Carrier VECTOR 8811MT Trailer Refrigeration Unit Owner’s Manual

August 23, 2024
Carrier

Carrier VECTOR 8811MT Trailer Refrigeration Unit

Specifications

  • Model: VECTOR 8811MT (NDV), 2 & 3COMPARTMENT MUTI-TEMP DOMESTIC
  • Weight: 1925 lbs [873 kg] (Wet, lessbattery)
  • Battery: 80 lbs [36 kg] maximum

Product Information

The VECTOR 8811MT reefer unit is designed for multi-temperature domestic applications. It comes with various installation components and detailed instructions for proper setup.

Installation Instructions

Complete Installation

  • Unit Installation: Mount the unit properly following the provided guidelines.
  • Battery Installation: Install the battery with the drain hose.
  • Pre-Delivery Inspection (PDI): Complete the PDI per model specifications.
  • Defrost Line Routing: Route and clamp the defrost line correctly.
  • Fuel Line Connections: Connect the fuel lines to the unit as instructed.

Unit Mounting Requirements

The trailer or boxcar structure must be evaluated to ensure it can withstand the loads imposed by the unit over its service life.
Proper mounting surfaces and dimensions are crucial for installation.

Mounting Surfaces

  • Mounting Pads: Must be uni-planar to prevent distortion of the unit and trailer.
  • Mounting Studs: Should not protrude more than 3.0 inches for correct installation.
  • Mounting Gasket: Should not protrude more than 0.19 inches above the defined plane for a proper air seal.

Metric Conversions
All dimensions provided are in inches, with metric conversions in [millimeters].

CROSS-REFERENCE INDEX

NOTES

  1. COMPLETE INSTALLATION INCLUDES AND IS NOT LIMITED TO:

  2. UNIT INSTALLATION

  3. BATTERY INSTALLATION, INCLUDING DRAIN HOSE

  4. COMPLETION OF PRE-DELIVERY INSPECTION(PDI) PER MODEL

  5. UNIT PREP AND INITIAL ADJUSTMENTS

  6. CHECKLIST

  7. UNIT RUN IN PER PDI CHECKLIST

  8. WARRANTY REGISTRATION CARD SUBMITTAL

  9. DEFROST LINE ROUTING AND CLAMPING

  10. FUEL LINE CONNECTIONS TO UNIT

  11. THE TRAILER OR BOXCAR STRUCTURE MUST BE EVALUATED BY THE TRAILER OR BOXCAR MANUFACTURER TO DETERMINE IT’S ABILITY TO WITHSTAND THE LOADS IMPOSED BY THE UNIT OVER IT’S SERVICE LIFE. CARRIER TRANSICOLD DOES NOT CONVEY ANY ENDORSEMENT OR WARRANTY FOR THE TRAILER’S OR BOXCAR’S STRUCTURAL INTEGRITY.
    WEIGHTS:
    VECTOR 8811MT REEFER UNIT (WET, LESS BATTERY) :
    1925 LBS [873 kg] BATTERY (TYPICAL):
    80 LBS [36kg] MAXIMUM

  12. UNIT MOUNTING SURFACES OF THE TRAILER OR BOXCAR THAT CONTACT THE UNIT MOUNTING
    PADS MUST BE UNI-PLANAR TO WITHIN 0.13 [31 TO PREVENT DISTORTION OF
    THE UNIT AND/OR TRAILER.

  13. MOUNTING STUDS MUST NOT PROTRUDE MORE THAN 3. 0 INCHES FROM THE TRAILER
    OR BOXCAR SURFACE FOR PROPER INSTALLATION OF THE MOUNTING HOLE PLUGS

  14. TRAILER OR BOXCAR SURFACES THAT CONTACT THE UNIT MOUNTING GASKET SHOULD NOT PROTRUDE MORE THAN 0.19 [51 ABOVE THE PLANE DEFINED BY THE MOUNTING PAD SURFACES TO ENSURE PROPER AIR SEAL.

