GLETON GLF2419-1 Pull Out Faucet Instruction Manual

June 28, 2024
GLETON

GLETON GLF2419-1 Pull Out Faucet

Please install correctly according to the contents of this instruction manual.

Condition for use

  • a Water pressure range for hot/cold water Min 0.05MPa-Max 0.75MPa.
  • b. Water temperature 70°C, Do Not use steam for hot water
  • c. It might deform or crack due to freezing when the ambient temperature is under O’C, so please use it above 0°C

Maintenance and Use Precautions

  • a. Please use the faucet in a gentle way for long-term durability
  • b. Please unscrew and clean the aerator when the spout is blocked.
  • c. Do Not use nylon or detergent like cleanser and polishing powder that contains coarse particles to do the cleaning.
  • d. Do Not use any acid detergent to avoid corroding the plating, please wash well the ceramic around the product when cleaning with acid detergent.
  • e. Please use a cloth dipped in a neutral detergent diluted properly to do the cleaning when the product is dirty and then wipe it clean with a dry soft cloth.
  • f. The plating surface of the product will be tarnished when it’s attached with any cosmetic or detergent, please wash wel I and wipe it with a dry soft cloth.
  • g. Please take necessary warming measures to your household water supply equipment when it’s under 0°C. Do Not use the switch handle when the product is frozen, unfreeze it with hot water before you use it
  • h. Free replacement or compensation will not apply for any product damage property loss and body inquiry due to non-compliance to the instruction terms

Instruction for Use

  1. Water flow rate adjustment
  2. Turn the handle toward left. water flow rate increases.
  3. Turn the handle toward the faucet, water flow decreases.
  4. Water temperature adjustment.
  5. Turn the handle frontward for hot water
    Turn the handle backward for cold water

Installation Instruction

  1. Make sure to clean the pipes to avoid blocking before installation

  2. Please note that the hole for installation must be (j)35mm. See the illustration on the right.

  3. Make sure to clean the dirt around the hole before installation,

  4. Be cautious to protect the product surface from scratching during unpacking and installation. Do Not twist the product with pipe wrench with full force.

  5. Shut off the water supply. Remove the old faucet. Clean the mounting surface. Thread the faucet through the hole and install it on the countertop.

  6. Install the mounting hardwares (B-E) in sequence according to the figure below, and fix the faucet on the countertop.

  7. Assemble the digital display component according to the figure below.

  8. Assemble the gravity hammer to the pull cord as shown in the figure below Its height is preferably one-third of the height of the end.

  9. Connect the hot and cold water pipes to the water suppliers separately, please pay attention to distinguish the hot and cold water suppliers.

  10. Turn on angle stops, turn the faucet on and check for leaks.
    (DO NOT TURN FAUCET ON BEFORE THE INSTALLATION IS COMPLETE)
    More Details on www.gleton.com

Documents / Resources

| GLETON GLF2419-1 Pull Out Faucet [pdf] Instruction Manual
GLF2419-1 Pull Out Faucet, GLF2419-1, Pull Out Faucet, Out Faucet, Faucet
---|---

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

GLETON User Manuals

Related Manuals