NABIS B61625 Tap Hole Basin Instructions

June 3, 2024
NABIS

B61625 Tap Hole Basin
Instructions

B61625 Tap Hole Basin

Tools

NABIS B61625 Tap Hole Basin

  1. Place the new pedestal for the basin approximately in position. in front of supply and waste pipes.
  2. Lift the new basin into place and gently rest it on top of the pedestal. You will need a helper for this.
  3. Adjust pedestal and basin to ensure that the basin is level and sits comfortably. Use a spirit level.
  4. When happy with the position of the basin. mark through the basin fixing holes. under the basin. with a pencil.
  5. Mark through the fixing holes for the pedestal and draw a pencil guideline around its edge onto the floor.
  6. Drill fixing holes for the basin, as marked. into the wall and push in the appropriate-sized wall plugs. Drill pilot holes for the pedestal. where marked. Here, no plugs are needed as the floor is wooden.
  7. Reposition the pedestal and screw it in place. Use any washers supplied and do not overtighten fixings.
  8. When the pedestal is securely positioned. reposition the basin on the pedestal and fix it in place. Screw through the fixing holes with a screwdriver.
  9. Connect waste pipes to the bottom of the waste system. Do not overtight plastic compression connections. Che that washers are correctly positioned.
  10. Once you have done all your tiling and flooring, you can seal where the basin is in contact with the wall and around the base of the pedestal mounted basins.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals