BLAUBERG Box-S Duct Rectangular Smoke Extraction Fan User Manual
- June 9, 2024
- BLAUBERG
Table of Contents
- SAFETY REQUIREMENTS
- DELIVERY
- DESIGNATION KEY
- TECHNICAL DATA
- DESIGN AND OPERATING PRINCIPLE
- MOUNTING AND SET-UP
- CONNECTION TO POWER MAINS
- ASYNCHRONOUS ELECTRIC MOTOR STARTING METHODS
- Let us review three variations of a heavy start:
- COMMISSIONING
- TECHNICAL MAINTENANCE
- STORAGE AND TRANSPORTATION REGULATIONS
- MANUFACTURER’S WARRANTY
- CERTIFICATE OF ACCEPTANCE
- SELLER INFORMATION
- INSTALLATION CERTIFICATE
- WARRANTY CARD
- Documents / Resources
BLAUBERG Box-S Duct Rectangular Smoke Extraction Fan User Manual
SAFETY REQUIREMENTS
All operations described in this manual must be performed by qualified personnel only, properly trained and qualified to install, make electrical connections and maintain ventilation units. Do not attempt to install the product, connect it to the mains, or perform maintenance yourself. This is unsafe and impossible without special knowledge. Disconnect the power supply prior to any operations with the unit.All user’s manual requirements as well as the provisions of all the applicable local and national construction, electrical, and technical norms and standards must be observed when installing and operating the unit. Disconnect the unit from the power supply prior to any connection, servicing, maintenance, and repair operations.
Only qualified electricians with a work permit for electrical units up to 1000 V are allowed for installation. The present user’s manual should be carefully read before beginning works
Check the unit for any visible damage of the impeller, the casing, and the grille before starting installation. The casing internals must be free of any foreign objects that can damage the impeller blades. While mounting the unit, avoid compression of the casing! Deformation of the casing may result in motor jam and excessive noise. Misuse of the unit and any unauthorised modifications are not allowed. Do not expose the unit to adverse atmospheric agents (rain, sun, etc.). Transported air must not contain any dust or other solid impurities, sticky substances, or fibrous materials. Do not use the unit in a hazardous or explosive environment containing spirits, gasoline, insecticides, etc.Do not close or block the intake or extract vents in order to ensure the efficient air flow. Do not sit on the unit and do not put objects on it. The information in this user’s manual was correct at the time of the document’s preparation. The Company reserves the right to modify the technical characteristics, design, or configuration of its products at any time in order to incorporate the latest technological developments. Never touch the unit with wet or damp hands. Never touch the unit when barefoot. BEFORE INSTALLING ADDITIONAL EXTERNAL DEVICES, READ THE RELEVANT USER MANUALS
THE PRODUCT MUST BE DISPOSED SEPARATELY AT THE END OF ITS SERVICE LIFE. DO NOT DISPOSE THE UNIT AS UNSORTED DOMESTIC WASTE.
THE UNIT SHOULD NOT BE OPERATED BY CHILDREN OR PERSONS WITH REDUCED PHYSICAL, MENTAL, OR SENSORY CAPACITIES, OR THOSE WITHOUT THE APPROPRIATE TRAINING.
THE UNIT MUST BE INSTALLED AND CONNECTED ONLY BY PROPERLY QUALIFIED PERSONNEL AFTER THE APPROPRIATE BRIEFING. THE CHOICE OF UNIT INSTALLATION LOCATION MUST PREVENT UNAUTHORISED ACCESS BY UNATTENDED CHILDREN..
Duct rectangular smoke extraction fan is used in emergency exhaust ventilation systems for forced removal of smoke, heated gases and combustion products, as well as for general exhaust ventilation of shopping centres, garages, warehouses, and kitchens with themandatory use of grease filters. The unit is a component part and is not designed for independent operation. The unit is rated for continuous operation. Transported air must not contain any flammable or explosive mixtures, evaporation of chemicals, sticky substances, fibrous materials, coarse dust, soot and oil particles or environments favourable for the formation of hazardous substances (toxic substances, dust, pathogenic germs).
DELIVERY
NAME
NAME | NUMBER |
---|---|
Fan | 1 pc |
User’s manual | 1 pc |
Packing box | 1 pc |
DESIGNATION KEY
TECHNICAL DATA
The unit is designed for application with the ambient temperature ranging from -20 °C up to +40 °C and relative humidity up to 80 %. The fan is designed to remove smoke and air mixtures up to +400 °C for 120 minutes and for continuous operation at a temperature of the transported medium up to +100 °C. The unit is rated as a Class I electrical appliance. Motor protection degree according to IEC 60034-5 – IP55. The unit design is constantly being improved, thus some models may be slightly different from those described in this manual.
Model | Dimensions [mm] | Weight [kg] |
---|---|---|
A | A1 | A2 |
Box-S 25 (50 Hz) | 500 | 520 |
Box-S 28 (50 Hz) | 600 | 620 |
Box-S 31(50 Hz) | 600 | 620 |
Box-S 35 (50 Hz) | 700 | 720 |
Box-S 40 (50 Hz) | 700 | 720 |
Box-S 40 (60 Hz) | 816 | 66 |
Box-S 45 (50 Hz) | 800 | 820 |
Box-S 45 (60 Hz) | 918 | 83 |
Box-S 50 (50 Hz) | 800 | 820 |
Box-S 50 (60 Hz) | 954 | 95 |
Box-S 56 (50 Hz) | 900 | 920 |
Box-S 56 (60 Hz) | 1103 | 118 |
Box-S 63 (50 Hz) | 1000 | 1020 |
Box-S 71 (50 Hz) | 1200 | 1220 |
DESIGN AND OPERATING PRINCIPLE
The fan casing is made of galvanized steel. For periodic inspections,
inspection hatches are provided on the fan casing. The electric motor is
installed outside the air flow. The impeller with backward curved blades made
of heat-resisting steel. To control the speed, the fan can be equipped with
a frequency converter (not included in the delivery set, ordered separately)
MOUNTING AND SET-UP
BEFORE MOUNTING MAKE SURE THE CASING DOES NOT CONTAIN ANY FOREIGN OBJECTS (E.G. FOIL, PAPER).
WHILE INSTALLING THE UNIT ENSURE CONVENIENT ACCESS FOR SUBSEQUENT MAINTENANCE AND REPAIR.
Prior to mounting the unit:
- Make sure that the fan impeller rotates freely.
- Make sure there is no condensation on the motor.
- Check the electrical resistance of insulation between the motor windings and between each winding and the motor frame.
After installing the unit make sure that the fan impeller rotates freely.
The fan is installed between rectangular air ducts. Connect the fan to air
ducts with bolts and nuts. The fan must be fixed on independent hangers so
that it does not press the flexible joint (purchased separately) or the air
duct. It is recommended to suspend the fan to the ceiling using steel
reinforcement and threaded rods, or using perforated galvanized plates and
connecting them to the fan flanges or to an auxiliary structure. The fan may
be installed in any position in consideration of the air flow direction
(indicated by the arrow on the fan casing). When placed under the ceiling to
access the terminal box and motor, it is desirable to install the fan with the
motor downwards. Install a flexible joint (purchased separately) on both sides
of the fan. To protect the fan and air duct from dust, it is recommended to
install a filter upstream of the fan (purchased separately). If the fan is
mounted so that a person or object can come into contact with the impeller, a
protective grille must be installed (purchased separately). It is recommended
to install a 1.5 m long straight air duct at the fan outlet.
CONNECTION TO POWER MAINS
DISCONNECT THE POWER SUPPLY PRIOR TO ANY OPERATIONS WITH THE UNIT. CONNECTION OF THE UNIT TO POWER MAINS IS ALLOWED BY A QUALIFIED ELECTRICIAN WITH A WORK PERMIT FOR THE ELECTRIC UNITS UP TO 1000 V AFTER CAREFUL READING OF THE PRESENT USER’S MANUAL. THE RATED ELECTRICAL PARAMETERS OF THE UNIT ARE GIVEN ON THE MANUFACTURER’S LABEL.
