Herz 4008 Heating Unit for Apartment Instruction Manual
- September 17, 2024
- Herz
Table of Contents
- 4008 Heating Unit for Apartment
- Specifications:
- Product Information:
- Product Usage Instructions:
- Connection of Pipelines:
- Commissioning:
- Concentration Water Content Guidelines:
- Recycling and Disposal:
- Q: How do I ensure proper water flow in the HERZ HIU
- Q: What materials are used in the construction of the HERZ HIU
4008 Heating Unit for Apartment
“`html
Specifications:
– Product Name: HERZ HIU MANCHESTER
– Product Type: Heating unit for apartment
– Model Number: No 0618 1 4008 49-061 1
Product Information:
The HERZ HIU MANCHESTER is a heating unit designed for apartment
use. It includes various components such as heat exchanger,
pressure and temperature regulator, summer bypass, dirt filter,
zone valves, thermostat, exhaust valve, water meter, thermal energy
meters, room thermostat, circulation pump, manometer, safety valve,
and expansion vessel.
Product Usage Instructions:
Connection of Pipelines:
1. Connect the pipelines to the pre-assembly console in the
specified order as per the functional diagram.
2. Ensure correct connection of inflow and return valves for the
heating circuit, cold water intake and outlet, hot water outlet,
and radiator heating flow and return.
Commissioning:
1. Open the heating circuit inlet valve slowly (red ball
valve).
2. Slowly open the cold water supply (green ball valve).
3. Open the heating circuit return valve slowly (red ball
valve).
4. Slowly open the outlets of hot and cold water (green ball
valve).
Concentration Water Content Guidelines:
– Follow the concentration water content guidelines provided to
ensure optimal performance and longevity of the equipment.
Recycling and Disposal:
– Dispose of the equipment and packaging responsibly by
utilizing recycling facilities and specialized trading
companies.
FAQ:
Q: How do I ensure proper water flow in the HERZ HIU
MANCHESTER?
A: Open the ball valves in the specified order to avoid water
overflow during commissioning.
Q: What materials are used in the construction of the HERZ HIU
MANCHESTER?
A: The product primarily consists of AISI 316 board, copper
soldering material, and other corrosion-resistant components.
“`
HERZ HIU MANCHESTER
HERZ heating unit for apartment
WÜS MANCHESTER
Instructions for operators and dealers, No 0618
Description WÜS Manchester, a compact unit for the preparation of hot water in
a continuous principle and for transferring heat to radiator heating using a
separating heat exchanger. Installation as a low-angle station or as a station
with a lid installed on the surface. The connection of pipes to the equipment
is carried out using a patented assembly system with a pre-assembly console.
The possibility of connecting the console of pre-assembly from the ground.
Consists of: · Copper soldered asymmetrical stainless steel plate heat
exchanger · The second heat exchanger for separating the system on the heating
side · Patented and WRAS certified pressure and temperature controller for
centralized control of hot water temperature · Circulation pump for secondary
heating circuit · Zone valve for room temperature regulation; Connection
thread for drives M 28 x 1.5 mm · Thermomotor for installation on a
differential pressure regulator; 230 V, 50 Hz, closed without power · Control
valve with thermostat with contact sensor for low heating return temperature ·
Constant readiness for hot water preparation even in summer mode, thanks to
temperaturecontrolled bypass switching, fixed at 45°C · Cold water meter
assembly 80 mm G 3/4 made of dezincification-resistant brass, also suitable
for continuous operation · Heat gauge adapter 110 mm G 3/4 made of
dezincification-resistant brass, also suitable for continuous operation · Fast
ventilation on the secondary side · Membrane expansion vessel on the secondary
side · Diaphragm safety valve 3 bar secondary side · Dirt trap with a fine
mesh in the primary stream · Dirt trap with a fine mesh in the secondary
return stream Execution 1 4008 49 HERZ WÜS MANCHESTER; 15 l/min hot water tap
1 4008 49-061 1
HERZ HIU MANCHESTER Accessories 1 4008 04 HERZ pre-assembly bracket 1 4008 85
HERZ low-mounted mounting box 1 4008 86 HERZ top wall mount cover 1 4008 98
HERZ Measurement, Adjustment and Draining Kit WÜS 1 4111 60 HERZ sensor holder
for heat meter temperature sensor (M10x1)
Installation instructions · During installation, you should follow the
dimensional sketches and information signs included with the device. · When
choosing a place for installation, it is necessary to take into account the
weight of the equipment, including the weight of the water filling. · If the
equipment is equipped with redevelopments, installed in small rooms or false
ceilings and the like, it is important to ensure that the front of the device
is freely available for repair. · During installation, it is important to
ensure that the mounting wall is straight so that the equipment can be
properly attached. · Depending on the mounting surface, you should choose the
appropriate dowels and screws. · Adequate ventilation must be provided to
prevent an increase in the temperature of the builtin parts.
