Mau PEBBLES Wall Shelf Instruction Manual

August 31, 2024
Mau

PEBBLES

Assembly Instructions

Scan the QR code to view the assembly video or go to maupets.com/pages/assembly

INSTRUCTIONS FOR DRY WALL ONLY

INCLUDED PARTS

Label| Shape| Description| Quantity
A| | Metal Bracket| 1
B| | Anchor| 4
C| | M5 x 50mm Bolt| 4
REQUIRED TOOLS
D| | 5/8″ Drill bit| 1
E| | Leveler| 1
F| | Power Drill| 1

QUESTIONS?
Contact support at info@maupets.com

STEP 1
Place the metal bracket (A) against the wall and use a leveling tool (E) to make sure it is straight. Then use a pencil to mark the holes on the bracket (A).

STEP 2
Use a 5/8″ drill bit (D) to drill the holes where you marked the wall in step 1.

STEP 3
a. Insert the bolts (C) through the front of the bracket (A) and then screw anchors (B) to the tips of the bolts (C) on the other side of the bracket(A).
b. Make sure to keep anchors (B) toward the tip of bolt (C) , but have some threading sticking out of the anchor.

Anchors should be at the tip of the screw

STEP 4
Push the anchors (B) into the holes that you drilled.

STEP 5
To tighten the screws (C) , make sure to put tension on the anchors (B) by pulling the metal bracket (A) toward you (view figure 51). This will ensure the anchors behind the wall are latched onto the wall and tightening. Then tighten each of the screws (C) little by little, alternating screwings until it is fully tight, about 4 rounds of tightening. The most important part is to keep tension on the screws while tightening. (view figure 5.2).

FIGURE 5.1

  1. PULL BACK

Alternate screwing in little by little to keep tension. Make sure all screws are at the same length after each round of tightening.

FIGURE 5.2

ROUND 1          ROUND 2     ROUND 3      ROUND 4

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals