Honeywell HON-DACT-DS Fire Alarm Control Panel Installation Guide

August 31, 2024
Honeywell

HON-DACT-DS Fire Alarm Control Panel

“`html

Product Information

Specifications:

  • Model: HON-DACT-DS

  • Mainboard Power Connection: Not using UART and RS-485B

  • Compliances:

    • ETL Listed for UL 864 (10th Ed.) requirements

    • NFPA 72 National Fire Alarm and Signalling Code
      requirements

    • NFPA 70 National Electrical Code requirements

    • FCC ID: 1W6AL02ACGWMB

    • ETL Control Number: 5025335

Product Usage Instructions:

Mainboard Power Connection:

Ensure that UART and RS-485B connections are not used for the
HON-DACT-DS model.

Supported Fire Alarm Control Panels:

The dialer is compatible with various Honeywell fire alarm
control panels. Refer to the installation and user manual for
details.

Connecting for Monitoring Services:

Ensure that the digital alarm communicator is compatible with
the monitoring station receiver and that phone numbers are
registered with the vendor. Avoid call forwarding on the designated
phone numbers.

UL Power-Limited Requirements:

Follow the specified guidelines for power-limited circuit wiring
separation and markings when connecting power-limited sources and
devices.

Verifying the Connections:

After installation, verify all connections to ensure proper
setup and functionality.

FAQ:

Q: What should I do if I encounter issues during

installation?

A: If you face any difficulties during installation, refer to
the user manual or contact customer support for assistance.

“`

Connected Life Safety Services HON-DACT-DS Quick Installation Guide

The HON-DACT-DS dials to telephone number(s) and alarm transmission occurs through primary and secondary telephone line connection to alarm monitoring stations.
This guide covers the basic installation and initial setup of the HON-DACT-DS
Supporting Documents
HON-DACT-DS User Manual (LS10406000HW-E).
Installation documents for your fire alarm control panel.
Refer to the Honeywell Fire Alarm Panel Brand websites or log in to https://fire.honeywell.com/

Mainboard Power Connection

Note: UART and RS-485B are not used for HONDACT-DS

01

05

140, Waterside Rd Leicester LE5 1TN, UK +44 (0) 203 4091779
12, Clintonville Rd Northford, CT 06472
ECN: 00052390, P/N: LS10406-351 HW-E, Rev. A, JUN. 2024
© 2024 Honeywell International Inc.
Disclaimer
Images in the document are for reference purpose only and are subject to change. All trademarks are property of their respective owners. Technical changes reserved!

Supported Fire Alarm Control Panels
The dialer operates with various Honeywell fire alarm control panels. To know their details, refer to the HON-DACT-DS Installation and User Manual (LS10406-000HW-E) supported panel section.
Panel-Side Connections
To know about the panel-side connection steps, refer to the installation document for HON-DACTDS and the respective panel.
02

Connecting for Monitoring Services
The Telco/POTS card should be the first device on the incoming telephone circuit. IMPORTANT: Check that the wire gauge is at least 26 AWG. DACT-DS Side Step 1: Connect the Primary phone line (PH1) to the J4 port of the Telco/POTS card. Step 2: Connect the Secondary phone line (PH2) to the J5 port of the Telco/POTS card. RJ31X Jack Side Step 1: Connect the Primary phone line (PH1) to its RJ31X jack. Step 2: Connect the Secondary phone line (PH2) to its RJ31X jack. IMPORTANT: After completing the installation, verify the communication between the DACT and alarm monitoring station receiver.
06

Compliances
ETL Listed for UL 864 (10th Ed.) requirements (41.3.2.9)
NFPA 72 National Fire Alarm and Signalling Code requirements
NFPA 70 National Electrical Code requirements
FCC ID: 1W6AL02ACGWMB ETL Control Number: 5025335 This device complies with Part 68 of the FCC
Rules adapted by ACTA.

