AIPHONE TW-MKL L-Bolt Mounting Kit Instructions
- July 29, 2024
- AIPHONE
Table of Contents
AIPHONE TW-MKL L-Bolt Mounting Kit
Product Information
Specifications:
- Product Name: TW-MKL L-Bracket Mounting Kit
- Contents:
- Four L-Bolts
- Eight 3/4 Hex Nuts
- Eight 3/4 Washers
- One Printed Template
- Recommended Template Material: Wood between 1/2 and 1 inch thick
- Foundation Diameter: At least 2 feet
- Foundation Depth: 3 feet
Product Usage Instructions
Preparing for Installation:
Transfer the provided template to a piece of wood between 1/2 and 1 inch
thick for easier positioning of L-bolts.
Running Conduits:
Run intercom and electrical wire conduits through the foundation into the
4-inch diameter hole at the center of the tower base module. Ensure separate
cable runs in compliance with electrical codes.
Pouring the Foundation:
Pour the foundation at least 2 feet in diameter and 3 feet deep,
considering local building codes and frost line requirements.
Installing the L-Bolts:
- Install the 4 L-bolts below grade with 5 projecting above grade using the template for proper positioning.
- Once foundation sets, remove the template.
- Install one 3/4 hex nut and washer on each L-bolt 2 to 2-1/2 inches above grade to allow a 1/2 inch air gap between foundation and tower base for airflow and moisture prevention.
- Ensure nuts are level.
Frequently Asked Questions (FAQ):
-
Q: Can the L-bolts be installed directly into the concrete without using the template?
A: It is recommended to use the provided template for accurate positioning of the L-bolts within the concrete foundation to ensure proper installation. -
Q: What is the purpose of the 1/2 inch air gap between the foundation and tower base?
A: The air gap allows for airflow and helps prevent moisture-related issues by providing space for ventilation.
Introduction
These instructions cover installing the TW-MKL kit into a concrete base, as well as steps to prepare for installing the aluminum tower and intercom.
Kit Contents
TW-MKL L-Bracket Mounting Kit Contents:
- Four L-Bolts
- Eight 3/4″ Hex Nuts
- Eight 3/4″ Washers
- One Printed Template
It is recommended to transfer the provided template to a piece of wood between 1/2″ and 1″ thick. This will make it easier to properly position the L-bolts into the poured concrete foundation.
TW-MKL Installation
Intercom and electrical wire conduits should be run through the foundation and into the 4″ diameter hole at the center of the tower base module. These cable runs must be run separately, not in the same conduit. It is the responsibility of the installer to ensure that all applicable electrical codes are met.
Pour the foundation at least 2 feet in diameter and 3 feet deep, being sure to account for local building codes and the frost line.
Install the 4 L-bolts below the grade with 5″ projecting above the grade (see drawing below). Use the template to properly position the L-bolts within the concrete foundation.
Once the foundation has set, remove the template. Install one 3/4″ hex nut and one washer on each L-bolt 2 to 2-1/2″ above grade to the top of the washer. This will allow for a 1/2″ air gap between the foundation and tower base to allow airflow and prevent moisture problems. Verify that the nuts are level.
For more details about the features and information above, please contact
Technical Support.
0724 Aiphone Corporation
www.aiphone.com
800-692-0200
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>