Topmaq T80501 Torin Hydraulic Heavy Duty Long Frame Service/Floor User Manual

June 3, 2024
TOPMAQ

Topmaq - logo T80501 Torin Hydraulic Heavy Duty
Long Frame Service/Floor
User Manual

T80501 Torin Hydraulic Heavy Duty Long Frame Service/Floor

Topmaq T80501 Torin Hydraulic Heavy Duty Long Frame Service
Floor

Major Data for Reference

Type JM-5003 JM-5005 JM-5010
Capacity (T) 3 Ton 5 Ton 10 Ton
Lifting Height (mm) 480 400 400
Min. Height    (mm) ≦140 ≦160 ≦170
Max. Height   (mm) ≧620 ≧560 ≧570

DRAWING AND PARTS LIST

DRAWING

Topmaq T80501 Torin Hydraulic Heavy Duty Long Frame Service Floor -
fig REPAIRE PARTS LIST OF 3T~10T

Ref. Description on Ref. Description OTT
1 Tray 1 39 Connecting axle 1
2 Bracket 1 40 Pressure to press hand 1
3 Check ring 2 41 Screw 1
4 Bracket axle 1 42 R-Pin 2
5 Check ring 2 43 Pin 1
6 Connecting bar 2 44 Footstep 1
7 Front axle 1 45 Spring 1
8 Washer 4 46 Connecting bar 1
9 Quill roller 47 Pin 1
10 Front wheel 2 48 Screw 1
11 Spring collar 2 49 0-ring 1
12 Spring collar 2 50 Screw 1
13 Rise arm 1 51 Pressure spring 1
14 Oil cup 1 52 Cone valve 1
15 Connector sleeve 1 53 High pressure screw 1
16 Screw 1 54 Metal pad 1
17 Spring 2 55 Ball 09 1
18 Connector axle 1 56 Ball Os 2
19 Wallboard 1 57 Oil seal 1
20 Check ring 1 58 Unloading valve 1
21 Spacer sleeve 2 59 Pin 1
22 0-rIng 1 60 Connecting spring axle 1
23 Piston rod 1 61 Pump cylinder 1
24 Piston top 1 62 Bowl shape-ring I
25 Nylon-bowl-ring 1 63 PTFE ring 1
26 0-ring 1 64 Mandril 1
77 Screw 1 65 Hand wheel 1
28 Rubber pad 1 66 Hand sleeve 2
29 Cove board 1 67 Washer 1
30 Screw 2 68 Screw 1
31 Rise arm axe 1 69 Check ring 2
32 Connecting axle 2 70 Spring 1
33 Bolt M10•25 4 71 Handle 1
34 Caster 2 72 Stop lever 1
35 Washer 016 2 73 Pin 3
36 Lock washer 2 74 Fix shaft I
37 Nut M16 2 75 Mandril 1
38 Check ring 2

SERVICE JACK

Operation Instructions

  1. Elevation:
    (a) Put the rod into the saddle and tighten the seat screw which should be plunged to the location hole in the rod.
    (b) Raise the control rod to the upper function and pull the handle up and down, repeated while the arm starts to rise, the arm tray should be focused to the center of the load before it reaches the required height.
    (c) In case that the tray is too low from the load, please use the foot pedal so as to get to the load fast.

  2. Discharge:
    Turn the handle to the right position in the bow shaped hole and pull the control rod down to the low fulcrum, and turn it around to the notch so as to start the gear to  bleed oil, and the arm will descend.

Caution

  1.  Be sure to follow the processes in the instruction.
  2. No overload or eccentric load.
  3. To be used on the hard flat ground to avoid tipping and trapping.
  4. Don’t adjust relief valve casually.
  5. Only No.10 machine oil is applied the jack. Braking oil is forbid.
  6. Cushion blocks should be used to support load.
  7. All the moving parts should be kept clean and often with fluid oil.Topmaq - logo

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

TOPMAQ User Manuals

Related Manuals