MENNEKES 7.4 kW C2 Amtron Compact User Guide

July 26, 2024
MENNEKES

MENNEKES 7.4 kW C2 Amtron Compact

Specifications

  • Manufacturer: MENNEKES Elektrotechnik GmbH & Co. KG
  • Address: Aloys-Mennekes-Str. 1, 57399 Kirchhundem, GERMANY
  • Phone: +49 2723 41-1
  • Website: MENNEKES.com

Product Usage Instructions

Installation

Compliance with national regulations is required for the selection, installation, and inspection of the electric installation of the product. Refer to standards such as IEC 60364-7-722 (DIN VDE 0100-722) and IEC 61851.

Wallbox Mounting

  1. Install the wallbox according to the provided instructions.
  2. Ensure the wallbox is mounted securely.
  3. Check the ambient conditions to ensure safe operation.

System Overview

  • Wallbox / 7.4 kW: MCB max. 40 A (C-Char.), RCD type A 30 mA
  • Wallbox / 11 kW: MCB max. 20 A (C-Char.), RCD type A 30 mA
  • Wallbox / 22 kW: MCB max. 40 A (C-Char.), RCD type A 30 mA

Select Cable Entry Point

Choose the appropriate cable entry point based on the provided options and specifications.

Connect Power Supply

Make the necessary connections for the power supply, ensuring proper voltage and torque settings.

Connect Shunt Release 1 (Optional)

If required, connect shunt release 1 following the provided instructions.

Quick Guide for the Qualified Electrician

AMTRON® 4You 100 7,4

https://mennek.es/products/?part_no=1311207205&source=manual&fl=en

AMTRON® 4You 100 11 / AMTRON® 4You 100 22

https://mennek.es/products/?part_no=1311202205&source=manual&fl=en

Click the link above or scan the QR code to download and read the complete manual.
The tasks described in this quick guide may only be carried out by a qualified electrician.
EU declaration of conformity – The complete EU declaration of conformity can be found on our website in the download section for the selected product.

Always disconnect the product from the power supply during installation, maintenance, and repairs and secure it against reconnection. Do not use a damaged product. – Danger to life due to electric shock

How to video

Installation

Compliance with the national regulations is required for the selection, installation, and inspection of the electric installation of the product (e.g. IEC 60364). Standards to be observed: IEC 60364-7-722 (DIN VDE 0100-722), IEC 61851

  • Danger
  • Material damage
  • Ambient conditions
  1. Install the wall box

  2. System Overview

  3. Select cable entry point

  4. Connect power supply

  5. Connect shunt release

  6. Connect downgrade input 1 (optional)

  7. Connect enable input 1 (optional)

Configuration

The basic settings can be made via DIP switches at the charging station. The configuration tool and the configuration lead are required for advanced settings. Note the labels on the DIP switches (S1, S2) on the housing. Changes made via the DIP switches only take effect after a restart.

  1. DIP switch, bank S1
  2. DIP switch, bank S2
  3. Close wall box
  4. Attach front cover
  5. Detach front cover

FAQ

Q: Who should perform the tasks mentioned in the quick guide?

A: The tasks described in this quick guide should only be carried out by a qualified electrician.

Q: Where can I find the complete EU declaration of conformity?

A: The complete EU declaration of conformity can be found on the manufacturer’s website in the download section for the selected product.

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals