Leonton PG2-1002-SFP-24, PG2-1002-SFP-24-T 10-Port Industrial Gigabit PoE+ Ethernet Switch User Manual
- June 3, 2024
- Leonton
Table of Contents
Leonton PG2-1002-SFP-24, PG2-1002-SFP-24-T 10-Port Industrial Gigabit PoE+
Ethernet Switch User Manual
OVERVIEW
This series is rated IP30 and installation by DIN Rail. Each unit of this industrial PoE+ gigabit unmanaged Ethernet switch series has 8*10/100/1000Tx with IEEE 802.3at compliant ports (30W/port) and 2 dual rate (100/1000) SFP slots, suitable for applications that require high bandwidth and long distance communication.
In order to prevent unregulated voltage, this series provides high EFT and ESD protection. This also allows it to function in harsh environments, as well as support power redundancy with a dual power input design with reverse polarity protection. The built-in relay warning function alerts users about occurring power failures.
With one model having an operating temperature of -10°C ~ 65°C, and another with a wide operating temperature of -40°C ~ 75°C, this series is designed to meet any needs for industrial automation application and harsh environments.
Key Features
Interface & Performance
- Copper port support auto MDI/MDI-X function
- Embedded 810/100/1000Tx (PSE 30W/Port) and 2100/1000 SFP Slots
- Store-and-forward switching architecture
- 8K MAC Address Table
- Supports 9.6Kbytes Jumbo Frame
- 4Mbits memory buffer
Power Input
- Redundant power DC 12-55V with connective 1*6-pin removable terminal block, with SELV output certified by UL61010-2-201
- 1 removable 6-contact terminal block
- Max. current 6A
- Max. PoE output: 60Watts@12VDC, 200Watts@36-55VDC
Certification
- CE/FCC
- UL 61010-1
- UL 61010-2-201
- ISA 12.12.01
Operating Temperature
- Standard operating temperature model: -10°C ~ 65°C
- Extended operating temperature model (-T): -40°C ~ 75°C Case/Installation
- IP30 protection (not certified by UL)
- DIN-Rail and wall mount design
- Installation in a pollution degree 2 industrial environment
Package Contents
- 1 – PG2-1002-SFP-24(-T) – Unit weight: 0.856kg ( 1.89lb), Shipping weight: 1.04kg ( 2.29lb)
- 2 – Wall mounting brackets and screws
- 1 – Quick installation guide
Safety Precaution
Attention
If the DC voltage is supplied by an external circuit, please use a protection
device on the power supply input. Supply by UL Listed industrial use power.
The industrial Ethernet switch’s hardware specs, ports, cabling information,
and wiring installation will be described within this user manual.
Figure 1.1 – Caution Label
Figure 1.2 – Hot Surface Warning Label **
**
HARDWARE DESCRIPTION
Physical Dimensions
Figure 2.1, below, shows the physical dimensions of PG2-1002-SFP-24 series.
Front Panel
The front panel of the PG2-1002-SFP-24 series industrial PoE+ gigabit
Unmanaged Ethernet Switch is shown below in Figure 2.2.
Top View
Figure 2.3, below, shows the top panel of the PG2-1002-SFP-24 series switches
that is equipped with one 6-pin removal terminal block connector for dual DC
power inputs (12-55VDC)
Figure 2.3: Top Panel View
LED Indicators
There are LED light indicators located on the front panel of the industrial switch that display the power status and network status. Each LED indicator has a different color and has its own specific meaning, see below in Table 2.1.
Table 2.1: LED Indicators
LED | Color | Description |
---|---|---|
P1 | Green | On |
Off | Power input 1 is inactive | |
P2 | Green | On |
Off | Power input 2 is inactive | |
Fault | Red | On |
Off | Power input 1 and 2 are both functional | |
SFP Port Link/Act | Green | On |
Flashing | Networking is active | |
Off | Not connected to network | |
Amber | On | Connected to network, 100Mbps |
Flashing | Networking is active | |
Off | Not connected to network | |
LAN Port Link/Act | Green |
| On| Connected to network, 1000Mbps
Flashing| Networking is active
Off| Not connected to network
Green
| On| Connected to network, 10/100Mbps
Flashing| Networking is active
Off| Not connected to network
PoE| Green| On| The port is supplying power to the powered-device
Off| No powered-device attached or power supplying fails
Ethernet Ports
RJ-45 Ports (Auto MDI/MDIX)
The RJ-45 ports are auto-sensing for 10Base-T, 100Base-TX or 1000Base-T
devices connections. Auto MDI/MDIX means that the switch can connect to
another switch or workstation without changing the straight-through or
crossover cabling. See the figures as below for straight-through and crossover
cabling schematics.
