REINA A-BTN115WP Towel Rail Installation Guide

June 3, 2024
Reina

A-BTN115WP Towel Rail
Installation Guide
BURTON INSTALLATION GUIDE

A-BTN115WP Towel Rail

This product must be fitted only by a fully qualified installer.
DESCRIPTIONREINA A BTN115WP Towel Rail

ILLUSTRATION DESCRIPTION
appropriate fixing for the wall material if required Fixing choose the
PTFE tape
Electric drill
to the fixings Masonry drill bit appropriate
Adjustable spanner
Radiator valve hex key
Flat head and philips head screw drivers
1 lock shield valve and 1 gate or thermostatic valve
Spirit level
Measuring tape

REINA A BTN115WP Towel Rail - fig 10REINA A
BTN115WP Towel Rail - fig 11

1 WALL SCREW
2 WASHERS
3 BOTTOM BRACKET
4 WALL ANCHORS
5 WALL
6 RADIATOR SCREW
7 FIXING BRACKET
8 RADIATOR
9 TOP BRACKET
10 FIXING SCREW
11 WALL BRACKET
12 COVER
NAMES A
--- ---
BURTON 1180

GENERAL RECOMMENDATION

  • Before fitting the radiator it is necessary to wash out the heating system to remove any existing mud, scale, work residues, traces of flux, oil, etc.
  • When the system water pH is outside the 5,5-8,5 range and/or when the dissolved is above 0,1mg/liter, it is always needed to protect the heating system components  (the radiator is one of these) with a proper chemical treatment compatible with all parts in contact with water (silicon rubber too).
  • In order to fit the radiator to the wall, it is necessary to choose the proper fixings for the wall material.
  •  If the system water exceeds 50°C, please install a warning mark near the radiator to avoid any accidental scalding.
  • Maximum working temperature 95°C, maximum working pressure 4 bar.
  • Clean the radiator surface only with a soft cloth to avoid scratching the finish and do not use chemical agents during cleaning operations. It is prohibited to climb on the  radiator.

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Reina User Manuals

Related Manuals