LIVING basics Single Handle Pressure Balance Bath Faucets User Manual
- June 3, 2024
- LIVING basics
Table of Contents
LIVING basics Single Handle Pressure Balance Bath Faucets
Single Handle Pressure Balance Bath Faucets
Solid Brass Construction
Pressure Balance Valve/Gear Type Easy Installation
DIAGRAM AND PARTS LIST
- Shower arm
- Gasket
- Shower head
- Setscrew
- Valve body
- Cover plate
- Tapping screw
- Panel
- Handle
- Screw
- Red/ blue button
- Allen key
- Diverter
- Screw
- Button
- Elbow
- Hand shower
- Gasket
- Flexible hose
RECOMMENDED TOOLS
RECOMMENDED
ASSEMBLY INSTRUCTIONS
- Installation reference size ,main body fixed size( width 40mm ) . Knock 2pcs setscrews(4) into holes .
- Connect the pipes into the valve body(5) ; Put valve body(5) in the hole and fix it by the screw(7) . then connect the water supply hoses .
- Plug the water outlets after the valve body is installed.
- Remove the black cover plate(6). Install the handle(9) and diverter(13).Provide water from water inlet.And then test the water pipes leaking or not as below:
- Test 3 min @ 1.6 Mpa when the ceramic cartridge is closed.
- Test 3 min @ 0.4 Mpa when the ceramic cartridge is open. Proceed to next step if no leaking after the testing.
- Remove handle(9) and diverter(13), put on cover plate(6) after water test is ok.
- Backfill the wall in concrete, tile on concrete and then remove the black cover plate(6)when available.
- Feed the valve body with panel(8), handle(9) and diverter(13), then use the allen key(12) and screw(10)/(14) to secure handle(9) and diverter(13), put on the red/ blue button(11)/(15).
- Take off hand shower, up and down plugs, turn on the cartridge to wash out the dirt in the water tube.
- Use the tape to install in turn, shower arm (1), elbow(16). Then install the shower head(3) with the gasket(2).
- Connect the flexible hose(19), gasket(18) and hand shower (17). Testing for leakage after installation. Complete installation.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>