Ensure Before Connecting
The digital alarm communicator and transmitter are compatible with the alarm monitoring station receiver.
The primary and secondary phone numbers are registered with the vendor for the alarm services.
The phone number(s) that the HON-DACT-DS will use is not call forwarded.
You have two RJ31X jacks and two telephone cables (7-feet), separately ordered.
The service technician installing this device is trained and experienced in this activity.
The wiring complies with all the applicable codes and regulations.
The technician has carefully read the instructions and markings. Failure to follow them could damage the product or cause a hazardous condition.

03

TELCO/POTS CARD
07

HON-DS-DACT Parts

UL Power-Limited Requirements
All power-limited circuit wiring must remain 0.25 inches (6.35mm) from non- power-limited circuit wiring.
Power-limited (Class 2) and non-power-limited circuit wiring must remain separated in the cabinet.
All power-limited and non-power-limited circuit wiring must enter and exit the cabinet through different knockouts or conduits.
When a power-limited source and a powerlimited device are connected, remove the power limited markings.
Each non-power-limited circuit connected to these modules must be identified in the space provided on the cabinet door label.
If additional knockouts are added to the backbox, proper separation of power- limited and non-power-limited wiring should be maintained.
04

Verifying the Connections
After making all the connections check the LED indicators on the Telco/POTS card. · LED5 Green ­ Power LED: Indicates POTS card
has power.
· LED3 Green ­ Kiss off LED: Flashes ON whenever the DS Dialer successfully transmits an event to the alarm monitoring station. The Kiss off LED may turn ON several times.
· LED4 Green ­ Heartbeat LED: Flashes every 1 second to indicate that the POTS card microprocessor is running.
· LED7 Red ­ HON-DACT-DS Line 1: ON indicates HON-DACT-DS Line 1 is activated (off-hook).
· LED8 Red ­ HON-DACT-DS Line 2: ON indicates HON-DACT-DS Line 2 is activated (off-hook)
08

Installing the HON-DACT-DS
Step 1. On Mainboard, connect USB Type C converter.
Step 2. Connect Ethernet port cable to the PC.
Step 3. Press and hold the S6 button on Mainboard, for a minimum of 6 seconds, and then release it. It will switch the HONDACT-DS to the configuration mode. The LED indicator DL3 on Mainboard turns ON and SOLID, indicating that the configuration is enabled.

Step 5. Enter the password in the Sign In page. NOTE: The default password is: Welcome123
Step 6. In the Panel Settings Page, Enter the Panel details and Save.

Generating Central Station Report
Step 1: Log on to CLSS Site Manager: https://fire.us.honeywell.com/
Step 2: Select the site and building where the HON-DACT-DS is installed or add HON-DACT-DS customer and device details if not existing.
Step 3: Click Feature Activation and select DSDACT for HON-DACT-DS.
Step 4: Follow the on-screen instructions to generate and download the central station report.
NOTE: Refer to the HON-DACT-DS User Manual (LS10406-000HW) for report settings and report format details.

09
Step 4. Open the Chrome browser, https://192.168.10.190:9443/config/inde x.html
NOTE: Configuration PC Ethernet settings need to be changed to static IP address:
1. Go to Control Panel>Network and Internet>Network Connection.
2. Right click on the Ethernet, Go to Properties, double click Internet Protocol Version 4 (TCP/IPv4)
3. Select “Use the Following IP address” and Update as below, IP address: 192.168.10.180 Subnet: 255.255.255.0 Default Gateway: 192.168.10.1

11
Step 7: In the Configuration page, Enter the Central station receiver details and Save, then it connects to the Central station.

10

12

13
Environmental Specifications
Temperature: 0°C to 49°C (32°F to 120°F) Relative Humidity: 1% to 93% Non- condensing An installation environment with a normal room temperature of 15º C to 27º C (60 to 80º F) is recommended.
Operational Specifications
Power Supply: 18V to 30V Typical Current consumption: 200mA @ 18V 150mA @ 24V
14

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Honeywell User Manuals

Related Manuals