GE Appliances GTX33EASKWW 6.2 cu. ft. Electric Dryer Instruction Manual

September 3, 2022
GE Appliances

GTX33EASKWW 6.2 cu. ft. Electric Dryer

Installation Instructions

Dryers 05

Questions? Call GE Appliances at 800.GE.CARES (800.432.2737) or visit our Web site at: GEAppliances.com

BEFORE YOU BEGIN
Read these instructions completely and carefully.
IMPORTANT ­ Save these instructions for local electrical
inspector’s use.
IMPORTANT ­ Observe all governing codes and
ordinances.
· Install the clothes dryer according to the manufacturer’s instructions and local codes.
· Note to Installer ­ Be sure to leave these instructions with the Consumer.
· Note to Consumer ­ Keep these instructions for future reference.
· Clothes dryer installation must be performed by a qualified installer.
· This dryer must be exhausted to the outdoors.
· Before the old dryer is removed from service or discarded, remove the dryer door.
· Do not allow children on or in the appliance. Close supervision of children is necessary when the appliance is used near children.
· Proper installation is the responsibility of the installer.
· Product failure due to improper installation is not covered under the Warranty.
· Install the dryer where the temperature is above 50°F for satisfactory operation of the dryer control system.
· Remove and discard existing plastic or metal foil duct and replace with UL- listed duct.
· Service information and the wiring diagram are located in the control console.

WARNING
– Risk of Fire · Clothes dryer installation must be performed by a qualified installer. · Install the clothes dryer according to these instructions and local codes. · DO NOT install a clothes dryer with flexible plastic venting materials. If flexible metal (semi-rigid or foil-type) duct is installed, it must be UL-listed and installed in accordance with the instructions found in “Connecting the Dryer to House Vent” later in this manual. Flexible venting materials are known to collapse, be easily crushed and trap lint. These conditions will obstruct dryer airflow and increase the risk of fire. · DO NOT install or store this appliance in any location where it could be exposed to water or weather. · To reduce the risk of severe injury or death, follow all installation instructions. · Save these instructions. (Installers: Be sure to leave
these instructions with the customer.)
FOR GAS DRYERS ONLY
In the Commonwealth of Massachusetts, the following installation instructions apply: · Installation must be performed by a qualified or licensed contractor, plumber, or gasfitter qualified or licensed by the State. · If using a ball valve, it shall be a T-handle type. · A flexible gas connector, when used, must not exceed 4 feet.

234D2318P005 31-16775-4 02-20 GEA

Installation Instructions
UNPACKING YOUR DRYER
Tilt the dryer sideways and remove the foam shipping pads by pulling at the sides and breaking them away from the dryer legs. Be sure to remove all of the foam pieces around the legs. Remove the bag containing the literature.

ROUGH-IN DIMENSIONS

27″ (68.8 cm)

Y

Cubic Foot

X

Y

6.2

43 3/8″ 26 3/4″ (110 cm) (68 cm)

X

7.2

43 3/8″ 29 1/2″ (110 cm) (75 cm)

7.4

43 3/4″ 30 1/2″ (111 cm) (78 cm)

7.4 (with Riser)

45 1/2″ 30 1/2″ (116 cm) (78 cm)

Front View

X

Side View 4 1/4″
(10.8 cm)

4 5/8″ (11.7 cm)
or 6 1/2″ (16.5 cm) with Riser

STEAM WATER HOSES (for steam dryer models only):

GE Appliances strongly recommends the use of factory specified parts. These hoses are manufactured and tested to meet GE Appliances specifications.
GE Appliances strongly recommends the use of new water supply hoses. Hoses degrade over time and need to be replaced every 5 years to reduce the risk of hose failures and water damage.
Parts and Accessories Order on-line at GEApplianceparts.com, 24 hours a day or by phone at 877.959.8688 during normal business hours.

Part Number

Accessory

WE25X20060 Complete Kit (hoses, Y-adapter, washers) or

WE49X25794 Kit (Short hose, Y-adapter, washers) and

WE1M847 Long Hose

OR SEPARATELY

WE1M847 Long Hose and

WE1M848 Short Hose

ACCESSORIES:
Order on-line at GEApplianceparts.com, 24 hours a day or by phone at 877.959.8688 during normal business hours.

Part Number PM14X10056 WX14X10007 PM08X10085

Accessory Dryer door opening vent brush LintEaterTM Dryer rotary tube brush Flexible Metal Dryer Transition Duct

2

Installation Instructions

REQUIREMENTS FOR ALCOVE OR CLOSET INSTALLATION
WARNING – Explosion Hazard
Keep flammable materials and vapors, such as gasoline, away from dryer.
Place dryer at least 18″ (46 cm) above the floor for a garage installation.
Failure to do so can result in death, explosion, or fire.
· The dryer MUST be vented to the outdoors. · Minimum clearance between dryer cabinet and
adjacent walls or other surfaces is: 0″ either side 0″ rear 0″ front 1″ top · Consideration must be given to provide adequate clearance for installation and service. · Closet doors must be louvered or otherwise ventilated and have at least 60 square inches of open area. If the closet contains both a washer and a dryer, doors must contain a minimum of 120 square inches of open area.
NOTE: WHEN THE EXHAUST DUCT IS LOCATED AT THE REAR OF THE DRYER, THE CONFIGURATION OF THE DUCTING MAY REQUIRE GREATER THAN 1″ OF REAR CLEARANCE.
Gas Dryers Only: · No other fuel burning appliance shall be installed in
the same closet as a gas dryer. · The dryer must be disconnected from the gas
supply piping during pressure testing at pressures greater than ½ psi (3.5 kPa).
· A 1/8 inch NPT minimum plugged tapping, accessible for test gauge connection, must be installed immediately upstream of the gas supply connection to the dryer.

MINIMUM CLEARANCE OTHER THAN ALCOVE OR CLOSET INSTALLATION
Minimum clearance to combustible surfaces and for air opening are: 0″ both sides, 0″ rear and 1″ top. Consideration must be given to provide adequate clearance for installation and service.
MOBILE OR MANUFACTURED HOME INSTALLATION
· Installation MUST conform to the MANUFACTURED HOME CONSTRUCTION AND SAFETY STANDARD, TITLE 24, PART 3280 or STANDARD FOR MOBILE HOMES CAN/CSA-Z240 MH, or, when such standards are not applicable, with AMERICAN NATIONAL STANDARD FOR MOBILE HOME, ANSI/NFPA NO. 501B.
· The dryer MUST be vented to the outdoors. · The exhaust vent MUST be securely fastened to a
non-combustible portion of the mobile home. · The vent MUST NOT be terminated beneath a
mobile or manufactured home. · The vent duct material MUST BE METAL. · KIT 14-D346-33 MUST be used to attach the dryer
securely to the structure. · The vent MUST NOT be connected to any other
duct, vent or chimney. · DO NOT use sheet metal screws or other
fastening devices which extend into the interior of the exhaust vent. · Provide an opening with a free area of at least 25 square inches for introduction of outside air into the dryer room. · See the sections for electrical connection information.

3

Installation Instructions

CONNECTING INLET HOSES (for steam dryer models only)

CONNECTING INLET HOSES
To produce steam, the dryer must connect to the cold water supply. Since the washer must also connect to the cold water, a “Y” connector is inserted to allow both inlet hoses to make that connection at the same time.
NOTE: Use new inlet hoses; never use old hoses.
1. Turn the cold water faucet off. Remove the washer inlet hose from the washer fill valve connector (cold).
2. Ensure the rubber flat washer is in place and attach one female coupling of the short hose provided onto the washer fill valve connector. Tighten by hand until firmly seated.
3. Attach one male end of the “Y” connector to the other female coupling of the short hose. Ensure the rubber flat washer is in place. Tighten by hand until firmly seated.

CONNECTING INLET HOSES (cont.)
7. Using pliers, tighten all the couplings with an additional two­thirds turn.
NOTE: Do not overtighten. Damage to the couplings may result.

4. Insert the filter screen in the coupling of the washer’s inlet hose. If a rubber flat washer is already in place remove it before installing the filter screen. Attach this coupling to one male end of the ’Y” connector. Tighten by hand until firmly seated. 5\. Ensure the rubber flat washer is in place and attach a 4 ft. to 6 ft. long water inlet hose (may need to be purchased separately) to one male end of the ’Y” connector. Tighten by hand until firmly seated.
6. Ensure the rubber flat washer is in place and attach the other end of the dryer’s long inlet hose to the fill valve connector at the bottom of the dryer back panel. Tighten by hand until firmly seated.

8. Turn the water faucet on.
9. Check for leaks around the `’Y” connector, faucet and hose couplings.
WATER SUPPLY REQUIREMENTS
Hot and cold water faucets MUST be installed within 42 in. (107 cm) of your washer’s water inlet. The faucets MUST be 3/4 in. (1.9 cm) garden hose-type so inlet hoses can be connected. Water pressure MUST be between 10 and 120 pounds per square inch. Your water department can advise you of your water pressure.
NOTE: A water softener is recommended to reduce buildup of scale inside the steam generator if the home water supply is very hard.

4

Installation Instructions

CONNECTING A GAS DRYER (skip for electric dryers)

TOOLS YOU WILL NEED

10″ Adjustable wrenches (2)

Flat-blade screwdriver

· Before beginning the installation, turn off the circuit breaker(s) or remove the dryer’s circuit fuse(s) at the electrical box. Be sure the dryer cord is unplugged from the wall.

8″ Pipe wrench

Slip-joint pliers

Level

MATERIALS YOU WILL NEED

4″ dia. metal elbow

Gloves

Pipe compound or PTFE tape
Flexible gas line connector

Soap solution for leak detection
Exhaust hood

Duct clamps (2) or Spring clamps (2)

Duct tape

· Turn the dryer’s gas shut-off valve in the supply line to the OFF position.
Shut-off Valve
· Disconnect and discard old flexible gas connector and ducting material.

Safety glasses
4″ dia. metal duct (recommended)
4″ dia., UL-listed flexible metal duct (if needed)

Gas pipe adapters (2), elbow and pipe plug
4″ Cover Plate (Kit WE49X22606) (if needed)

5

Installation Instructions CONNECTING A GAS DRYER (cont.)

GAS REQUIREMENTS
WARNING – Explosion Hazard
· Use a new CSA International approved flexible gas supply line. Never reuse old flexible connectors.
· Install an individual manual shut-off valve within 6ft. of the dryer in accordance with the National Fuel Gas Code, ANSI Z223.1/NFPA 54.
· Securely tighten all gas connections. · If connected to LP gas, have a qualified
person make sure gas pressure DOES NOT exceed 13″ water column. · Examples of a qualified person include: licensed heating personnel, authorized gas company personnel, and authorized service personnel. · Failure to do so can result in death, explosion, or fire.
· The installation must conform with local codes, or in the absence of local codes, with the National Fuel Gas Code, ANSI Z223.1/NFPA 54, or the Natural Gas and Propane Installation Code, CSA B149.1.
DRYER GAS SUPPLY CONNECTION
1-7/8″
3-1/8″
3/8″ NPT MALE THREAD GAS SUPPLY NOTE: Add to vertical dimension the distance between cabinet bottom to floor.
You must use with this dryer a flexible metal connector (listed connector ANSI Z21.24 / CSA 6.10). The length of the connect shall not exceed 4 feet.

GAS SUPPLY
· A 1/8″ National Pipe Taper thread plugged tapping, accessible for test gauge connection, must be installed immediately upstream of the gas supply connection to the dryer. Contact your local gas utility should you have questions on the installation of the plugged tapping.
· Supply line is to be 1/2″ rigid pipe and equipped with an accessible shutoff within 6 feet of, and in the same room with, the dryer.
· Use pipe thread compound appropriate for natural or LP gas or use PTFE tape.
· Connect flexible metal connector to dryer and gas supply.

WARNING

– Fire Hazard

FOR USE WITH NATURAL GAS ONLY
Dryer as produced by manufacturer is to be used only with a natural gas supply. A manufacturersupplied conversion kit is required to convert this dryer for propane gas supply. Use propane gas conversion kit WE25X217. Conversion must be made by properly trained and qualified personnel in accordance with local codes and ordinances.

ADJUSTING FOR ELEVATION
· Gas clothes dryers input ratings are based on sea level operation and need not be adjusted for operation at or below 2000 ft. elevation. For operation at elevations above 2000 ft., input ratings should be reduced at a rate of 4 percent for each 1000 ft. above sea level.
· Installation must conform to local codes and ordinances or, in their absence, the NATIONAL FUEL GAS CODE, ANSI Z223.

6

Installation Instructions CONNECTING A GAS DRYER (cont.)

CONNECTING THE DRYER TO THE GAS SUPPLY
A Install a female 3/8″ NPT elbow at the end of the dryer gas inlet.
Install a 3/8″ flare union adapter to the female elbow.
IMPORTANT: Use a pipe wrench to securely hold on to the end of the dryer gas inlet to prevent twisting the inlet.
NOTE: Apply pipe compound or PTFE tape to the threads of the adapter and dryer gas inlet.

CONNECTING THE DRYER TO THE GAS SUPPLY (cont.)
D Install a 1/8″ NPT plugged tapping to the dryer gas line shut-off valve for checking gas inlet pressure.
Install a flare union adapter to the plugged tapping.
NOTE: Apply pipe compound or PTFE tape to the threads of the adapter and plugged tapping.

New Metal Flexible Gas Line Connector
Adapter Elbow

Adapter
1/8″ NPT Pipe Plug for Checking Gas Inlet Pressure

Items not supplied

3/8″ NPT

Shut-Off Valve
Pipe size at least 1/2″

B Attach the flexible metal gas line connector to the adapter.

Apply pipe compound or PTFE tape to all male threads.

Plugged Tapping

Shut-Off Valve
E Tighten all connections, using two adjustable wrenches. Do not overtighten.

Apply pipe compound to the adapter and dryer gas inlet
C Tighten the flexible gas line connection, using two adjustable wrenches.

F Open the gas shut-off valve.

7

Installation Instructions CONNECTING A GAS DRYER (cont.)

TEST FOR LEAKS
Never use an open flame to test for gas leaks.
Check all connections for leaks with soapy solution or equivalent.
Apply a soap solution. The leak test solution must not contain ammonia, which could cause damage to the brass fittings.
If leaks are found, close the valve, retighten the joint and repeat the soap test.

Open Gas Valve

ELECTRICAL CONNECTION INFORMATION FOR GAS DRYERS

WARNING – Electrical Shock Hazard
Plug into a grounded 3 prong outlet. DO NOT remove ground prong. DO NOT use an adapter. DO NOT use an extension cord. Failure to do so can result in death, fire or electrical shock.

· Circuit ­ Individual properly polarized and grounded 15 or 20 amp circuit breaker or time-delay fuse.

· Power Supply ­ 2-wire plus ground, 120 Volt, single phase, 60 Hz, alternating current.

· Outlet Receptacle ­ Properly grounded 3-prong

receptacle to be located

so the power cord is

accessible when the dryer

is in an installed position.

If a 2-prong receptacle is Ensure proper

present, it is the owner’s ground exists

responsibility to have a

before use.

licensed electrician replace

it with a properly grounded 3-prong grounding type

receptacle.

8

ELECTRICAL CONNECTION INFORMATION FOR GAS DRYERS (cont.)
· Dryer must be electrically grounded in accordance with local codes and ordinances, or in the absence of local codes, with the latest edition of the NATIONAL ELECTRICAL CODE, ANSI/NFPA NO. 70 or CANADIAN ELECTRICAL CODE, CSA C22.1. Check with a licensed electrician if you are not sure that the dryer is properly grounded.