  15. ALL DIMENSIONS SHOWN ARE IN INCHES, WITH THE METRIC CONVERSIONS IN [MILLIMETERS].

  16. PRE-DELIVERY INSPECTION AND WARRANTY REGISTRATION DOCUMENTS ARE SHIPPED WITH UNIT AND ARE LOCATED IN THE FUEL TANK AND UNIT INSTALL KITS.

KIT NO.| INSTALLATION

DRAWING NO.

| MODEL DESCRIPTION
---|---|---
 |  |
76-02066-01| 98-02773| VECTOR 8811MT rnDVI. 2 /, 3 COMP/1.RTMEtH MUTI-TEMP DOMESTIC
CONTENTS| SHEET
---|---
GENERAL INFORMATION|
SWING RADIUS| 2
UNIT DIMENSIONAL DATA| 2
EVAP DACK PANEL TRAILER OR RAIL| 3
TRAILER OR BOXCAR PREPARATION| 4
UNIT INSTALLATION| 5
UNIT LIFTING LOCATION| 5
B A TTERY INSTALLAT[ON| 6 & 7
STAND BY POWER PLUG INSTALLATION| 8
BOTTOM PANEL INSTALLATION| 9

SHEE T

INDEX

| REV| A| A| A| A| A| A| A| A| A
---|---|---|---|---|---|---|---|---|---|---
S H EET|  | 2| 34|  | 56|  | 7| 8| 9

SEPARATE PARTS LIST

UNIT DIMENSION INFORMATION

ALL UNIT VERSIONS

TRAILER OR BOXCAR BODY PREPARATION

CAUTION: UNIT MOUNTING SURFACES OF TRAILER OR BOXCAR THAT CONTACT THE UNIT MOUNTING PADS MUST BE UNI-PLANAR TO WITHIN 0. 13131 TO PREVENT DISTORTION OF UNIT AND/OR TRAILER/BOXCAR.

CAUTION: TRAILER OR BOXCAR SURFACES THAT CONTACT THE UNIT MOUNTING GASKET SHOULD NOT PROTRUDE MORE THAN 0.19151 ABOVE THE PLANE DEFINED BY THE MOUNTING PAD SURFACES TO ENSURE PROPER AIR SEAL.

NOTE: MOUNTING STUD NOT TO EXCEED 3.00 INCHES FROM TRAILER OR BOXCAR BODY FOR PROPER INSTALLATION OF MOUNTING HOLE PLUGS.

UNIT INSTALLATION

NOTE: BULKHEAD, AIR CHUTE AND TRANSITION DUCT SHOWN ARE OPTIONAL FEATURES. FOR BEST AIR CIRCULATION AND PRODUCT PROTECTION CARRIER TRANSICOLD HIGHLY RECOMMENDS THE USE OF BULKHEADS AIR CHUTES AND TRANSITION DUCTS. CONTACT YOUR DEALER OR CARRIER TRANSICOLD FOR RECOMMENDATIONS.

PREPARE UNIT FOR INSTALLATION:

  1. PREPARE THE BODY TO RECEIVE THE UNIT. DIMENSIONS FOR EVAPORATOR OPENING AND MOUNTING STUD LOCATIONS AND LENGTHS CAN BE FOUND ON SHEET 4 OF THIS DRAWING.

  2. REMOVE WIRE TIES HOLDING DEFROST DRAIN HOSES, COOLANT OVERFLOW TUBE, AND FUEL LINES. PLACE LINES WHERE THEY WILL NOT BE CAUGHT BETWEEN THE UNIT FRAME AND THE MOUNTING SURFACE.
    REMOVE PALLET MOUNTING ANGLE ON BACK BOTTOM OF FRAME.

  3. OPEN SIDE DOORS TO ALLOW ACCESS TO MOUNTING STUD LOCATIONS ON UNIT.

  4. PLUG UNUSED HOLE WITH HOLE PLUG.
    ACCORATNO TO INSTRU REMOVE ME SEATS OVERS

  5. TERMINAL COVERS OR CONNECT

  6. PREPARE THE UNIT FOR LIFTING:
    STANDING ON A LADDER OR WORK-STAND, MAKE A CLOSE-UP INSPECTION OF THE CONDITION AND INTEGRITY OF THE LIFTING EYES,THEN HOOK LIFTING APPARATUS (LIFTING SPREADER BAR WITH SUFFICIENT CAPACITY TO SUPPORT UNIT AND BATTERY
    THROUGH THE LIFTING EYES.
    WARNING: HOOKS OR CLEVISES SHOULD BE EQUIPPED WITH A LOCKING FEATURE. LIFT POINT SHOULD BE CENTERED OVER THE UNIT’S CENTER OF GRAVITY (SEE SHEET 2). WHILE LIFTING THE UNIT INTO PLACE, INSTALLER SHOULD NOT BE UNDER OR IN PROXIMITY OF THE SUSPENDED UNIT.

  7. RAISE THE UNIT AND INSTALL IN THE BODY OPENING. ENSURE THAT ALL EIGHT STUDS ARE FULLY ENGAGED IN THE UNIT FRAME. PLACE WASHER (ITEM

  8. AND LOCK-NUT (ITEM 45) ON EACH OF THE 8 STUDS. (NOTE: THE LOWER CENTER STUD MUST BE ACCESSED FROM THE FRONT OF THE UNIT.) SNUG THE NUTS, THEN EVENLY TIGHTEN ALL EIGHT TO 60 FT-LB/81.6 NM USING A TORQUE WRENCH. REMOVE LIFTING APPARATUS.

  9. INSTALL MOUNTING HOLE PLUGS (ITEM 92) IN UNIT FRAME WHERE MOUNTING STUDS ARE LOCATED. ENSURE ALL 9 LOCATIONS HAVE HOLE PLUGS. IF THE MOUNTING STUD EXCEEDS THE MAXIMUM LENGTH OF 3.0 INCHES FROM THE TRAILER OR BOXCAR SURFACE,A PRE-CUT SLIT IS INCORPORATED IN THE MOUNTING HOLE PLUG TO ALLOW THE STUD TO PROTRUDE THROUGH THE PLUG. (SEE SHT. 4) .

  10. ROUTE DEFROST DRAIN HOSES DOWN THE FRONT OF THE TRAILER OR BOXCAR AND CLAMP TO FRONT WALL USING 2 CLAMPS (ITEM 15) AND 2 THREAD FORMING SCREWS (ITEM 30) FOR EACH DRAIN HOSE. CUT HOSE TO PROPER LENGTH (APPROXIMATELY 3.00(76.21 ABOVE 5th-WHEEL PLATE ON TRAILER) AND INSTALL KAZOOS (ITEM 90) ON THE HOSES.
    INSTRUCTIONS FOR FUEL LINE CONNECTION ARE SUPPLIED WITH THE FUEL TANK KIT. INSTRUCTIONS FOR LIGHT BAR INSTALLATION ARE INCLUDED WITH THE LIGHT BAR KIT.
    AFTER INSTALLATION

  11. PERFORM PRE-DELIVERY INSPECTION. COPIES OF COMPLETED CHECKLIST SHOULD BE SUPPLIED TO SELLING DEALER AND CUSTOMER.

  12. OPERATE UNIT IN CONTINUOUS RUN WITH REAR DOORS OPEN (MANUAL) MODE.
    REFER TO THE PRE-DELIVERY INSPECTION FORM SUPPLIED WITH UNIT FOR TIME.
    THE RECOMMENDED LENGTH OF TIME. PERFORM FINAL INSPECTION ON UNIT.
    RUN- IN SET UP SHOULD BE “PER PDI SHEET”.