- The unit is rated for connection to 1~230 V/50(60) Hz or 3~400 V/50(60) Hz power mains according to the wiring diagram. The wiring diagram is located inside the electric motor terminal box.
- The connection must be made using durable, insulated and heat-resistant conductors (cables, wires). The actual wire cross section selection must be based on the maximum load current, maximum conductor temperature depending on the wire type, insulation,length and installation method.
- Connection of the unit to the fixed power supply network must be carried out in accordance with the current regulations.
Access to the terminal box
ASYNCHRONOUS ELECTRIC MOTOR STARTING METHODS
There are several methods for starting asynchronous squirrel-cage electric motors. The most common methods are: direct-on-line (DOL), with a soft starter (SS) or with a frequency converter (FC).
Direct-on-line starting
In case of direct-on-line starting (i.e. by connecting the motor to the electric mains with a simple line contactor), the motor startingtime significantly increases due to high inertia of the impeller, which, in turn, results in high in-rush starting currents in the circuit. These currents of long duration may cause voltage slumps (especially if the feed line section falls short of the requirements), which may affect load operation.The in-rush current consumed by an electric motor in case of DOL starting is 5-8 times larger than the rated value (or even 10-14 times larger in some rare instances). It should be noted that the torque developed by the motor also significantly exceeds the rated value. Upon energisation the motor operates as a transformer with a squirrel-cage secondary winding formed by the rotor cage with a very low resistance. The rotor develops high induced current causing a rush of current in the feed line. The startup torque during starting averages 0.5-1.5 of the rated torque value. Despite such advantages as simple construction, high startup current, quick start and low cost, direct-on-line systems are suitable only in the following cases:
- the motor power is low compared to the mains power which limits the adverse effect of the rush of current
- the driven mechanism does not require gradual speed build-up or is equipped with a damping device to smooth out the inrush
- the high startup torque has no adverse effects on the operation of the driven mechanism
Soft start. SS starting.
A soft starter gradually increases the voltage supplied to the motor – from the initial to the rated value. This starting system can be used to meet the following goals:
- limit the motor current
- regulate the torque
Regulation by limiting the current sets the maximum in-rush current equal to 300-400 % (or 250 % in some rare instances) of the rated current and reduces torque characteristics. This type of regulation is especially suitedfor turbomachinery such as centrifugal pumps and fans. Regulation by variation of torque optimizes the torque during startup and reduces inrush current in the circuit. These conditions are suitable for mechanisms with constant load resistance. This type of soft starting may differ in the implementation pattern:
- motor start
- motor start and stop
- device bridging at the end of start sequence
- start and stop of several motors in stage circuits
Soft start. FC starting.
During the starting the FC raises the frequency from 0 Hz to the electrical mains frequency (50 or 60 Hz). As the frequency is increased gradually, the motor can be assumed to operate at its rated speed for a given frequency value. Furthermore, on the assumption that the motor runs at its rated speed the nominal torque should be immediately available whereas the current will be approximately equal to the rated value. This starting system is used for speed control and regulation and can be used in thefollowing cases:
- start with high-inertia load
- start with high load and limited-capacity power supply source
- optimization of electric power consumption depending on turbomachinery speed
The aforementioned starting system can be used for all types of mechanisms.
Problems associated with DOL starting
The problems caused by DOL starting may be divided into two groups:
- An abrupt start causes mechanical shock, jolts in the mechanism, shock removal of free play etc.
- A heavy start cannot be completed.
Let us review three variations of a heavy start:
-
The feed line performance is barely sufficient or insufficient to maintain the induced current.
Typical symptoms: Upon starting the circuit breakers at the system input are tripped; the lights, certain relays and contactors go off, and the supply generator shuts down.
Solution: In the best-case scenario an SS device may help reduce the in-rush current to 250 % of the motor rated current. If this is insufficient, an FC is necessary -
The motor cannot start the mechanism with DOL starting.