GROUNDING INSTRUCTIONS

This dryer must be grounded. In the event of a malfunction or breakdown, grounding will reduce the risk of electric shock by providing a path of least resistance for electric current. This dryer uses a cord having an equipment- grounding conductor and a grounding plug. The plug must be plugged into an appropriate outlet that is properly installed and grounded in accordance with all local codes and ordinances.

WARNING

Improper connection of the equipment-grounding conductor

can result in a risk of electric shock. Check with a

qualified electrician, or service representative or

personnel, if you are in doubt as to whether the

appliance is properly grounded. DO NOT modify

the plug on the power supply cord. If it will not

fit the outlet, have a proper outlet installed by a

qualified electrician.

SAVE THESE INSTRUCTIONS

· If required by local codes, an external 18 gauge or larger copper ground wire (not provided) may be added. Attach to dryer cabinet with a #8-18 x 1/2″ sheet metal screw (available at any hardware store) to rear of dryer as illustrated.

Ground Screw

Installation Instructions

CONNECTING AN ELECTRIC DRYER
(Skip for gas dryers and if your dryer already has a power cord attached)

TOOLS YOU WILL NEED

Flat-blade screwdriver

Slip-joint pliers

Phillips screwdriver

Level

Before making the electrical connection, turn off the circuit breaker(s) or remove the dryer’s circuit fuse(s) at the electrical box. Be sure the dryer
cord is unplugged from the wall. NEVER LEAVE THE ACCESS COVER OFF THE TERMINAL BLOCK.

MATERIALS YOU WILL NEED

4″ dia. metal elbow

Gloves

3/4″ Strain relief (UL recognized)

Exhaust hood

4″ Duct clamps (2) or 4″ spring clamps (2)

Duct tape

Safety glasses
4″ dia. metal duct (recommended)
4″ dia., UL-listed flexible metal duct (if needed)

Dryer power cord kit (not provided with dryer) UL rated 120/240V, 30A with 3 or 4 prongs. Identify the plug type as per the house receptacle before purchasing line cord.
4″ Cover Plate (Kit WE49X22606) (if needed)

POWER CORDS
GE Appliances strongly recommends the use of factory specified parts. Select the power cord to fit your installation requirements.
NOTE: If your dryer circuit is on a circuit protected by a GFCI breaker, then 3-wire installation is not permitted. House wiring and dryer must be configured for 4-wire.

Part Number WX9X2 WX9X3 WX9X4 WX9X18 WX9X19 WX9X20

Type 3-Prong 3-Prong 3-Prong 4-Prong 4-Prong 4-Prong

Length 4 Feet 5 Feet 6 Feet 4 Feet 5 Feet 6 Feet

Amperage 30 30 30 30 30 30

Order on-line at GEApplianceparts.com, 24 hours a day or by phone at 877.959.8688 during normal business hours.

9

Installation Instructions CONNECTING AN ELECTRIC DRYER

ELECTRICAL CONNECTION INFORMATION FOR ELECTRIC DRYERS
For electrical connections using a power cord:
NOTE: If your dryer circuit is on a circuit protected by a GFCI breaker, then 3-wire installation is not permitted. House wiring and dryer must be configured for 4-wire.

WARNING

– Fire Hazard

Use a new UL-listed 240V 30 amp dryer power supply cord with closed ring terminals or spade terminals with upturned ends.
Use a UL-listed strain relief.
Disconnect power before making electrical connections.
Connect neutral wire (white or center wire) to center terminal.
Ground wire (green or bare wire) must be connected to green ground connector.
Connect remaining two supply wires to remaining two terminals.
Securely tighten all electrical connections.
Replace the terminal block cover.
Failure to do so can result in death, fire or electrical shock.

GROUNDING INSTRUCTIONS

For a grounded, cord-connected dryer: This dryer must be grounded. In the event of a malfunction or breakdown, grounding will reduce the risk of electric shock by providing a path of least resistance for electric current. This dryer uses a cord having an equipmentgrounding conductor and a grounding plug. The plug must be plugged into an appropriate outlet that is properly installed and grounded in accordance with all local codes and ordinances.

WARNING

Improper connection of the equipment-grounding conductor

can result in a risk of electric shock. Check with a

qualified electrician, or service representative or

personnel, if you are in doubt as to whether the

appliance is properly grounded. DO NOT modify

the plug on the power supply cord. If it will not

fit the outlet, have a proper outlet installed by a

qualified electrician.

SAVE THESE INSTRUCTIONS

ELECTRICAL CONNECTION INFORMATION FOR ELECTRIC DRYERS
For direct wire connections:

WARNING

– Fire Hazard

Use 10 gauge solid copper wire.
Use a UL-listed strain relief.
Disconnect power before making electrical connections.
Connect neutral wire (white or center wire) to center terminal.
Ground wire (green or bare wire) must be connected to green ground connector.
Connect remaining two supply wires to remaining two terminals.
Securely tighten all electrical connections.
Replace the terminal block cover.
Failure to do so can result in death, fire or electrical shock.

GROUNDING INSTRUCTIONS

For a permanently connected dryer: This dryer must be connected to a grounded metal, permanent wiring system, or an equipmentgrounding conductor must be run with the circuit conductors and connected to the equipmentgrounding terminal on the appliance.

WARNING

Improper connection of the equipment-grounding conductor

can result in a risk of electric shock. Check with a

qualified electrician, or service representative or

personnel, if you are in doubt as to whether the

appliance is properly grounded.

