Carrier 30 Series Hot Gas Bypass Accessory Installation Guide
- July 9, 2024
- Carrier
Table of Contents
Carrier 30 Series Hot Gas Bypass Accessory
Product Information
Specifications
- Model: 30RC 010-060 30MPA, MPW 017-080 Hot Gas Bypass Accessory
- Part Numbers: 30MP70000301 and 30RC70006201
- Refrigerant: R-32 (A2L refrigerant with low GWP)
- Safety Measures: Refer to UL 60355-2-40 for comprehensive guidelines
Product Usage Instructions
Safety Considerations
- Installation and servicing of this air-conditioning equipment should only be done by trained and qualified personnel. Basic maintenance tasks can be performed by untrained personnel such ascleaning coils and filters.
- When working on the equipment, always observe safety precautions mentioned in the literature, tags, and labels attached to the unit.
- Follow all local building codes and national electrical codes. Wear safety glasses, work gloves, and use a quenching cloth for unbrazing operations. Have a fire extinguisher available for brazing operations.
Installation Instructions
- Shut off electrical power to the unit before starting any installation or service.
- Recover refrigerant to relieve pressure from the system using both high-pressure and low-pressure ports.
- Displace any traces of vapor with nitrogen and ensure good ventilation in the work area.
- Cut component connection tubing with a tubing cutter, remove the component, and catch any oil that may come out.
- Un-sweat remaining tubing stubs carefully when necessary.
Electrical Safety
Always shut off all power to the equipment during installation and service
to prevent electrical shock. Tag all disconnect locations to prevent
accidental power restoration.
Chemical Exposure Warning
This product contains chemicals including lead that are known to cause
cancer and birth defects. Refer to
www.P65Warnings.ca.gov for more information.
FAQ
-
Q: Can untrained personnel perform all maintenance tasks on this equipment?
A: Untrained personnel can perform basic maintenance functions like cleaning coils and filters, but all other operations should be done by trained service personnel. -
Q: What refrigerant is used in this equipment?
A: This equipment is equipped with R-32, an A2L refrigerant with low GWP.
Installation Instructions
Part No: 30MP70000301 and 30RC70006201
SAFETY CONSIDERATIONS
Installation and servicing of air-conditioning equipment can be hazardous due
to system pressure and electrical components. Only trained and qualified
service personnel should install, repair, or service air-conditioning
equipment.
Untrained personnel can perform basic maintenance functions of cleaning coils
and filters and replacing filters. All other operations should be performed by
trained service personnel. When working on air-conditioning equipment, observe
precautions in the literature, tags and labels attached to the unit, and other
safety precautions that may apply.
Follow all local building codes and appropriate national electrical codes (in
USA, ANSI/NFPA 70, National Electrical Code (NEC); in Canada, CSA C22.1) for
special requirements. Wear safety glasses and work gloves. Use quenching cloth
for unbrazing operations. Have fire extinguisher available for all brazing
operations.
It is important to recognize safety information. This is the safety alert
symbol . When you see this symbol on the unit and in instructions or manuals,
be alert to the potential for personal injury.
Understand the signal words DANGER, WARNING, CAUTION, and NOTE. These words
are used with the safety-alert symbol. DANGER identifies the most serious
hazards which will result in severe personal injury or death. WARNING
signifies hazard s which could result in personal injury or death. CAUTION is
used to identify unsafe practices, which may result in minor personal injury
or product and property damage. NOTE is used to highlight suggestions which
will result in enhanced installation, reliability, or operation.
WARNING
DO NOT USE TORCH to remove any component. System contains oil and refrigerant
under pressure.
To remove a component, wear protective gloves and goggles and proceed as
follows:
- Shut off electrical power to unit.
- Recover refrigerant to relieve all pressure from system using both high-pressure and low pressure ports.
- Traces of vapor should be displaced with nitrogen and the work area should be well ventilated. Refrigerant in contact with an open flame produces toxic gases.
- Cut component connection tubing with tubing cutter and remove component from unit. Use a pan to catch any oil that may come out of the lines and as a gauge for how much oil to add to the system.
- Carefully un-sweat remaining tubing stubs when necessary. Oil can ignite when exposed to torch flame.
- Failure to follow these procedures may result in personal injury or death.
WARNING
Electrical shock can cause personal injury and death. Shut off all power to
this equipment during installation and service. There may be more than one
disconnect switch. Tag all disconnect locations to alert others not to restore
power until work is completed.
WARNING
This product can expose you to chemicals including lead and lead components,
which are known to the State of California to cause cancer and birth defects
or other reproductive harm. For more information, go to
www.P65Warnings.ca.gov.
