murdock M-844 Series Hydrant Jug Filler Installation Guide
- September 25, 2024
- murdock
Table of Contents
murdock M-844 Series Hydrant Jug Filler
Specifications:
- Valve Specifications: Minimum/Maximum Pressure: 30/100 PSI
- Mounting Points: Provided 3/8 UNC anchoring hardware
- Supply Stop: Provided 1/2 NPT
Product Usage Instructions
Installation:
- Read all instructions and refer to local codes prior to installation.
- Include a supply stop appropriately located on the supply line.
- Install an in-line PRV on the supply line to ensure water pressure of 40 – 60 psi.
- Flush the supply line of all foreign materials.
- Drain piping and valve before exposure to freezing temperatures.
- Prepare trench for water supply and lay the supply line into it.
- Prepare a hole at the fountain location and lay the supply line above ground for trimming during hook up.
- Mount the fixture securely to the slab using provided mounting hardware.
- Make connections to the fountain’s 1/2 NPT supply inlet through the access panel.
Maintenance:
- Ensure concrete slab thickness meets local code requirements.
- Periodically check for leaks by testing the operation of the shower.
FAQ:
-
Q: What is the recommended water pressure for this product?
A: The recommended water pressure is between 40 – 60 psi. Ensure to install an in-line PRV for this purpose. -
Q: How should I prepare the trench for water supply?
A: Prepare a trench for the water supply and lay the supply line into it, ensuring it is flushed of all foreign materials such as pipe dope or chips. Ensure proper drainage and protection from freezing temperatures.
INSTALLATION INSTRUCTIONS FOR M-844 SERIES JUG FILLER
IMPORTANT: UNITS WITH OPTIONAL -FRU1, REFER TO -FRU INSTALLATION MANUAL
9938-340-0M1
Important: Read all instructions and refer to local codes prior to installation.
- It is recommended to include a supply stop appropriate located on the supply line.
- An in-line PRV installed on the supply line is recommended to ensure a working water pressure of 40 – 60 psi.
- Supply line must be flushed of all foreign materials such as pipe dope, chips, etc.
- Piping and valve must be drained prior to being subjected to freezing temperatures.
Prepare trench for water supply. At fountain location prepare hole to trench depth and large enough for a person to work in. Lay supply line into trench and above ground allowing extra line to be trimmed during hook up, refer to detail for roughs. Refill trench and hole, compacting back fill as required. Leave sufficient depth in hole to accommodate concrete pour, minimum 4” recommended. NOTE: Refer to local code to ensure appropriate slab thickness. Prepare slab area surrounding fountain spreading and compacting gravel as necessary. Prepare form approximately 1-1/2” diameter to protect supply stub outs.
Protect exposed supply line openings and to prevent damage to equipment or to prevent supply line from becoming filled with soil or debris. Then pour concrete, ensure concrete is flat and level. Once concrete has cured, install floor anchors, provided by installer, per anchoring manufacturers procedures. Align mounting points on the fountain to the mounting anchors in the concrete and secure fixture to the slab using the installer provided mounting hardware. Through access panel make up connection to the fountain’s 1/2” NPT supply inlet. To ensure plumb installation, lay a bubble level on fountain pedestal and adjust using shims or washers until the unit is level. To test operation of shower, depress activation pushbutton and check all connections for leaks.
GENERAL NOTES:
- ALL DIMENSIONS ARE IN INCHES (MM).
VALVE SPECIFICATIONS:
MINIMUM/MAXIMUM PRESSURE:30/100 PSI
Please visit www.murdockmfg.com for most current
specifications.
MURDOCK MFG. • 15125 Proctor Avenue • City of Industry, CA 91746 USA Phone
800-453-7465 or
626-333-2543
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>