SAVE THESE INSTRUCTIONS

10

Installation Instructions

CONNECTING AN ELECTRIC DRYER

CONNECTING DRYER USING 4-WIRE CONNECTION (MUST BE USED FOR MOBILE HOME INSTALLATION)
NOTE: Since January 1, 1996, the National Electrical Code requires that new constructions use a 4-wire connection to an electric dryer. A 4-wire cord must also be used where local codes do not permit grounding through the neutral.
3-wire connection is NOT for use on new construction.

Remove ground strap and discard. Keep green ground screw
Screws (2)
Neutral (white)

Hot Wire

Relocate green ground screw here
Green Wire

Screw

Hot Wire

Cover

Strain 3/4″ UL Relief Recognized Bracket Strain Relief

4 #10 AWG minimum copper conductors or 120/240V 30A power supply cord kit marked for use with dryers and provided with closed loop or spade terminals with upturned ends (not supplied).
1. Turn off the circuit breaker(s) (30 amp) or remove the dryer’s circuit fuse at the electrical box.
2. Be sure the dryer cord is unplugged from the wall receptacle.
3. Remove the power cord cover located at the lower back.
4. Remove and discard ground strap. Keep the green ground screw for Step 7.
5. Install 3/4 in. UL-recognized strain relief to power cord entry hole. Bring power cord through strain relief.
6. Connect power cord as follows: A. Connect the 2 hot lines to the outer screws of the terminal block (marked L1 and L2). B. Connect the neutral (white) line to the center of the terminal block (marked N).
7. Attach ground wire of power cord with the green ground screw (hole above strain relief bracket). Tighten all terminal block screws (3) securely.
8. Properly secure power cord to strain relief. 9. Reinstall the cover.
NEVER LEAVE THE COVER OFF OF THE TERMINAL BLOCK.

CONNECTING DRYER USING 3-WIRE CONNECTION
NOTE: If your dryer circuit is on a circuit protected by a GFCI breaker, then 3-wire installation is not permitted. House wiring and dryer must be configured for 4-wire.
If required, by local code, install external ground (not provided) to grounded metal, cold water pipe, or other established ground determined by a qualified electrician.
Hot Wire
Green Ground Screw & Ground Strap

Screws (2)
Neutral (white)
Screw

Hot Wire

Cover

Strain 3/4″ UL Relief Recognized Bracket Strain Relief

3 #10 AWG minimum copper conductors or 120/240V 30A power supply cord kit marked for use with dryers and provided with closed loop or spade terminals with upturned ends (not supplied).

3-wire Connection

NOT for use in Canada.

DO NOT use for Mobile Home Installations.

NOT for use on new construction.

NOT for use on recreational vehicles.

NOT for use in areas where local codes prohibit

grounding through the neutral conduction.

1. Turn off the circuit breaker(s) (30 amp) or remove the dryer’s circuit fuse at the electrical box.
2. Be sure dryer cord is unplugged from wall receptacle. 3. Remove power cord cover located at the lower back. 4. Install 3/4-in. UL-recognized strain relief to power cord
entry hole. Bring power cord through strain relief. 5. Connect power cord as follows:
A. Connect the 2 hot lines to the outer screws of the terminal block (marked L1 and L2).
B. Connect the neutral (white) line to the center of the terminal block (marked N).
6. Be sure ground strap is connected to neutral (center) terminal of block and to green ground screw on cabinet rear. Tighten all terminal block screws (3) securely.
7. Properly secure power cord to strain relief. 8. Reinstall the cover.

NEVER LEAVE THE COVER OFF OF THE TERMINAL BLOCK.

11

Installation Instructions

EXHAUSTING THE DRYER

WARNING

– Fire Hazard

This dryer MUST be vented to the outdoors.
Use only 4″ rigid metal ducting for the home exhaust duct.
Use only 4″ rigid metal or UL-listed dryer transition duct to connect the dryer to the home exhaust.
DO NOT use a plastic vent.
DO NOT exhaust into a chimney, kitchen exhaust, gas vent, wall, ceiling, attic, crawl space, or concealed space of a building.
DO NOT install a screen in or over the exhaust duct. DO NOT install a booster fan in the exhaust duct. DO NOT use duct longer than specified in the exhaust length table.
Failure to follow these instructions can result in death or fire.

TOOLS AND MATERIALS YOU WILL NEED TO INSTALL EXHAUST DUCT

Phillips-head screwdriver

Drill with 1/8″ drill bit (for bottom venting)

Duct tape or duct clamp

Hacksaw

Rigid or UL-listed flexible Vent hood metal 4″ (10.2 cm) duct

PARTS AVAILABLE FROM GEAPPLIANCEPARTS.COM OR LOCAL SERVICE ORGANIZATIONS

PM8X85

Outdoor exhaust hood

PM08X10085 8′ Flexible metal clothes dryer transition duct with 2 clamps

WX08X10130 4″ Dryer exhaust clamp

WE49X22606 Rear exhaust opening cover, for side or bottom vented dryers

CONNECTING THE DRYER TO HOUSE VENT
RIGID METAL TRANSITION DUCT
· For best drying performance, a rigid metal transition duct is recommended.
· Rigid metal transition ducts reduce the risk of crushing and kinking.
UL-LISTED FLEXIBLE METAL CLOTHES DRYER TRANSITION DUCT
· If rigid metal cannot be used, then UL-listed flexible metal clothes dryer transition duct (GE Appliances part ­ PM08X10085) can be used.
· Never install transition duct in walls, ceilings, floors or other enclosed spaces.
· Total length of transition duct should not exceed 8′ (2.4 m).
· For many applications, installing elbows at both the dryer and the wall is highly recommended (see illustrations in next section). Elbows allow the dryer to sit close to the wall without kinking and/or crushing the transition duct, maximizing drying performance.
· Avoid resting the duct on sharp objects.
UL-LISTED FLEXIBLE METAL (FOIL-TYPE) TRANSITION DUCT
· In special installations, it may be necessary to connect the dryer to the home exhaust vent using flexible metal (foil-type) transition duct. UL­ LISTED universal flexible dryer transition duct (GE Appliances parts ­ PM8X73 or WX8X73) may be used ONLY in installations where rigid metal or flexible metal transition ducting cannot be used AND where a 4″ diameter can be maintained throughout the entire length of the transition duct.
· In Canada and the United States, only transition ducts that comply with “UL 2158A STANDARD FOR CLOTHES DRYER TRANSITION DUCT” shall be used.
· Avoid resting the duct on sharp objects.
· For best drying performance:
1. Slide one end of the duct over the clothes dryer outlet pipe.
2. Secure the duct with a clamp.
3. With the dryer in its permanent position, extend the duct to its full length. Allow 2″ of duct to overlap the exhaust pipe. Cut off and remove excess duct. Keep the duct as straight as possible for maximum airflow.
4. Secure the duct to the exhaust pipe with the other clamp.

12

Installation Instructions
EXHAUSTING THE DRYER (cont.)
· DO cut duct as short as possible and install straight into wall.

· DO use elbows when turns are necessary.

Elbows

· DO NOT bend or collapse ducting. Use elbows if turns are necessary.

· DO NOT use excessive exhaust length. Cut duct as short as possible.

· DO NOT crush duct against the wall.

· DO NOT set dryer on duct.

EXHAUST LENGTH
Using exhaust longer than specified length will: · Increase the drying times and the energy cost. · Reduce the dryer life. · Accumulate lint, creating a potential fire hazard.
The correct exhaust installation is YOUR RESPONSIBILITY. Problems due to incorrect installation are not covered by the warranty.
The MAXIMUM ALLOWABLE length of the exhaust system depends upon the type of duct, number of turns, the type of exhaust hood (wall cap) and all conditions noted on the chart.
· Internal elbows added for side or bottom vent conversions must be included in the total elbow count.
· Any elbow greater than 45° should be treated as a 90° elbow; one elbow of 45° or less may be ignored.
· Two 45° elbows will be treated like one 90° elbow.
· For the side exhaust installations, add one 90° elbow to the chart.
· For every additional 90° elbow, reduce the allowable vent system length by 10 feet.
· When calculating the total vent system length, you must add all the straight portions and elbows of the system (including the transition duct).

RECOMMENDED MAXIMUM LENGTH

Exhaust Hood Types

Recommended

Use only for short run installations

4″ DIA.

4″ DIA.

4″ DIA.

No. of 90° Elbows 0 1 2 3 4 5

4″
Rigid Metal 120 Feet 100 Feet 85 Feet 70 Feet 60 Feet 55 Feet

2-1/2″
Rigid Metal 90 Feet 75 Feet 65 Feet 55 Feet 45 Feet 35 Feet

13

Installation Instructions

EXHAUSTING THE DRYER (cont.)

EXHAUST SYSTEM CHECKLIST
HOOD OR WALL CAP
· Terminate in a manner to prevent back drafts or entry of birds or other wildlife.
· Termination should present minimal resistance to the exhaust airflow and should require little or no maintenance to prevent clogging.
· Wall caps must be installed at least 12″ above ground level or any other obstruction with the opening pointed down.
SEPARATION OF TURNS
· For best performance, separate all turns by at least 4 ft. of straight duct, including distance between last turn and dampened exhaust hood (wall cap).
SEALING OF JOINTS
· All joints should be tight to avoid leaks. The male end of each section of duct must point away from the dryer.
· Duct joints should be made air- and moisture-tight by wrapping the overlapped joints with duct tape or aluminum tape.
· Do not assemble ductwork with any fasteners that extend into the duct. These fasteners can accumulate lint, creating a potential fire hazard.
· Horizontal runs should slope down towards the outdoors 1/4″ per foot.
· Provide an access for inspection and cleaning of the exhaust system, especially at turns and joints. Exhaust system shall be inspected and cleaned at least once a year.
INSULATION
· Ductwork that runs through an unheated area or is near air conditioning should be insulated to reduce condensation and lint build-up.

STANDARD REAR EXHAUST
We recommend that you install your dryer before installing your washer. This will permit direct access for easier exhaust connection. Slide the end of the exhaust duct on the back of the dryer and secure with duct tape or a hose clamp.
EXTERNAL DUCT OPENING
DUCT TAPE OR DUCT CLAMP 4″ METAL DUCT CUT TO PROPER LENGTH
DUCT TAPE OR DUCT CLAMP
NOTE: We strongly recommend using rigid metal exhaust duct. However, if flexible ducting is used it must be UL-Listed metal, not plastic. · For straight line installation, connect the dryer
exhaust to the external exhaust hood using duct tape or clamp.
RECOMMENDED CONFIGURATION TO MINIMIZE EXHAUST BLOCKAGE
Using duct elbows will prevent duct kinking and collapsing.

BEFORE YOU BEGIN
· Remove and discard existing plastic or metal foil duct and replace with UL- listed duct.
· Remove any lint from the wall exhaust opening.

Internal Duct Opening

Wall
Check that exhaust hood damper opens and closes freely.

Transition Ducting

14

Installation Instructions

EXHAUSTING THE DRYER (cont.)

SIDE OR BOTTOM VENTING

WARNING

– Fire Hazard

SIDE OR BOTTOM VENTING (cont.)
TAB LOCATION Not for gas models

Disconnect dryer from electrical supply.
Wear gloves and arm guards.
Close the back opening with cover plate (Kit WE49X22606).
Failure to do so may result in fire, electrical shock or lacerations.

Dryer Exhaust to right of the cabinet for Electric models only.
Dryer Exhaust to left of the cabinet for Gas and Electric models.
Dryer Exhaust to the bottom of cabinet for Gas and Electric models.

Remove screw and save

Right (electric models only)

Left Bottom
Remove desired knockout (one only)
Detach and remove the right (electric models only), left or bottom knockout as desired. Remove the screw inside the dryer exhaust duct and save. Pull the duct out of the dryer.
Cut the duct as shown and keep portion A.
Fixing hole

Bend tab up 45°

Left
Through the rear opening, locate the tab in the middle of the appliance base. Lift the tab to about 45°, using a flat-blade screwdriver.
ADDING A NEW DUCT
Portion “A” Fixing hole

Right

Right (electric

models only)

or left side

exhaust

Left

Reconnect the cut portion (A) of the duct to the blower housing. Make sure that the shortened duct is aligned with the tab in the base. Use the screw saved previously to secure the duct in place through the tab on the appliance base.

ADDING ELBOW AND DUCT FOR EXHAUST TO RIGHT (ELECTRIC MODELS ONLY) OR LEFT SIDE OF CABINET

Right

A

9 1»2″ (24.13cm)

For models GTD60, GTD65 and GTD68 only, use

the dimension below:

Fixing hole

A 10 1»2″ (26.67cm)

Exhaust can be

added to right

(electric models only) or left side

Right

Left Duct tape

Left
· Preassemble 4″ elbow with 4″ duct. Wrap duct tape around joint.
· Insert duct assembly, elbow first, through the side opening and connect the elbow to the dryer internal duct.
Be sure not to pull or damage the electrical wires inside the dryer when inserting the duct. 15

Installation Instructions

EXHAUSTING DRYER (cont.) FINAL SETUP

SIDE OR BOTTOM VENTING (cont.)

ADDING ELBOW AND DUCT FOR EXHAUST TO LEFT OR RIGHT SIDE OF CABINET (cont.)

· Apply duct tape as shown

DUCT

on the joint between the

TAPE

dryer internal duct and

the elbow, and also the

joint between the elbow

and the side duct.

Use 4″ rigid metal ducting only inside the dryer. Internal duct joints must be secured with tape, otherwise they may separate and cause a safety hazard.

ADDING ELBOW FOR EXHAUST THROUGH BOTTOM OF CABINET

· Insert the elbow through the rear opening and connect it to the dryer internal duct.

· Apply duct tape as shown on the joint between the dryer internal duct and the elbow, and also the joint between the elbow and the bottom duct.

Duct tape

Internal duct joints must be secured with tape; otherwise, they may separate and cause a safety hazard.

ADDING COVER PLATE TO REAR OF CABINET

1 LEVEL THE DRYER

Stand the

dryer upright

near the

final location

and adjust

the leveling

legs at the

corners to Raise Lower ensure the

dryer is level

side-to-side

Anti-Tip Legs

and front-to-back. Then, adjust the two anti-tip

legs at the front inner corners, taking care that

they are touching the floor to avoid unit tip over.

The installation is not complete until this process

is finished.

2 PLUG DRYER IN

Ensure proper ground exists before use.

3 DRYER START-UP

Press the Start button.

NOTE: If the dryer has been exposed to temperatures

(appearance will vary)

below freezing for an extended period of time, allow it to

warm up before pressing Start. Otherwise, the display

will not come on. The dryer is now ready for use.

Plate (Kit WE49X22606) Connect standard metal elbows and ducts to complete the exhaust system. Cover back opening with the plate (Kit WE49X22606) which can be purchased from GEApplianceparts.com or a local service provider. Place dryer in final location.
NEVER LEAVE THE BACK OPENING WITHOUT THE PLATE. (Kit WE49X22606)
16

WARNING – Electrical Shock Hazard
Disconnect power supply before servicing. Replace all parts and panels before operating. Failure to do so can result in death or electrical shock.
WARNING – Shock Hazard
Certain internal parts are intentionally not grounded and may present a risk of electric shock only during servicing. Service personnel ­ DO NOT contact the following parts while the appliance is energized: drum light, door switch, igniter, thermostats, flame detector or mica heater.