A2L Refrigerant Safety Measures
The chillers covered in these instructions are equipped with R-32, an A2L
refrigerant with a low GWP (global warming potential). Additional measures are
required for units installed with R-32 to ensure safe installation, start-up,
and servicing of the air-cooled chiller. Refer to UL 60355-2-40 for
comprehensive guidelines beyond the following sections.
QUALIFICATION OF WORKERS
Qualified installers and service technicians are required to have been trained
on the following topics when installing and servicing air-conditioning
equipment with A2L refrigerant such as R-32:
- Explosive potential of A2L refrigerants.
- Potential ignition sources.
- Safety measures for unventilated and ventilated rooms or enclosures.
- Refrigerant detectors.
- Concept of sealed components and sealed enclosures according to IEC 60079-15:2010.
- Correct work procedures for the following:
- Commissioning
- Maintenance
- Repair
- Decommissioning
- Disposal
Reference UL 60335-2-40 Annex HH for complete guidelines for qualifications.
SAFETY CHECKS
Prior to beginning work on air-conditioning equipment containing A2L refrigerants, safety checks are necessary to ensure that the risk of ignition is minimized. For repair to the air-conditioning equipment, the following must be completed prior to conducting work on the system:
- Work shall be undertaken under a controlled procedure to minimize the risk of a flammable gas or vapor being present while the work is being performed.
- All maintenance staff and others working in the local area shall be instructed on the nature of work being carried out. Work in confined spaces shall be avoided.
- The area shall be checked with an appropriate refrigerant detector prior to and during work to ensure the technician is aware of potentially toxic or flammable atmospheres. Ensure that the leak detection equipment being used is suitable for use with all applicable refrigerants.
- If any hot work is to be conducted on the refrigerating equipment or any associated parts, then appropriate fire extinguishing equipment shall be available to hand. Have a dry powder or CO2 fire extinguisher adjacent to the charging area.
- No person carrying out work in relation to refrigerating equipment that involves exposing any pipe work shall use any sources of ignition in such a manner that it may lead t o the risk of fire or explosion. All possible ignition sources, including cigarette smoking, should be kept sufficiently far away from the site of installation, repairing, removal, and disposal, during which refrigerant can possibly be released to the surrounding space. Prior to work taking place, the area around the equipment is to be surveyed to make sure that there are no flammable hazards or ignition risks. “No Smoking” signs shall be displayed.
- Where electrical components are being changed, they shall be fit for the purpose and to the correct specification. At all times, the manufacturer’s maintenance and service guidelines shall be followed. If in doubt, consult the manufacturer’s technical department for assistance.
- The following checks to the air-conditioning equipment shall also apply when using A2L refrigerants:
- The chilled water circuit shall be checked for the presence of A2L refrigerant via the vent, drain, or pipe plug ports at the inlet and outlet water piping connections.
- Markings to the equipment shall continue to be visible and legible. Markings and signs that are illegible shall be corrected.
- Refrigerating pipe or components are installed in a position where they are unlikely to be exposed to any substance that may corrode refrigerant-containing components, unless the components are constructed of materials that are inherently resistant to being corroded or are suitably protected against being corroded.
- Upon completing equipment work, check that cabling will not be subject to wear, corrosion, excessive pressure, vibration, sharp edges, or any other adverse environmental effects. The check shall also take into account the effects of aging or continual vibration from sources such as compressors or fans.
COMPONENT REPAIR
During repairs to sealed components, all electrical supplies shall be
disconnected from the equipment being worked up prior to any removal of sealed
covers, etc. If it is absolutely necessary to have an electrical supply to
equipment during ser-vicing, then a permanently operating form of leak
detection shall be located at the most critical point to warn of a potentially
hazardous situation.
Particular attention shall be paid to the following to ensure that, by working
on electrical components, the casing is not altered in such a way that the
level of protection is affected:
- Ensure that the apparatus is mounted securely.
- Ensure that seals or sealing materials have not degraded to the point that they no longer serve the purpose of preventing the ingress of flammable atmospheres. Replacement parts shall be in accordance with the manufacturer’s specifications.
This shall include damage to cables, excessive number o f connections,
terminals not made to original specification, damage to seals, incorrect
fitting of glands, etc.
Do not apply any permanent inductive or capacitance loads to the circuit
without ensuring that this will not exceed the permissible voltage and current
permitted for the equipment in use.
Intrinsically safe components are the only types that can be worked on while
live in the presence of a flammable atmosphere. The test apparatus shall be at
the correct rating.
Replace components only with parts specified by the manufacturer. Other parts
may result in the ignition of refrigerant in the atmosphere from a leak.
NOTE: The use of silicon sealant can inhibit the effectiveness of some
types of leak detection equipment. Intrinsically safe components do not have
to be isolated prior to working on them.
Guidelines for A2L refrigerant detection, evacuation, charging procedures, and
proper recovery equipment are presented in the Service section.
GENERAL
This control accessory reduces 30RC, 30MPA and 30MPW chiller capacities below
the standard lowest capacity step. This capacity reduction provides more
precise control of leaving fluid temperature during light load conditions.
Examine the components for the correct part numbers. If the components are
damaged, file a claim with the shipping company and notify your Carrier
representative.
IMPORTANT: The hot gas bypass (HGBP) accessory cannot be used on units with the digital scroll compressor option. The hot gas bypass accessory also cannot be used on 30MPA, 30MPW, or 30RC units with the medium temperature brine option.
The hot gas bypass (HGBP) valve accessory limits the amount of refrigerant which can be bypassed from the condenser without impacting oil return. See Fig. 1. See Table 1 for hot gas bypas s accessory kit contents.
Table 1 — Accessory Package Contents
ACCESSORY KIT NO. | PART NO. | QTY | DESCRIPTION |
---|
30MP70000301 (30MP)
| EA52DS422| 1| Hot Gas Bypass Valve
EF23VS184| 1| Solenoid Valve
EF19XS016| 1| Solenoid Coil
2004837138| 1| Bracket (31, 51-80)
KA66AA155| 1| Suction Pipe Clamp
KA66TA155| 2| 1/2 in. Tube Clamp
AL56ZA003| 7| Screw
30-4ASI| 1| Instructions
30RC70006201 (30RC)
| EA52DS422| 1| Hot Gas Bypass Valve
EF23VS184| 1| Solenoid Valve
2005209889| 1| Hot Gas Bypass Line Bracket (10-30T)
2004519966| 1| Equalizer Line Bracket (25-30T)
2006019202| 1| Equalizer Line Bracket (20T)
2005483725| 1| Hot Gas Bypass Line Bracket (40-60T)
2004553158| 1| Equalizer Line Bracket (35T)
EF19XS016| 1| Solenoid Coil
CEPL130567-02| 1| Auxiliary Board
30RCHSCSLX-A00| 1| Auxiliary Hot Gas Bypass Wire Harness (10-30T)
30RCHSCALXCA00| 1| Auxiliary Power Standard Wire Harness (10-30T)
30RCHSCALXCA10| 1| Auxiliary Power Greenspeed® Wire Harness (10-30T)
30RCHSCALXCA20| 1| Auxiliary Power Standard Wire Harness (35-60T)
30RCHSCALXCA30| 1| Auxiliary Power Greenspeed® Wire Harness (35-60T)
KA66AA024| 1| 1/4 in. Tube Clamp
KA66AA155| 2| Suction Pipe Clamp
KA66AA138| 2| Suction Pipe Clamp
KA66FB050| 1| 1/2 in. Tube Clamp
AL56ZA003| 6| Screw
30-4ASI| 1| Instructions
38APMSCLCA-A00| 1| Auxiliary Board Mounting Bracket
KA56MC085| 4| Standoff HEX 6-32
AU27AS081| 4| No.6 Star-Tooth Lock Washer
AC41AB100| 6| 8-32 x .380″ L Screw
INSTALLATION
Install the HGBP Valve and Solenoid Valve
-
Remove the refrigerant charge from the circuit using an approved refrigerant recovery device before proceeding with this installation.
-
Locate the factory-supplied stub between the expansion device and cooler and the discharge stub on the discharge line. Locate the stub for the equalizer line on the suction line. It is needed for controlling the HGBP (Hot Gas Bypass) valve. See Fig. 2 and 3 for 30RC units and Fig. 4-6 for 30MP units.
-
Cut the closed stubs on the discharge and cooler inlet. Prior to brazing both the hot gas bypass valve and solenoid valve, be sure to provide overheating protection to the devices by wrapping in a wet rag. Install a 1/2 in. copper line as shown in Fig. 2 and 3 for 30RC units and Fig. 4-6 for 30MP units. Connect the HGBP valve outlet to the stub between the expansion device and cooler with 1/2 in. copper tubing. Connect 4 to 6 in. of 1/2 in. OD copper tube to the HGBP valve inlet and then connect the solenoid valve to the end of that piping. In between the solenoid valve and the discharge stub, install the amount of 1/2 in. OD copper tube and 1/2 in. OD copper elbows necessary to connect the valve and stub together. The refrigerant flow will come from the discharge stub and into the stub between the expansion device and cooler. See Fig. 2 and 3 for 30RC units and Fig. 4 and 5 for 30MP units.
IMPORTANT: For 30MP033 units, the minimum load valv e piping must only be connected to refrigerant circuit A. The only discharge and liquid stubs available for connection are located on circuit A. Do not connect the minimum load valve piping at any other location.
IMPORTANT: The HGBP valve (hot gas bypass) and solenoid valve are direction specific and must have their arrows (printed on valves) pointing toward the cooler. -
30RC Units: Connect the HGBP valve equalizer line to the stub on the suction line. Cut the line and install the 1/4 in. copper coupling to create a through connection. Use this open connection to connect the equalizer line using 1/4 in. OD copper tubing. See Fig. 2,3,7, and 8.
Connect the sheet metal bracket to the suction and equalizer piping using the clamps and screws provided. See Fig. 2 and 3.
30MP Units: Connect the HGBP valve equalizer line to th e tube stub in the suction line. See Fig. 4 and 5. -
When piping is completed, leak test the assembly. Then evacuate, dehydrate, and recharge the circuit using approved refrigeration practices. Be sure to use the correct type and amount of refrigerant listed in the nameplate data and base unit documentation. See Fig. 9.
Install Control Wiring
30RC
- Install solenoid coil in locations shown in Fig. 2-8.
- Install the AUX (auxiliary) board using the standoffs and screws provided. The auxiliary board is located on left wall of the control panel on 30RC010-030 units. For 30RC035-060 units the AUX board is located on the left of the center section of the control panel. See Fig. 10 and 11.
- Use supplied harness to connect board power and board communication cables. Select correct harness from parts list depending on if unit has Greenspeed® option. Rout e HGBP end of cable to HGBP solenoid. Refer to Fig. 9.
- Address board per wiring in Fig. 12.
30MPA, 30MPW
- Install solenoid coil in location shown in Fig. 5.
- Locate the violet and brown wires labeled HGBP in the unit control panel. See Fig. 13.
- Cut off the capped ends, strip the wires back 1/2 in., and wire the solenoid coil to the HGBP terminals. See Fig. 13.
Configure Unit for Minimum Load Control
The control must be configured for the minimum load control operation. Use the
PIC6 controller display to configure the system.
- Set the Enable/Off/Remote switch to OFF position.
- Log into controller at Factory Level. See Installation an d Troubleshooting manual for details.
- From the Home menu, navigate to Factory Parameters menu.
- Configure Hot Gas Bypass Selection →hgbp_sel→Yes. Press the Save icon at the bottom left of the screen. Allo w the controller to reboot.
- After reboot, go back to the confirmation screen and verify the section has changed. The controller is not configured for HGBP operation.
Test Minimum Load Relay Output
Chiller must be in the local OFF mode to use Quick Test. From the Home menu
navigate to the Quick Test menu. Enable the quick test function at the top of
the screen. Scroll down to the HGBP feature and enable it. This will open the
HGBP solenoid valve. Verify it is energized/open by the clicking sound or a
sensor to detect energized solenoids. Once verification is complete, disable
quick test.
Once the outputs have been tested, the installation is complete.
Hot Gas Bypass (HGBP) Valve Operation
The HGBP valve responds to changes in suction pressure. Refer to Fig. 1. When
the evaporating pressure is above the valve setting, the valve remains closed.
As the suction pressure drops below the valve setting, the valve responds and
begins to open. The valve opens in proportion to the change in suction
pressure. As the suction pressure continues to drop, the valve continues to
open until the limit of the valve stroke is reached.
In typical applications, the pressure change is not sufficient t o open the
valve to the limit of the stroke. The amount of pressure change required to
move the valve from the point at which it is closed to the point at which it
is considered open varies widely depending on the evaporator temperature. For
this reason, HGBP capacity reduction is a function of allowable evaporator
temperature change from closed position to the opening setting, which for most
applications is a 6°F (3.3°C) change in evaporator temperature.
Hot Gas Bypass (HGBP) Adjustment
The HGBP valve utilizes a spring assembly which can be fixed at the desired
pressure setting (opening pressure). This setting will not be affected by
other factors such as ambient temperature or hot gas temperature. The HGBP
valve has an adjustment range of 95 to 115 psig (655 to 793 kPa). The standard
factory setting for this valve is 105 psig (724 kPa).
© 2024 Carrier
Manufacturer reserves the right to discontinue or change at any time,
specifications or designs without notice and without incurring obligations.
Catalog No. 04-53300262-01
Printed in U.S.A.
Form No. 30-4ASI
Replaces: 30-34SI