut old lead wires close to the faulty air thermocouple or Air RTD Probe.
Disconnect lead wires at the test plug. Leave lead wires in place for now.
c. Remove the faulty Air Thermocouple or Air RTD Probe from the bracket.
d. Install the replacement Air Thermocouple or Air RTD Probe into the bracket.
e. Attach the new lead wires to the old lead wires on the Air Thermocouple or
Air RTD Probe on the bracket-side of unit. Grasp the old leads at the test
plug and gently pull the leads towards you.
f. Once the new lead wires have been pulled through, disconnect the old lead
wires, and attach the new leads to the test plug.
g. Go to step 9.3.2 and reassemble the air delivery tower.
9.7 Accessing the Plate and Air Heaters:
a. Use the following method to remove theplate heater assembly or access
thecompartment underneath the plateheater.
b. Remove the cowl assembly per steps9.3.
After cutting the acrylic adhesive between the heater plate and the HLZ
chassis, use a screwdriver to gently lift the heater plate.
c. Then remove the air delivery assembly following steps in 9.5.
d. Insert a thin, sharp knife, i.e.
Exacto-type, between the heater plate and the HLZ chassis. Carefully cut the
silicon adhesive between the heater plate and the chassis.
Gently lift the heater plate, which may still be stuck to the adhesive. Apply
new acrylic tape to the chassis before reinstalling the heater plate.
e. Lift the heater plate by prying up one end of the heater plate away from
the HLZ chassis. The plate is held in place by an acrylic tape. It will be
difficult to break the bond between the heater plate and chassis.
NOTE: A hot platen is easier to remove. The heat makes the adhesive more
pliable.
f. Remove acrylic tape from the heater plate and frame to prevent rebounding
while servicing.
g. When reinstalling the heater plate, apply new acrylic tape to the HLZ
chassis first. Then position the heater plate standing on its side against the
back air delivery assembly. The heater plate leads should be coming off the
“top” edge of the heater plate.
h. Once the heater plate is aligned properly with the HLZ chassis, gently
lower the heater plate until the plate end with the lead wires is
approximately 2 inches from the chassis. Feed the leads through the opening in
the chassis wall.
i. Finish lowering the heater plate into place and connect the heater plate
lead wires.
9.8 Replacing Hi-limit
a. Follow steps in Accessing plate and air heaters, 9.7.
b. Remove the shield over the air heater
c. Remove the brace on the left side of the base assembly, exposing the wire
raceway.
d. Remove the grommets the hi-limit wiring passes through.
e. Remove the existing hi-limit and pull wiring through cabinet.
f. Mount the hi-limit on the the spacers, providing a stand-off from the
panel..
g. Push the wires through the raceway toward the transformer on the controller
side of the HLZ.
h. Slip the wires from the hi-limit into the area occupied by the transformer.
i. Slip the hi-limit wires into the removed grommets and snap back into place.
j. Plug the black wire leading from pin 1 in the computer plug into the
terminal of the hi-limit.
k. Plug the other hi-limit terminal onto the transformer.
l. Ensure all connections are tight.
m. Retie the wiring assembly
n. Replace the brace, which forms the wire raceway.
o. Replace the metal shield over the air heater.
p. Clear away the old adhesive holding the heater plate in place.
q. Put the single-back adhesive in place adhesive-side down and position the
heater plate.
r. Ensure the heater plate’s ground wire is reconnected.
s. Plug the 15-pin connector into the computer and replace the controller
housing.
t. Reassemble unit as described in step 9.9 below.
The wires for the hi-limit are routed through the hole used by the RTD wiring. Slip the wires into slot (shown above) and into the hole.
The wire is routed from the air cowling, through the raceway, emerging at the transformer.
9.9 Reinstalling the Cowl Assembly and Air Delivery Assembly/Gasket Installation
a. Cowl Assembly:
- Clean surface area thoroughly.
- Remove any old adhesive.
- Apply a new gasket to bottom edge ofthe cowl assembly.
- Test fit the cowl assembly to see if a gap is visible once the cowl assembly is properly seated. If a gap remains, apply a second gasket to create a better seal.
- Plug in the computer harness and reinstall the cowl assembly .
b. Air Delivery Tower Assembly:
- Clean surface area thoroughly.
- Remove any old adhesive.
- Apply new gasket along bottom edge of the front air delivery panel.
- Test fit the air delivery assembly to see if a gap is visible once the assembly is properly seated. If a gap remains, apply a second gasket to create a better seal.
- Make sure the brackets on the back-side of the front air delivery assembly slide up and under the nuts on the back air delivery mounting screws (see figure 9-8). Once the front air delivery tabs clear the heater plate and the front air delivery is seated, tighten the mounting screws to pull the front air delivery flush against the back air delivery assembly. An air seal is created between the lower sections of the front air delivery and back air delivery assemblies. This seal forces the heated air up the rear and then down the front-side of the front air delivery assembly. After reinstalling the air delivery tower, reseal around the heater plate with RTV #108 silicone rubber compound, PN 8110511.
