Webstone 40613 3-4 Inch IPS with Drain Ball Valve Instruction Manual

June 9, 2024
Webstone

Webstone 40613 3-4 Inch IPS with Drain Ball Valve

Installation Instructions

IMPORTANT: Two different fitting designs are available, see tables to determine the correct insertion depth for a given product before proceeding with Installation Step 3.

Single O-Ring Design

Double O-Ring Design

Minimum Distances

IMPORTANT: A minimum distance is required between Press connections. Failure to provide the required distance may distort the pipe, resulting in an ineffective seal.

Compatible with popular press fit tools.
This product is designed for use with Type M or thicker copper tubing, and for operating temperatures between 0°F to 250°F
(-18°C to 120°C).
IMPORTANT: Follow all federal/national, state and local codes when installing, testing or performing work on systems. If you have any questions or comments, please contact us.

  • Step 1 – Cut Tubing: Cut the tubing to the proper length for the installation. Refer to section at top of page to determine fitting design type and appropriate insertion
    depth. Ensure the cut is straight, and the tubing remains round. Failure to do so
    may affect the performance of the joint.

  • Step 2 – Deburr Tubing: Both inside and outside of the tubing must be cleaned of burrs prior to installation. Failure to properly deburr the interior and exterior of the tubing may result in damage to the product’s O-ring.

  • Step 3 – Measure Pipe Insertion Depth:
    Measuring from the cut, mark the approximate insertion depth appropriate for fitting design.

  • Step 4 – Insert Pipe: Insert the tubing into the Press product and slowly turn until the product meets the line drawn in Step 3. Water may be used as a lubricant if desired, HOWEVER NO OTHER LUBRICANTS MAY BE USED.

  • Step 5 – Press Fitting: Verify that the pipe is fully inserted to the mark. When using Isolator Flanges, bolt the flange end in place before pressing the fitting to the tubing. Follow the instructions provided by the tool manufacturer to press the connection.
    1/2–2″ Models: Place the jaw of the tool at a right angle to the product and center the jaw on the ring in the connection.
    2½–4″ Models: Place the proper size XLC ring on the valve end.
    The piping system can be checked for leaks once all connections have been completed.
    In the event a leaky connection is found, re-press the fitting following the instructions above. System testing should be completed in accordance with requirements or codes of any federal/state/local governing body having jurisdiction over the installation. Pressure testing should not exceed the maximum pressure rating as noted on the product.
    WARNING: Cancer and Reproductive Harm – www.P65Warnings.ca.gov

800-225-9529
www.webstonevalves.com