Installation Instructions REVERSING THE DOOR

ABOUT REVERSING THE DOOR
IMPORTANT NOTES:
· Read the instructions all the way through before starting.
· Handle parts carefully to avoid scratching paint.
· Set screws down by their related parts to avoid using them in the wrong places.
· Provide a non-scratch work surface for the door.
· Normal completion time to reverse the door swing is 30­60 minutes.
IMPORTANT:
Once you begin, do not move the cabinet until door swing reversal is completed. These instructions are for changing the hinges from the right side to the left side – if you ever want to switch them back to the right side, follow these same instructions and reverse all references to the left and right.
Tools needed:
Quadrex #1 bit screwdriver otherwise standard #2 Phillips screwdriver
Tape-tipped putty knife Small flat blade screwdriver
Before you start
Unplug the dryer from its electrical outlet

A REVERSING THE DOOR – SOLID DOOR MODELS (cont.)
2 Remove the bottom screw from each hinge (right
side) and partially insert them into each top hinge hole on the left side. NOTE: All 4 front panel hinge screws will now be in the top hinge holes – 2 on the left and 2 on the right.
3 Loosen each top hinge screw on right side.
Remove the door and place it on a protective flat surface to avoid any damage.
Loosen each top hinge screw on right side

Choose the REVERSING THE DOOR instructions A or B for your model.

A REVERSING THE DOOR – SOLID DOOR MODELS

1 Open the door approximately 130 degrees. With a

putty knife, remove the 4 plastic caps located

along the left side of the front panel and set them

aside.

Plastic Cap (4)

4 Remove both the blind plate and the striker plate/
metal striker and install them in opposite positions.
Blind plate
Striker plate/ Metal striker

Left side of front panel

17

Installation Instructions REVERSING THE DOOR (cont.)

A REVERSING THE DOOR – SOLID DOOR MODELS (cont.)
5 GTX52 model only: Remove 2 hinges and 8
screws (4 for the hinges and 4 for the outer door). Remove the inner door by lifting it up, using a flat blade screwdriver, and out.
Outer Door Screws
Hinges and Screws

A REVERSING THE DOOR – SOLID DOOR MODELS (cont.)
8 Mount the door on the 2 upper left side hinge
screws installed in step 2. Move the hinge screws loosened in step 3 into the lower left side screw holes and firmly tighten all 4 screws.
Hang door and tighten screws
Door

Inner Door

Outer Door Screw

Outer Door

6 GTX52 model only: Flip the inner door over.
Remove the dock by squeezing its tabs and pulling it out. Remove the latch catch by sliding down and pulling it out. Switch and install in the opposite positions.

4

Switch and

install in

opposite

3

positions

1

Squeeze and pull out

2

Slide down and pull out

7 GTX52 model only: Flip the inner door back
over and rotate it 180°. Replace it back into the outer door. Replace the 2 hinges and 8 screws (4 for the hinges and 4 for the outer door).

9 Install the 4 plastic caps removed in step 1 into
the 4 right side front panel holes.
Plastic Cap (4)
Right side of front panel
NOTE: To return the door to the original setup, follow these instructions, swapping “left” and “right”.
When you finish
Plug the dryer back into its electrical outlet.

18

Installation Instructions REVERSING THE DOOR

B REVERSING THE DOOR – GLASS PANEL DOOR MODELS
1 Open the door approximately 130 degrees. With a
putty knife, remove the 4 plastic caps located along the left side of the front panel and set them aside.
Plastic Cap (4)

B REVERSING THE DOOR – GLASS PANEL DOOR MODELS (cont.)
4 Remove both the blind plate and the striker plate
and install them in the opposite positions.
Blind plate

Left side of front panel
2 Remove the bottom screw from each hinge (right
side) and partially insert them into each top hinge hole on the left side. NOTE: All 4 front panel hinge screws will now be in the top hinge holes – 2 on the left and 2 on the right.

Striker plate

5 Remove the 4 door hinge screws, 6 inside screws
and 2 pocket screws. Lift the inner door upwards using a flat blade screwdriver.

Inside screws

Pocket screws Inside screw

Inner door

3 Loosen each top hinge screw on right side.
Remove the door and place it on a protective flat surface to avoid any damage.
Loosen each top hinge screw on right side

Door hinge screws

Outer door Inside screws

19

Installation Instructions REVERSING THE DOOR (cont.)

B REVERSING THE DOOR – GLASS PANEL DOOR MODELS (cont.)

6 Remove and swap the 2 plastic caps and the 2

hinges.

Install plastic caps from oposite side
here

Install hinges from oposite side here

Plastic caps

Inner door

B REVERSING THE DOOR – GLASS PANEL DOOR MODELS (cont.)
8 Mount the assembled door on the 2 upper left side
hinge screws installed in step 2. Move the hinge screws loosened in step 2 into the lower left side screw holes and firmly tighten all 4 screws.
Hang door and tighten screws
Door

Hinges

7 Rotate the outer door 180 degrees, mount the

inner door back into the outer door frame and

secure with the screws removed in step 5. Make

sure you mount the hinges on the side opposite

the pocket.

Pocket screws

Inside screws

Door hinge screws

Inside screw

Inside screw
Inside screw

Inner door Outer door

Inside screw

Rotate outer door 180°

9 Install the 4 plastic caps removed in step 1 into the
4 right side front panel holes.
Plastic Cap (4)
Right side of front panel
NOTE: To return the door to the original setup, follow these instructions, swapping “left” and “right”.
When you finish
Plug the dryer back into its electrical outlet.

20

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

GE Appliances User Manuals

Related Manuals