Diagnostic Tests for HLZ
10.1 Relays
The following tests are conducted with power applied.
Symptom: Air heater or plate heater will not heat.
Symptom: Air heater or plate heater over heats.
NOTE: Unit will display PROB if overheated. The probes are producing out
of range resistance. Allow unit to cool before checking probes.
Viewed from the front of the HLZ, the air heater relay is nearest the heater plate; the heater plate relay is nearest the front of the unit.
Tests:
- With power supplied and computer turned on, measure DC voltage across input terminals of relay. With computer calling for heat ( dot illuminated on display), the reading should be approximately 12 VDC. Failure to measure DC voltage points to a problem with the computer or connection.
- With power supplied and computer turned on, measure AC voltage across output terminals of relay. With computer calling for heat (dot illuminated in display), the reading should be .6 – .9 VAC. Reading line voltage with the computer calling for heat, indicates a failure of the computer to supply the necessary DC voltage to close the relay or a failure of the relay.
10.2 Computer
Symptom: Faulty or no display.
Symptom: No response to buttons.
Tests:
Input power
- With the computer disconnected, check for 12VAC between pins 1 and 3.
The pins in the computer plug are counted bottom to top, left to right starting with the pin marked by a protruding ridge.
Output power
- With the computer plugged in and turned on, check for 14VDC from pin 5 on the computer terminal to ground.
10.3 Transformer
Symptom: Unit has no display
Test:
- Line voltage should be measured across the input side of the transformer; 12VAC should be measured across the output side.
10.4 Plate Heater RTD
The following tests are conducted without power applied.
Symptom: Unit displays Probe. Actual plate temp is not within 5°F of setpoint.
Temperature must be taken from thermocouple built into unit.
Test:
-
With power removed from the HLZ, measure resistance between pins 9 and 13 on the computer plug and compare readings to listing on the resistance chart. With the unit cool, the resistance reading should approximate the resistance shown on the chart for the room temperature. Also check for short to ground. A chaffed wire shorting to the chassis can produce resistance readings within proper range.
Resistance ChartCentegrade| Fahrenheit| Ohms
21| 70| 1080
27| 80| 1101
32| 90| 1122
38| 100| 1143
43| 110| 1164
49| 120| 1185
54| 130| 1206
60| 140| 1226
66| 150| 1247
71| 160| 1268
77| 170| 1289
82| 180| 1309
88| 190| 1330
93| 200| 1350
99| 210| 1371
104| 220| 1391
110| 230| 1412
116| 240| 1432
121| 250| 1453
127| 260| 1473
132| 270| 1493
138| 280| 1514
143| 290| 1534
149| 300| 1554
Resistance chart
10.6 Plate Heater
Symptom: No heat when voltage is applied.
Symptom: Overheats
Tests:
- With power removed from the HLZ , measure resistance between terminal 4 (white wires) on the latching relay and terminal 4 on the plate heater relay. The reading should be 215 to 230 ohms on an HLZ 18; 150-180 ohms on an HLZ 22. Also, check for continuity to the chassis. Resistance seen there indicates a chaffed or shorted wire.
10.7 Air Heater
Symptom: No heat when voltage is applied.
Symptom: Overheats
Test:
- With power removed from the HLZ , measure resistance between pin 4 (white wire) on the latching relay and terminal 4 on the air heater relay. The reading should be between 18 and 26 ohms on a 208V unit and 25 and 33 ohms on a 240V unit. Also, check for continuity to the chassis. Resistance seen there indicates a chaffed or shorted wire.
10.8 Latching Relay
Symptom: Computer calls for heat (dot illuminated). No heat from plate and
blower doesn’t operate.
Test:
- With power removed from the HLZ and the wire removed from pin 1 or 0 of the latching relay, measure resistance between pins 1 and 0. It should be between 79 and 89 ohms.
The latching relay is positioned in the HLZ with the 0 and 1 terminals facing
the front of the unit.
10.9 Blower
Symptom: No airflow.
Symptom: Unit overheats; displays PROB.
Tests:
- Remove power from unit. On 208V units, disconnect black and white wires connecting blower to heat and latching relays. The resistance between the wires should be between 55 and 65 ohms.
- Remove power from unit. On 240V units, disconnect red and white wires connecting blower to heat and latching relays. The resistance between the wires should be between 62 and 72 ohms.
10.10 Hi-limit
Symptom: No display on controller.
Test:
- The hi-limit is in the 12-volt output from the transformer. Remove power from unit.
Disconnect the white braided lead from the wire leading from pin 1 on the computer plug.
Disconnect the white braided lead from the 12-volt side of the transformer. Check continuity in the hi-limit circuit.
Wiring Diagram
Printed in the United States
Frymaster L.L.C., 8700 Line Avenue, Shreveport, Louisiana 71106
318-865-1711
Service Hotline
1-800-24-FRYER
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>