10/100BASE-T(X) RJ-45 Pin Assignments (Table 2.2)
Crossover Cable | Straight Through Cable |
---|---|
Pin Number / Signal | Pin Number / Signal |
Signal
1 / RX+| 3 / TX+| 1 / RX+| 1 / TX+
2 / RX-| 6 / TX-| 2 / RX-| 2 / TX-
3 / TX+| 1 / RX+| 3 / TX+| 3 / RX+
6 / TX-| 2 / RX-| 6 / TX-| 6 / RX-
1000BASE-T RJ-45 Pin Assignments (Table 2.3)
Crossover Cable | Straight Through Cable |
---|---|
Pin Number / Signal | Pin Number / Signal |
Signal
1 / TP0+| 3 / TP1+| 1 / TP0+| 1 / TP1+
2 / TP0-| 6 / TP1-| 2 / TP0-| 2 / TP1-
3 / TP1+| 1 / TP0+| 3 / TP1+| 3 / TP0+
4 / TP2+| 7 / TP3+| 4 / TP2+| 4 / TP3+
5 / TP2-| 8 / TP3-| 5 / TP2-| 5 / TP3-
6 / TP1-| 2 / TP0-| 6 / TP1-| 6 / TP0-
7 / TP3+| 4 / TP2+| 7 / TP3+| 7 / TP2+
8 / TP3-| 5 / TP2-| 8 / TP3-| 8 / TP2-
Table 2.3
Note: “+” and “-” signs represent the polarity of the wires that make up each wire pair.
Cabling
Use the four twisted-pair, category 5e, or the above cabling for RJ-45 port connections. The cable between the Switch and the link partner (switch, hub, workstation, etc.) must be less than 100 meters (328 ft.) long.
The small form-factor pluggable (SFP) is a compact optical transceiver used in optical communications for both telecommunication and data communication applications.
Caution: Please employ optional optical transceiver (SFP/Fixed Fiber) that complies with IEC 60825- 1 and classified as Class 1 laser product.
To connect the transceiver and LC cable, please follow below steps:
Step 1. Insert the SFP transceiver module into the SFP slot as shown
below in Figure 2.4. Notice that the triangle mark is at the bottom of the SFP
slot. Figure 2.5 shows SFP transceiver module was inserted.
Step 2. Insert the fiber cable of the LC connector into the transceiver
as shown below in Figure 2.6.
Figure 2.6: LC Connector to the Transceiver
To remove the LC connector from the transceiver, please follow the steps shown
below:
Step 1. Press the upper side of the LC connector from the transceiver and
pull it out to release as shown below in Figure 2.7
Figure 2.7: Remove LC Connector
Step 2. Push down the metal clasp and pull the transceiver out by the plastic
part as shown below in Figure2.8
Figure 2.8: Pull Out from the SFP Module
Wiring the Power Inputs
Caution: Please follow the below steps to insert the power wire.
Step 1. Insert the positive and negative wires into the PWR1 (V1+, V1-)
and PWR2 (V2+, V2-) contacts on the terminal block connector as shown below in
Figure 2.9.
Figure 2.9: Power Terminal Block
Step 2. Tighten the wire-clamp screws to prevent the wires from loosening, as
shown below in Figure 2.10.
Figure 2.10: Power Terminal Block
Caution: Only use copper conductors, 125°C, tighten to 7 in-lbs (0.79 Nm). The wire gauge for the terminal block should range between 18~20 AWG.
Wiring the Fault Alarm Contact
The fault alarm contact is in the middle of the terminal block connector as
the picture shows below in 11. By inserting the wires, it will detect the
fault status including power failure or port link failure (managed industrial
switch only) and form a normally open circuit. An application example for the
fault alarm contact is shown below in Figure 2.11
Figure 2.11: Wiring the Fault Alarm Contact
Caution: The wire gauge for the terminal block should range between 12 ~ 24 AWG. If only using one power source, jumper Pin 1 to Pin 5 and Pin 2 to Pin 6 to eliminate power fault alarm.
Grounding Note
Grounding and wire routing help limit the effects of noise due to electromagnetic interference (EMI). Run the ground connection from the ground screw to the grounding surface prior to connecting devices. The grounding screw symbol is shown blow in Figure 2.12
Figure 2.12: Grounding screw symbol
Caution: Using a shielded cable achieves better electromagnetic compatibility.
MOUNTING INSTALLATION
DIN-Rail Mounting
The DIN-Rail is pre-installed on the industrial Ethernet Switch from the
factory. If the DIN-Rail is not on the industrial Ethernet Switch, please see
Figure 3.1 to learn how to install the DIN-Rail on the Switch.
Figure 3.1: The Rear Side of the Switch and DIN-Rail Bracket
Follow the steps below to learn how to hang the industrial Switch.
Step 1. Use the screws to install the DIN-Rail bracket on the rear side
of the industrial Switch.
Step 2. To remove the DIN-Rail bracket, do the opposite from Step 1.
Step 3. After the DIN-Rail bracket is installed on the rear side of the
Switch, insert the top of the DIN-Rail on to the track as shown below in
Figure 3.2.
Figure 3.2: Insert the Switch on the DIN-Rail
Step 4. Lightly pull down the bracket on to the rail as shown below in Figure
3.3.
Figure 3.3: Stable the Switch on DIN-Rail
Step 5. Check if the bracket is mounted tightly on the rail.
Step 6. To remove the industrial Switch from the rail, do the opposite from
the above steps.
Wall Mounting
Follow the steps below to mount the industrial Switch using the wall mounting
bracket as shown below in Figure 3.4.
Step 1. Remove the DIN-Rail bracket from the industrial Switch by
loosening the screws.
Step 2. Place the wall mounting brackets on the top and bottom of the
industrial Switch.
Step 3. Use the screws to screw the wall mounting bracket on the
industrial Switch.
Step 4. Use the hook holes at the corners of the wall mounting bracket to
hang the industrial Switch on the wall.
Step 5. To remove the wall mount bracket, do the opposite from the steps
above.
Figure 3.4: Remove DIN-Rail Bracket from the Switch and Install the Wall
Mount Bracket
Below, in Figure 3.5 are the dimensions of the wall mounting bracket.
Figure 3.5: Wall Mounting Bracket Dimensions
HARDWARE INSTALLATION
Installation Steps
This section will explain how to install PG2-1002-SFP-24 series.
Installation Steps
Step 1. Unpack the industrial Switch from the original packing box.
Step 2. Check if the DIN-Rail bracket is screwed on the industrial Switch.
- If the DIN-Rail is not screwed on the industrial Switch, please refer to the DIN-Rail Mounting section for DIN-Rail installation.
- If you want to wall mount the industrial Switch, please refer to the Wall Mounting section for wall mounting installation.
Step 3. To hang the industrial Switch on a DIN-Rail or wall, please refer to
the Mounting Installation section.
Step 4. Power on the industrial Switch and then the power LED light will turn
on.
- If you need help on how to wire power, please refer to the Wiring the Power Inputs section.
- Please refer to the LED Indicators section for LED light indication.
Step 5. Prepare the twisted-pair, straight-through category 5 cable for
Ethernet connection.
Step 6. Insert one side of the RJ-45 cable into Switch’s Ethernet port and on
the other side into the networking device’s Ethernet port, e.g. switch PC or
server. The Ethernet port’s (RJ-45) LED on the industrial Switch will turn on
when the cable is connected to the networking device.
- Please refer to the LED Indicators section for LED light indication.
Step 7. Insert one side of the SFP cable into Switch’s SFP port and on the other side into the networking device’s SFP port, e.g. switch or server. The SFP port’s LED on the industrial Switch will turn on when the cable is connected to the networking device.
- Please refer to the LED Indicators section for LED light indication.
Step 8. When all connections are set and the LED lights all show normal, the installation is complete.
Caution: If the equipment is used in a manner not specified by the manufacturer, the protection provided by the equipment may be impaired.
Caution: The installation that the safety to any system incorporating the equipment is the responsibility of the assembler of the system.
Caution: This is an OPEN TYPE module and should be installed in a final safety enclosure characteristic.
**Caution:** This device is intended for use indoor and at altitudes up to 2000 meters.
Caution: Ambient Relative Humidity should be within the range of 5 and 95% (noncondensing).
TROUBLE SHOOTING
- Verify you have the right power cord or adapter. Never use a power supply or adapter with a noncompliant DC output voltage or it will burn the equipment.
- Select the proper UTP or STP cable in order to construct the network. Use an unshielded twisted-pair (UTP) or shield twisted-pair (STP) cable for RJ-45 connections: 100Ω Category 5e for 10M/100/1000Mbps. Also be sure that the length of any twisted-pair connection does not exceed 100 meters (328 feet).
- Diagnosing LED Indicators: To assist in identifying problems, the Switch can be easily monitored with the LED indicators which help to identity if any problems exist.
- Please refer to the LED Indicators section for LED light indication.
- If the power indicator LED does not turn on when the power cord is plugged in, the user may have a problem with the power cord. Check for loose power connections, power losses or surges at the power outlet.
- Please contact Leonton for technical support service, if the problem still cannot be resolved.
- If the industrial Switch LED indicators are normal and the connected cables are correct but the packets still cannot transmit, please check the system’s Ethernet devices’ configuration or status.
© Copyright 2022 Leonton Technologies Co., Ltd. All Rights Reserved
This document contains information, which is protected by copyright.
Reproduction, adaptation or translation without prior permission is
prohibited, except as allowed under the copyright laws
Disclaimer
Leon ton Technologies, Co. Ltd. provides this manual without warranty of any kind, expressed or implied, including but not limited to the implied warranties of merchantability and fitness for a particular purpose. Leon ton Technologies, Co. Ltd. may make improvements and/or changes to the product and/or specifications of the product described in this manual, without prior notice. Leon ton Technologies, C o. Ltd. will not be liable for any technical inaccuracies or typographical errors found in this guide. Changes are periodically made to the information contained herein and will be incorporated into later versions of the manual. The information contained is subject to change without prior notice.
C1D2 Installation and Operating Instructions
These devices are open-type devices that are to be installed in an enclosure
only accessible with the use of a tool, suitable for the environment.
“This equipment is suitable for use in Class I, Division 2, Groups A, B, C,
and D or non-hazardous locations only.”
Caution: EXPLOSION HAZARD – Do not disconnect equipment unless power has
been removed or the area is known to be non-hazardous.
Caution: EXPLOSION HAZARD – Substitution of any components may impair
suitability for Class I, Division 2.
FCC Notice
This equipment has been tested and found to comply with the limits for a Class-A digital device, pursuant to Part 15 of the FCC rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses, and can radiate radio frequency energy. It may cause harmful interference to radio communications if the equipment is not installed and used in accordance with the instructions. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures:
- Reorient or relocate the receiving antenna.
- Increase the separation between the equipment and receiver.
- Connect the equipment into an outlet on a circuit different from that to which the receiver is connected.
- Consult the dealer or an experienced radio/TV technician for help.
Caution: Any changes or modifications not expressly approved by the grantee of this device could void the user’s authority to operate the equipment.
CE Mark Warning
This is a Class-A product. In a domestic environment this product may cause
radio interference in which case the user may be required to take adequate
measures.
This document is the current official release manual. Please check our website
(www.leonton.com) for any updated manual or contact
us by e-mail (sales@leonton.com).
Support
For any repair or maintenance needs, please contact us.
LEONTON TECHNOLOGIES, CO., LTD
9F-1, No.43, Fuxing Rd., Xindian Dist.,
New Taipei City, 231,
Taiwan
TEL: +886 2 22183113
FAX: +886 2 22187391
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>