  13. IMPORTANT: PRIOR TO FINAL DELIVERY TO CUSTOMER, WARRANTY REGISTRA-SHOULD
    TION MUST BE_ COMPLETED. ONE COPY SHOULD BE PROVIDED TO THE CUSTOMER,TRANSICOLD® IN- SERVICE DATE MUST ON STAMPED ON THE SENT IN CARRIER DATE MUST BE STAMPED ON THE UNIT IN THE PROPER LOCATION (SERIAL NUMBER PLATE) TO ACTIVATE WARRANTY COVERAGE.

  14. OPTIONAL BULKHEAD CONFIGURATION: HOLE PATTERN OR OPEN AREA FOR RETURN AIR FLOW MUST TOTAL AT LEAST 2. 75 SQ. FT.
    OF_AIR PASSAGE. HOLE PATTERN OR OPEN
    AREA MUST BE RECESSED SO THAT CARGO LOADED AGAINST BULKHEAD WILL NOT CARGO LOADED
    OBSTRUCT AIR PASSAGE OPENINGS. PERFORATED BULKHEADS, THAT MEET THESE REQUIREMENTS, MAY BE INSTALLED TIGHT WITH FLOOR.

BATTERY INSTALLATION INSTRUCTIONS

SEE NEXT SHEET FOR PICTORIALS OR REFER TO BATTERY INSTALLATION DOCUMENT IN POLY BAG FASTENED TO BATTERY TRAY PLATE.

UNITS SUPPLIED WITH BATTERY INSTALLED

  1. CUT WIRE TIE(S) THAT HOLD BATTERY CABLES TO UNIT FRAME.
  2. COACK CABLE TO NEGATIVE TOBATER TERMINAL USE OR CORROSMON TOOTER IS RECOMMENDED).
  3. POSITION TERMINAL COVERS SUPPLIED WITH CABLES OVER TERMINALS.

UNITS SUPPLIED WITHOUT BATTERY INSTALLED

  1. USE THE FOLLOWING INFORMATION TO CORRECTLY SELECT THE BATTERY PERFORMANCE NEEDED FOR REFRIGERATION UNITS.
    GROUP SIZE: GROUP 31
    VENT LOCATION: SIDE VENT
    VOLTS: 12 VOLTS DC
    AMPERAGE: MINIMUM 700 COLD CRANKING AMPS @ 0° F
    MINIMUM 545 COLD CRANKING AMPS @ – 20°F
    NOTE: WHEN SELECTING A SPECIFIC BRAND OF BATTERY, ALWAYS ENSURE THAT THE BATTERY CHOSEN IS RATED AT 0ºF (O DEGREES FAHRENHEIT) AND NOT O°C (0 DEGREES CELSIUS) .
    FAILURE TO USE THE PROPER BATTERY SIZE WILL RESULT IN REDUCED BATTERY LIFE AND A NO – START CONDITION. THE RECOMMENDED MAXIMIM BATTERY WEIGHT IS 80 LBS.

  2. CUT WIRE TIE HOLDING THESE PARTS IN THE BATTERY TRAY AND REMOVE PARTS.
    PLACE BATTERY IN TRAY WITH POSITIVE (+) TERMINAL TO THE REAR OF THE UNIT (AS SHOWN). CONNECT BATTERY CABLES (THE USE OF A CORROSION INHIBITOR ON CHELE PM MAE NÉGATICE MEN FERM RAL CARBEES SHOULD DE ROUTED MONARD BLACK COMPRESSOR (AS SHOWN). TIGHTEN TERMINAL CONNECTORS SECURELY.

  3. INSTALL SCREWS AND HOLD-DOWN CHANNEL USING PLAIN AND LOCK WASHERS_ AS SHOWN. SECURELY TIGHTEN THE SCREWS TO PREVENT MOVEMENT OF THE BATTERY.

  4. POSITION TERMINAL COVERS SUPPLIED WITH CABLES OVER TERMINALS.

NOTE

  1. CAUTION: DUE TO DIFFERENT BATTERY MEG.
  2. WHEN APPLYING TORQUE
  3. TO BATTERY U-BRACKET, MAKE SURE THERE IS NO BATTERY HOUSING DISTORTION OR CRUSHING.

