hager JK140MID Fitting 125A Meter Pack Instructions
- June 3, 2024
- hager
Table of Contents
Meter Kit Instructions
Instruction leaflet for fitting 125A Meter Pack
JK140MID
JK140MID Fitting 125A Meter Pack
Meter to be fitted when fitting incomer (see incomer instructions).
Incomer shown in place for illustration purposes.
Gently prise the DIN-rail from the support moldings.
Clip the pre-wired meter to the DIN-rail (A). Ensure the cables go behind the
rail. Please refer to the incomer fitting instructions for fitting of incomer
links.
Clip the DIN-rail back into position. Connect the neutral link first with the
M5 bolt, and then the shase links to the busbar stack, along with the loom
leads (L1, L2, L3 & N)
Ensure the meter cables have sufficient clearance from the phase links.
Ensure that all electrical connections on the incomer device are tightened to
3.5Nm. Ensure the copper link upper connection points are tightened to 5Nm.
Fit the fuse rail (B) and the CT block (C) to the pre-drilled holes or using
the double sided fixing tape provided.
Ensure label on front of CT reads [L1 L2 L3] when fitted.
Before fitting the shroud supplied with the meter pack kit, the device cut-out
aperture needs cutting with a knife. Remove (E).
When fitting a incoming meter in a 4 – 6 way 125A TPN board it is recommended
to use a JKD1125MID Meter extension box.
Hager Technical Service Centre: 01952 675 689
Hager Technical Fax: 01952 675 557
Hager Sales Service Centre: 01952 675612
Website: www.hager.co.uk
E-mail us: technical@hager.co.uk
Twitter: @hageruk
ZD0893 – Issue
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>