Safety · Assembly and installation should only be carried out by
professionally trained installers. · Damaged parts and equipment components
can only be replaced with original spare parts. · Before putting the system
into operation, it is necessary to check that there are no leaks at all
connection points. · After installation, all screws should be checked again to
make sure that they are secured. · The temperature of the hot water tap may
vary depending on the current amount of tap, the current differential pressure
of the system and the current flow temperature, and may also be in the
temperature range where there is a risk of scalding. To avoid scalding, the
drinking water mixing valve should be installed centrally or in front of each
tap as a safety device. · No technical changes may be made to the system. The
consumer is not technically allowed to change the device, as no liability is
assumed for any resulting damage to the system. · The equipment may be
installed only in heating or installation premises in accordance with the
rules.
2
HERZ HIU MANCHESTER Functional diagram
7
2 1
7
6
12
16
5
7
15 14 1
9
4
8
3
13 4
10 10 11 11 11 10 10
Position 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Description Heat exchanger of the heating circuit Pressure and temperature regulator Summer bypass Dirt filter Zone valve with thermomotor Zone valve with thermostat with contact sensor Exhaust valve Installation of a water meter Installation of thermal energy meters The inflow point of the heating circuit Outlet point of the heating circuit Room thermostat Heating circuit circulation pump Manometer Safety valve Expansion vessel
3
Connection of pipelines to the pre-assembly console
HERZ HIU MANCHESTER
7 6 5 4 3 2 1
1
Inflow valve of the heating circuit
2
Heating circuit return valve
3
Cold water intake
4
Cold water outlet
5
Hot water outlet
6
Radiator heating flow
7
Return of radiator heating
Operational requirements In addition to state rules and standards, the
conditions for connecting local water supply companies must also be observed.
The room in which the system is operated must be frost-free, and installation
must take place in a place freely accessible for necessary maintenance or
repair. The maximum flow temperature must be 80 °C. On the primary side, a
static and a differential pressure of 10 bar is allowed. In addition, it
should be noted that in the event of a defect, the connecting pipes must
withstand temperatures up to 95 °C.
Commissioning The operation of the equipment is simple and user-friendly. All
you need to do is open the ball valves in the following order to avoid water
overflow:
1. Slowly open the heating heaters (red ball valve) 2. Slowly open the cold
water supply (green ball valve) 3. Open heating slowly returns (red ball
valve) 4. Slowly open the outlets of hot and cold water (green ball valve)
First commissioning Before commissioning for the first time according to ÖNORM
H5195-1, care must be taken to ensure that clean and standard-compliant pipe
materials are used (without scale, rust and internal well, as well as without
impurities), fittings and equipment (boilers, radiators, convectors, expansion
vessels, etc.). In addition, ÖNORM H5195 provides for clean and hand-made
production (without welding beads, remnants of sealing material or soldering
aids, burrs, metal shavings and the like), as well as cleaning all components
of the heating system before its installation. Otherwise, deposits in the
pipes can lead to damage to the regulator. In addition, there is a risk of
contamination of drinking water. It is recommended to install mud flanges. To
prevent corrosion damage to the system, ÖNORM H5195-1 states: The design and
operation of the heating system must be carried out in such a way that the
ingress of air into the closed heating system is prevented as best as
possible.
4
HERZ HIU MANCHESTER
When first commissioned, the heating system must be flushed with at least 2
times the contents of the system. Afterwards, clear filtered (pore size < 25m)
filling water of appropriate water quality must be introduced into the heating
system. The heating system must remain in working order for 24 hours to
achieve uniform mixing of heating water with inhibitors. Old systems must be
chemically cleaned before filling, and then rinsed with water. Partial or
complete emptying of the heating system for a longer period without
preservation should be avoided, as this will lead to increased corrosion
processes in the system. To provide sufficient protection against frost in the
system at low temperatures, ÖNORM H5195-2 states: Although antifreeze can be
mixed with water in any proportion, in systems with circulation pumps, you
must first fill about two-thirds of the required amount of water into the
system. Then antifreeze is added and filled into the system with water. When
putting the circuit into operation, complete mixing is achieved. However,
gravity systems must be filled with a prepared, frost-protected heat carrier.
If antifreeze must be connected to heating systems that are not yet protected
from frost, the following points must be observed: 1. It must be ensured that
sealing materials are suitable for this. 2. Systems must be rinsed thoroughly.
3. After filling with antifreeze, more attention should be paid to the
occurrence of leaks. After installation, the system should be checked for
leaks. Checking the system for leakage is carried out only if the positive
line is connected and the ball valve of the pulse line is opened. The pressure
should be increased evenly at all joints. Max. test pressure = 1,5 x working
pressure. Max. differential pressure 2 bar in water. For other media, the
leakage test must be carried out with the corrected value. Failure to comply
may cause damage to the system or controller and automatically lead to loss of
warranty!
Decommissioning, emptying If the pumping station is stopped for a long time or
is dismantled for certain reasons, it is stopped by closing all ball valves.
In rooms threatened with frost, the equipment must be emptied before the onset
of the cold season, if it does not work for several days. To drain this
equipment, a container with a capacity of 4 – 8 liters should be placed under
it and hot water from the ball valves should be drained until completely
empty. If there is a risk of frost, it should also be borne in mind that it
can freeze not only in the water unit and hot water pipes, but also in all
cold water supply pipes to the service fittings and the equipment itself.
Therefore, it is advisable to drain all waterbearing fittings and pipes back
to the frost-proof part of the home water system.
Maintenance and repair Thanks to the design, the HERZ station has relatively
low maintenance. However, with hard water, the system will limp. Descaling
should be carried out by a specialist every one to two years, depending on the
hardness of the water. If the valves are calcified too much, they must be
replaced immediately to ensure proper operation. Do not use abrasive or
aggressive cleaners to clean the device. It is recommended to clean with a
damp cloth with the addition of a few drops of liquid household cleaning
agent. In addition, for proper operation, you should pay attention to the
quality of the water in the heat exchanger. The corresponding limit values can
be found in the table below.
5
EXPLANATIONS: + Good resistance under normal conditions 0 Corrosion may occur, especially if other factors are estimated at 0 – Use is not recommended
HERZ HIU MANCHESTER
CONCENTRATION WATER CONTENT
(mg/l or ppm)
TIME LIMITS Analysis before
Board AISI 316
Soldering material
Copper
70<
0
Alkalinity (HCO3-)
70-300
Within 24 hours
300
0/+
70<
Sulfate[1] (SO4 2-)
70-300
No limit
0/-
300
–
HCO3- / SO4 2-
1.0
No limit
< 1.0
0/-
<10 S/cm
0
Electrical
conductivity
10-500 S/cm > 500 S/cm
No limit
+ +
+ 0
pH[2]
< 6.0
0
0
6.0-7.5
0
Within 24 hours
7.5-9.0
9.0
0
2<
Ammonium (NH4+)
2-20
Within 24 hours
0
20>
–
Chlorides (Cl-)
< 100
100-200
See table below
No limit
200-300
300
–
0/+
1<
Free chlorine (Cl2)
1-5
Within 5 hours
–
0
5>
–
0/-
Hydrogen Sulfate
< 0.05
No limit
(H2S)
0,05
0/-
5<
Free (aggressive)
5-20
No limit
0
carbon dioxide
20>
–
(CO2)
Total hardness (°dH)
4.0-8.5
No limit
Nitrate[1] (NO3-)
< 100
No limit
100
0
Iron[3] (Fe)
< 0,2
No limit
0,2
0
< 0,2
Aluminum (Al)
No limit
0,2
0
Manganese[3] (Mn)
< 0.1
No limit
0,1
0
[1] Sulfates and nitrates act as inhibitors for preventing corrosion caused by chlorides in a pH-neutral environment [2] In general, a low pH (below 6) increases the risk of corrosion, and a high pH (above 7.5) reduces the risk of corrosion [3] Fe3+ and Mn4+ are strong oxidizing agents and can increase the risk of local corrosion in stainless steel [4] In combination with copper soldering material SiO2 above 150 ppm increases the risk of calcification
6
HERZ HIU MANCHESTER Recycling and disposal Both the equipment and the
associated transport packaging mostly consist of recyclable raw materials.
Device: The equipment, as well as all accessories, does not fall into
household waste. Make sure your device and any accessories you have are
properly disposed of. Packaging: Leave the disposal of transportation
packaging to a recognized specialized trading company that installed the
device.
7
Dimensions
HERZ HIU MANCHESTER
8
HERZ HIU MANCHESTER
9
HERZ HIU MANCHESTER
10
HERZ HIU MANCHESTER
11
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>