Typical symptoms: The motor fails to turn or “freezes” at certain speed which is maintained until actuation of the protection suite.
Solution: This problem may not be solved with an SS device. The motor develops insufficient shaft torque. However, this problem can be addressed by using an FC, but each case may be different. -
The motor spins up the mechanism with authority, but fails to reach the rated rotation speed.
Typical symptoms: The input automatic circuit breaker is tripped during spin-up. This often happens with heavy-weight fans with a considerable rotation speed.
Solution: Such problems may be addressed with an SS device, but not with 100 % certainty. The closer the motor speed to the rated value during the actuation of the protective equipment, the higher the chances of success. The use of an FC in this case helps solve the problem fundamentally
Standard switching equipment (automatic circuit breakers, contactors and motor starters) is not designed to withstand prolonged overloads normally causing the fan to shut down automatically DOL starting that continues for a long period of time. Using switching equipment with a higher maximum current rating renders the electric motor protection system less sensitive. As a result the switching equipment will not be able to detect motor overload in time due to a high current sensing threshold. Such problems as mentioned above can only be addressed by utilizing a soft starter or a frequency converter to start the fan.
COMMISSIONING
THE ORGANISATION RESPONSIBLE FOR THE COMMISSIONING SHALL BE RESPONSIBLE FOR PROPER MOTOR PHASING AND STARTING PATTERN SELECTION
DURING STARTING THE IN-RUSH CURRENTS OF THE FAN MAY SEVERAL TIMES EXCEED THE RATED VALUES. SEE “ASYNCHRONOUS ELECTRIC MOTOR STARTING METHODS” IN THE “CONNECTION TO POWER MAINS” SECTION
- After fan starting make sure that the electric motor rotates properly without undue vibration and abnormal noise.
- Make sure that the fan impeller rotates in the direction marked by the arrow on the fan casing. If necessary, change the rotation direction of the impeller by reversing the phase sequence (for a three-phase motor) or by rewiring according to the wiring diagram located inside the terminal box (for a single-phase motor).
- Make sure that the fan energy consumption complies with the value given on the equipment nameplate and check the motor for overheating.
- The phase current should be checked once the fan reaches the rated operating conditions.
- Do not switch the fan on and off several times without pauses as this may result in damage to the winding or insulation due to overheating.
TECHNICAL MAINTENANCE
DISCONNECT THE UNIT FROM POWER
SUPPLY BEFORE ANY MAINTENANCE OPERATIONS! MAKE SURE THE UNIT IS DISCONNECTED
FROM POWER MAINS BEFORE REMOVING THE PROTEC
Problem | Possible reasons | Elimination |
---|---|---|
The fan will not start. | No power supply. | Check the mains switch. Check the |
electrical connections according to the wiring diagram.
Jammed motor.| Carefully check the fan impeller for possible seizure and
eliminate it, if necessary. If the impeller is in order, replace the electric
motor.
The switching equipment activates upon fan start-up.| Short circuit in the fan
or the electric circuit between the fan and the switching equipment.|
Eliminate the cause of a short circuit.
Excessive current consumption due to an overload in the electric mains.|
Eliminate the cause of excessive current consumption.
Improper fan starting method.| Use a soft starter or frequency converter to
start the motor (see “Asynchronous Electric Motor Starting Methods” in the
“Connection to power mains” section).
Improper switching equipment.| Re-select the switching equipment in accordance
with the current regulations and equipment specifications.
The installed switching equipment is of poor quality or its actual performance
falls short of the rated values stated by the manufacturer.| Re-select the
switching equipment by choosing a unit which successfully passed commutation
and load tests and has a technical compliance certificate. The selection
should be limited to the top five foreign switching equipment manufacturers.
The fan fails to reach the required rotation speed due to serious overheating
of the fan motor.| Fan motor overloaded.| Eliminate the overload.
Improper fan starting method.| Use a soft starter or frequency converter to
start the motor (see “Asynchronous Electric Motor Starting
Methods” in the “Connection to power mains” section).
The fan motor runs at overload capacity with current consumption in excess of
the rated value.| The fan supplies more air than expected upon motor capacity
selection.| Measure network resistance. Throttle down the network (add
aerodynamic resistance to the air duct network).
Wrong motor phasing. The impeller rotates in the opposite direction of the
arrow on the fan casing.| If necessary, change the impeller rotation direction
by changing the phase sequence on the electric motor terminals.
Air ducts clogged.| Clean the air duct or the impeller.
The fan supplies more air than expected.| The resistance values used during
the ventilation network calculations are too conservative.| Check the air
ducts for proper shape and cross section as well as for any dampers present.
The cross section of air ducts increased and their number reduced during the
installation.| Throttle down the network (add aerodynamic resistance to the
air duct network).
Wrong choice of the fan.| Replace the fan with a unit of proper standard size.
The fan supplies less air than expected.| Wrong calculation of the ventilation
network and wrong selection of the fan.| Re-calculate the network parameters
and select a matching fan.
---|---|---
The network resistance exceeds the design calculations.| Re-arrange the
ventilation network to decrease its aerodynamic resistance.
Wrong direction of the impeller rotation.| If necessary, change the impeller
rotation direction by changing the phase sequence on the electric motor
terminals (see the “Commissioning” section).
Air leak through a loose air duct connection.| Eliminate the air leak. Seal
the air duct connection.
Impeller or air duct contamination with foreign objects or debris.| Clean the
impeller or the air ducts from foreign objects or debris.
Excessive noise or vibration both inside the fan and in the circuit.| Loose
screw connections.| Check the screw connections for proper tightness.
No flexible joints between the fan and the ventilation network on the suction
and discharge sides.| Install flexible joints.
Loose connection of valves and dampers to the air ducts.| Tighten up the
fasteners of valves and dampers.
Impeller or air duct contamination with foreign objects or debris.| Clean the
impeller or the air ducts from foreign objects or debris.
Worn bearings.| Replace the bearings.
Unstable power supply, unstable motor operation.| Check the stability of power
supply parameters and electric motor operation.
STORAGE AND TRANSPORTATION REGULATIONS
- Store the unit in the manufacturer’s original packaging box in a dry closed ventilated premise with temperature range from +5 ˚C to +40 ˚C and relative humidity up to 70 %.
- Storage environment must not contain aggressive vapors and chemical mixtures provoking corrosion, insulation, and sealing deformation.
- Use suitable hoist machinery for handling and storage operations to prevent possible damage to the unit.
- Follow the handling requirements applicable for the particular type of cargo.
- The unit can be carried in the original packaging by any mode of transport provided proper protection against precipitation and mechanical damage. The unit must be transported only in the working position.
- Avoid sharp blows, scratches, or rough handling during loading and unloading.
- Prior to the initial power-up after transportation at low temperatures, allow the unit to warm up at operating temperature for at least 3-4 hours
MANUFACTURER’S WARRANTY
The product is in compliance with EU norms and standards on low voltage guidelinesand electromagnetic compatibility. We hereby declare that the product complies with the provisions of Electromagnetic Compatibility (EMC) Directive 2014/30/EU of the European Parliament and of the Council, Low Voltage Directive (LVD) 2014/35/EU of the European Parliament and of the Council and CE-marking Council Directive 93/68/EEC. This certificate is issued following test carried out on samples of the product referred to above. The manufacturer hereby warrants normal operation of the unit for 24 months after the retail sale date provided the user’s observance of the transportation, storage, installation, and operation regulations. Should any malfunctions occur in the course of the unit operation through the Manufacturer’s fault during the guaranteed period of operation, the user is entitled to get all the faults eliminated by the manufacturer by means of warranty repair at the factory free of charge. The warranty repair includes work specific to elimination of faults in the unit operation to ensure its intended use by the user within the guaranteed period of operation. The faults are eliminated by meansof replacement or repair of the unit components or a specific part of such unit component
The warranty repair does not include:
- routine technical maintenance
- unit installation/dismantling
- unit setup
To benefit from warranty repair, the user must provide the unit, the user’s manual with the purchase date stamp, and the payment paperwork certifying the purchase. The unit model must comply with the one stated in the user’s manual. Contact the Seller for warranty service.
The manufacturer’s warranty does not apply to the following cases:
- User’s failure to submit the unit with the entire delivery package as stated in the user’s manual including submission with missing component parts previously dismounted by the user.
- Mismatch of the unit model and the brand name with the information stated on the unit packaging and in the user’s manual.
- User’s failure to ensure timely technical maintenance of the unit.
- External damage to the unit casing (excluding external modifications as required for installation) and internal components caused by the user.
- Redesign or engineering changes to the unit.
- Replacement and use of any assemblies, parts and components not approved by the manufacturer.
- Unit misuse.
- Violation of the unit installation regulations by the user.
- Violation of the unit control regulations by the user.
- Unit connection to power mains with a voltage different from the one stated in the user’s manual.
- Unit breakdown due to voltage surges in power mains.
- Discretionary repair of the unit by the user.
- Unit repair by any persons without the manufacturer’s authorization.
- Expiration of the unit warranty period.
- Violation of the unit transportation regulations by the user.
- Violation of the unit storage regulations by the user.
- Wrongful actions against the unit committed by third parties.
- Unit breakdown due to circumstances of insuperable force (fire, flood, earthquake, war, hostilities of any kind, blockades).
- Missing seals if provided by the user’s manual.
- Failure to submit the user’s manual with the unit purchase date stamp.
- Missing payment paperwork certifying the unit purchase.
The manufacturer shall not accept any claims with regards to the condition of the paint-and-lacquer coating (hereinafter PLC) in the following cases:
- Dents, cracks, scratches and abrasions of the PLC sustained during handling, mounting and assembly operations.
- Progress of corrosion on areas damaged with stones, sand, and roof coat tar during the performance of roofing work.
- Signs of direct exposure of the PLC to excessive temperatures, which occurred during the performance of roofing work.
- Violation of regulations on transportation, storage, installation, and operation of the unit.
- Presence of damage caused by exposure to industrial and chemical emissions, acidic or alkaline pollution, sap or other factors not related to normal operating conditions.
FOLLOWING THE REGULATIONS STIPULATED HEREIN WILL ENSURE A LONG AND TROUBLE-FREE OPERATION OF THE UNIT.
USER’S WARRANTY CLAIMS SHALL BE SUBJECT TO REVIEW ONLY UPON PRESENTATION OF THE UNIT, THE PAYMENT DOCUMENT AND THE USER’S MANUAL WITH THE PURCHASE DATE STAMP.
CERTIFICATE OF ACCEPTANCE
Unit Type | Duct rectangular smoke extraction fan |
---|---|
Model | |
Serial Number | |
Manufacture Date | |
**Quality Inspector’s Stamp** |
SELLER INFORMATION
Seller|
---|---
Address|
Phone Number|
E-mail|
Purchase Date|
This is to certify acceptance of the complete unit delivery with the user’s
manual. The warranty terms are acknowledged and accepted.
Customer’s Signature|
INSTALLATION CERTIFICATE
The __ unit is installed pursuant to the requirements stated in the present user’s manual.
Company name|
Address|
Phone Number|
Installation Technician’s Full Name|
Installation Date:| Signature:
The unit has been installed in accordance with the provisions of all the
applicable local and national construction, electrical and technical codes and
standards. The unit operates normally as intended by the manufacturer.
Signature:|
WARRANTY CARD
Unit Type | Duct rectangular smoke extraction fan |
---|---|
Model | |
Serial Number | |
Manufacture Date | |
Purchase Date | |
Warranty Period | |
Seller |
Documents / Resources
|
BLAUBERG Box-S Duct Rectangular Smoke Extraction
Fan
[pdf] User Manual
Box-S Duct Rectangular Smoke Extraction Fan, Box-S, Duct Rectangular Smoke
Extraction Fan, Rectangular Smoke Extraction Fan, Smoke Extraction Fan,
Extraction Fan, Fan
---|---
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>