INSTALL BATTERY INTO
UNIT WITH POSITIVE (+) TERMINAL
TOWARD THE REAR.

VIEW A – A
BATTERY CABLE ARRANGEMENT.

BATTERY INSTALLATION PROCEDURE FOR UNITS SHIPPED WITHOUT BATTERY.
LOCATE BAG STRAPPED TO VERTICAL REAR TUBE NEXT TO BATTERY TRAY
AND REMOVE U-BRACKET, L-BRACKETS & MOUNTING HARDWARE.

Electrical Specifications & Minimum Standby Infrastructure for Carrier Transicold Trailer Units Equipped with Standby

Minimum Requirements for Standby Infrastructure

  1. Ensure that the standby power installation is performed by a licensed electrician who is familiar with both local and national electric codes and requirements.
  2. Each refrigeration unit must be protected by an individual circuit breaker sized per the appropriate unit electrical specification listed above.
  3. A continuous earthing ground conductor must be provided at the plug and through the power cord to the refrigeration unit.
  4. Carrier Transicold recommends that customers establish an Assured Equipment Grounding Conductor Program per the National Electric Code (NEC). Per the Assured Equipment Grounding Conductor Program, the NEC calls for all cordsets to be verified for ground continuity and correct wiring on a 3 month basis.
  5. A neutral conductor MUST NOT be connected to the refrigeration units. All Carrier Transicold refrigeration units are balanced three phase systems; therefore, the unit only requires three phase wires and a ground conductor.
  6. Standby power cordsets between the circuit breaker and the refrigeration unit MUST be constructed from 10/4 SOOW cable. Carrier recommends a minimum cable length of 50 feet to limit maximum fault currents and prevent damage to the power circuits within the unit.

CUSTOMER CABLE AND PLUG ASSEMBLY

PARTIAL LOWER
ROADSIDE VIEW
STANDBY PLUG MOUNTING

WARNING:
BE SURE POWER IS DIS-CONNECTED TO CUSTOMER CABLE.
READ ENTIRE SUPPLIER DIRECTIONS SUPPLIED WITH PLUG BEFORE STARTING INSTALLATION.

BOTTOM PANEL INSTALLATION

NOTES:

  1. INSTALL (3) MOUNTING ANGLES (ITEM #80), WITH RIVNUTED FLANGE DOWN. TO FRAME USING SUPPLIED SCREWS (ITEM #75).
    TORQUE SCREW TO 96 IN-LBS, KEEPING THE BOTTOM OF THE ANGLES FLUSH AND PARALLEL TO THE BOTTOM OF THE FRAME.

  2. SLIDE (5) OPENINGS IN THE BOTTOM PANEL OVER THE (5) REAR MOUNTING ANGLES ON THE FRAME AND SECURE BOTTOM PANEL
    TO OTHER (5) MOUNTING ANGLES USING SUPPLIED SCREWS (ITEM #75). TORQUE SCREWS SECURELY TO 96 IN-LBS.

FAQ

Q: Where can I find the pre-delivery inspection and warranty registration documents?
A: The documents are shipped with the unit and located in the fuel tank and unit install kits.

Q: What is the weight of the VECTOR 8811MT reefer unit?
A: The weight of the unit (wet, less battery) is 1925 lbs [873 kg].

Q: What is the maximum weight of the battery for this unit?
A: The maximum weight of the battery is 80 lbs [36 kg].

Carrier Transicold Division
Carrier Corporation
P.O. Box 4805
Syracuse, New
York 13221

THIS DOCUMENT AND THE INFORMATION CONTAINED THEREIN IS PROPRIETARY TO CARRIER CORPORATION AND SHALL NOT BE USED OR DISCLOSED TO OTHERS, IN WHOLE OR IN PART, WITHOUT THE WRITTEN AUTHORIZATION OF CARRIER CORPORATION.

SUBMISSION OF THESE DRAWINGS OR DOCUMENTS DOES NOT CONSTITUTE PART PERFORMANCE OR ACCEPTANCE OF CONTRACT

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals