Solplanet Ai-LB 10K Pro 10 kWh Low Voltage Battery Installation Guide

June 26, 2024
solplanet

Solplanet Ai-LB 10K Pro 10 kWh Low Voltage Battery

Specifications

  • Product: Ai-LB Pro battery energy storage system (BESS)
  • Model: Ai-LB 10K Pro
  • Manufacturer: Solplanet
  • Document Version: UM0046_Ai-LB 10K Pro_EN_V02_0524

Product Information

This document provides detailed instructions for mounting, installation, commissioning, configuration, operation, troubleshooting, and decommissioning of the Ai-LB Pro battery energy storage system (BESS). It is essential to follow these instructions carefully to ensure safe and optimal usage of the product.

About this document:

The document is intended for qualified persons with knowledge of  battery operation, inverter operation, electrical device installation, and relevant laws, standards, and directives. Failure to adhere to the instructions may void the manufacturer’s warranty.

Safety Guidelines:

  • The product is not suitable for powering life-sustaining medical devices.
  • Ensure that power outages from the battery system do not lead to personal injury.
  • Use the product only in countries approved by Solplanet.
  • Follow the information in this documentation and local standards to prevent injury or property damage.

Product Usage Instructions

Commissioning:

Before commissioning, inspect the system as described in section 7.1 of the user manual.

Installation:

Follow the mounting and installation instructions provided in the manual. Ensure all connections are secure and comply with electrical safety standards.

Configuration:

Configure the Ai-LB Pro system according to the guidelines outlined in the documentation. Pay attention to settings related to battery operation and inverter functionality.

Operation:

Operate the BESS system as per the specified procedures. Monitor performance indicators and address any issues promptly.

Troubleshooting:

Refer to the troubleshooting section of the manual in case of system malfunctions or errors. Follow the recommended steps to identify and resolve issues.

Decommissioning:

When decommissioning the system, follow the instructions provided to safely shut down and disconnect the BESS. Dispose of components according to local regulations.

FAQs

  • Q: Can the Ai-LB Pro system be used to power medical devices?
    • A: No, the product is not suitable for supplying power to life-sustaining medical devices.
  • Q: What should I do in case of a power outage from the battery system?
    • A: Ensure that no personal injury would result from the power outage and take necessary precautions to mitigate risks.
  • Q: How can I ensure compliance with local regulations when using the product?
    • A: Use the product only in countries approved by Solplanet and follow all guidelines provided in the documentation and local standards to prevent any violations.

General information

1.1 About this document
This document describes the mounting, installation, commissioning, configuration, operation, troubleshooting and decommissioning of the Ai-LB Pro battery energy storage system (BESS). You will find the latest version of this document and further information on the BESS in PDF format at www.solplanet.net. It is recommended that this document be readily accessible at all times.
1.2 Product validity
This document is valid for the following models: Ai-LB 10K Pro
1.3 Target group
This document is intended for qualified persons who must perform the tasks exactly as described in this user manual. All installation work must be performed by appropriately trained and qualified persons. Qualified persons must possess the following skills: Knowledge of how batteries work and are operated. Knowledge of how an inverter works and is operated. Training in how to deal with the dangers and risks associated with installing, repairing and using electrical devices and
batteries and installations. Training in the installation and commissioning of electrical devices. Knowledge of all applicable laws, standards and directives. Knowledge of and compliance with this document and all safety information. Not adhering to the prescribed instructions may potentially void the manufacturer’s warranty. If in doubt, please contact the local Solplanet service team.

UM0046_Ai-LB 10K Pro_EN_V02_0524

1

1.4 Symbols DANGER
Indicates a hazardous situation which, if not avoided, will result in death or serious injury.
WARNING
Indicates a hazardous situation which, if not avoided, could result in death or serious injury.
CAUTION
Indicates a hazardous situation which, if not avoided, could result in minor or moderate injury.
NOTICE
Indicates a situation which, if not avoided, can result in property damage.
Information that is important for a specific topic or goal, however not related to safety.

2

UM0046_Ai-LB 10K Pro_EN_V02_0524

Safety

2.1 Intended use
The Ai-LB 10K Pro is a BESS is for both residential and commercial applications and operates with Solplanet hybrid inverters The product is intended for indoor applications. It is a low voltage Li-ion BESS. It can be operated in on-grid, off-grid and backup modes with all officially compatible Solplanet inverters. The product is suitable for indoor and outdoor use. The product must only be used as stationary equipment. Alterations to the product are not allowed unless authorized in writing by Solplanet. Unauthorized alterations will void the guarantee and warranty claims. Solplanet will not be held liable for any damage
caused by such unauthorized alterations. The product is not suitable for supplying power to life-sustaining medical devices. Please ensure that no personal injury would lead due to the power outage of the battery system. The product must only be used in countries for which it is approved for by Solplanet. Use this product only in accordance with the information provided in this documentation and with the locally applicable
standards and directives. Any other application may cause personal injury or property damage. The type label must remain permanently attached to the product. This document does not replace any regional, state, provincial, federal or national laws, regulations or standards that apply
to the installation, electrical safety and use of the product.
2.2 Important safety instructions
The product has been designed and tested strictly according to the international safety requirements. As with all electrical or electronical devices, there are residual risks despite careful construction. To prevent personal injury and property damage and to ensure long-term operation of the product, read this section carefully and observe all safety information at all times.
DANGER
Danger to life due to electric shock where surge protection is not used If there is no surge protection, a voltage surge can be conducted into the building and to other connected devices in the same system through power cables, network cables or other types of cable. Touching live parts and cables may result in death or lethal injury due to electric shock.
Ensure all devices in the same system and the inverter are integrated within an existing surge protection systems/devices. Refer to local installation regulations to determine the requirements for the installation of surge protection devices.

WARNING

Danger to life due to electric shock from destruction of mea- surement devices due to overvoltage
Overvoltage can damage a measurement device and result in voltage being present in the enclosure of the measurement device. Touching the live enclosure of the measuring device results in death or lethal injuries due to electric shock.
Only use measuring devices with a higher voltage range than the system battery voltage.

UM0046_Ai-LB 10K Pro_EN_V02_0524

3

WARNING
Risk of injury due to weight of product Injuries may result if the product is lifted incorrectly or dropped while being transported or mounted.
Lift and transport the product carefully. Wear suitable personal protective equipment, in accordance with local regulations, when working on the product.
NOTICE
Damage to the battery system due to electrostatic discharge Internal components of the battery system can be irreparably damaged by electrostatic discharge.
Ground yourself before touching any component.
2.3 Symbols on the label
Beware of a danger zone This symbol indicates that the product must be additionally grounded if additional grounding or equipotential bonding is required at the installation site.
Beware of high voltage and operating current The product operates at a high voltage and current. Work on the product must only be carried out by skilled and authorized personnel.
WEEE Designation Do not dispose of the product together with household waste. Dispose the product in accordance with local disposal regulations for electronic waste
CE marking The product complies with the requirements of the applicable EU directives.
The battery is recyclable The battery can be recycled by a professional recycling organization, please refer to the relevant local regulations.
Observe the documentation Read and understand all documentation supplied with the product.
ROHS marking The EU material and process standards for electrical and electronic products make them more conducive to human health and environmental protection.
UKCA marking The product complies with the requirements of the applicable UK Product Directive.

4

UM0046_Ai-LB 10K Pro_EN_V02_0524

Unpacking and storage

3.1 Scope of delivery
Check the scope of delivery for completeness and any visible external damage. Contact your supplier if the package is damaged upon delivery or is incomplete or damage.

A

B

C

D

E

F

G

H

I

J

Object A
B
C D E F G H I J

Item Name

Details

Quantity

Battery

Ai-LB 10K Pro

550x165x867 mm

1

21.651×6.50×31.21 in

Power Cable

Positive: orange plug, 35 mm² / 2 AWG, L:1.5 m (59.06 in) to SC50-10
ring terminal. 1 set
Negative: black plug, 35 mm² / 2 AWG, L:1.5 m (59.06 in) to SC50-10
ring terminal

Ground cable yellow & green/L:1 m

Grounding Cable

(39.37in)/ double OT M6

1

Standard network cable black/L:1.5 m

Communication cable

1

(59.06 in)/Double RJ45 Plug

Mounting Plate

1

Expansion Screw

M8*80 mm

4

Screw

M5*16 mm

2

Mounting Positioning

1

Board

RJ45 Water-proof Wiring 3
Terminal

Wifi Stick

EESW-A400-02, 98x23x23 mm

1

Notes
Continuous flow capacity160A

UM0046_Ai-LB 10K Pro_EN_V02_0524

5

3.2 Product storage
Suitable storage is required if the equipment is not installed immediately: Store the battery in the original packing case. The storage temperature must be between -10°C ~ +50°C, and the storage relative humidity must be 5~95% RH, non-
condensing. The storage SOC: 25%~50%. Re-charge the battery every 6 months, to ensure no over-discharge of the battery occurs. The packing with the equipment shall not be tilted or inverted. Place the equipment in a cool place away from direct sunlight. Keep the equipment away from flammable, explosive, and corrosive materials. Keep the equipment away from rain. The product must be fully inspected and tested by authorized personnel before it can be put into operation, if it has been
stored for three or more months.

6

UM0046_Ai-LB 10K Pro_EN_V02_0524

Product overview

4.1 Dimensions

Unitmm

4.2 Interfaces and functions

UM0046_Ai-LB 10K Pro_EN_V02_0524

7

The product is equipped with the following interfaces and functions:

Number

Name

Details

Notes

1

Power Switch

Red LED: ALARM, Blue LED: RUN

2

INVERTER

RJ45

CAN communication to the inverter

3

LINK IN

RJ45

Internal RS485 communication between batteries

4

LINK OUT

5

Port Negative x2

6

Port Positive x2

7

GND

RJ45 PSR8XAB PSR8XBB
M6

Internal RS485 communication between batteries
Black cable 35 mm² / 2 AWG, cable plug model: PSRP8XA50, Manufacturer: GENERAL(Suzhou) CO., Ltd. Red cable 35 mm² / 2 AWG, cable plug model: PSRP8XB50, Manufacturer: GENERAL(Suzhou) CO., Ltd.
Yellow-Green, 10 AWG

8

Venting Valve

9

WIFI Socket

For WIFI stick

10

125A DC Breaker

11

Reset Point

In case of severe undervoltage, wake up the battery

RJ45 Port Pin Definition

View

Item Description

1

2

3

4

5

6

7

8

2

INVERTER

RS485A

RS485B

CAN-H

CAN-L

GND

3

LINK IN

4

LINK OUT

WiFi Socket port description Side View

BMS- BMS-

RS485- RS485- DI+

A

B

DI-

NC

BMS- BMSCAN-H CAN-L

BMS- BMS-

RS485- RS485- DO+

DO-

A

B

NC

BMS- BMSCAN-H CAN-L

Description

Use Wifi stick for remote software update.
Please contact Solplanet after-sales service department to implement specific operations.

8

UM0046_Ai-LB 10K Pro_EN_V02_0524

4.3 Basic system solution
The photovoltaic energy storge power generation system is composed of the following parts.

UM0046_Ai-LB 10K Pro_EN_V02_0524

9

Mounting

5.1 Requirements for mounting
5.1.1 Requirements for Installation Location
DANGER
Danger to life due to fire or explosion Despite careful construction, electrical devices can cause fires. This can result in death or serious injury. Do not mount the product in areas containing highly flammable materials or gases. Do not mount the inverter in areas where there is a risk of explosion.
A solid support surface must be available (e.g., concrete or masonry). The mounting location must be inaccessible to children. The installation location must be suitable for the weight and dimensions of the BESS. Keep away from conductive (metal) dust. Keep away from water sources, heat sources and inflammable and explosive articles. The installation location must not be close to fire. The product should be mounted such that the LED indicators can be read without difficulty. The circuit breaker of the BESS must always be freely accessible. The altitude of the installation location should be less than 3000 m. The charging temperature should be between -5°C ~ +55°C. The discharging temperature should be between -15°C ~
+55°C. The ambient humidity should be 5~95% RH, noncondensing. The mounting location must not be permanently exposed to direct sunlight . If the product is exposed to direct sunlight,
the exterior components may age prematurely and overheating might occur. When becoming too hot, the BESS reduces its power output to avoid overheating, and will lead to reduced lifetime.

10

UM0046_Ai-LB 10K Pro_EN_V02_0524

UM0046_Ai-LB 10K Pro_EN_V02_0524

11

5.1.2 Tools
Phillips-screwdriver Specification: M5/M6

Marker pen

Phillips Screwdriver Bit Specification: M5 / M6

Wrench

Torque wrench Specification: M8

Twist drill(12mm)

Level

Heat Gun

Electric Drill

Network Cable Crimping Tool

Wire Stripper

Crimping Pliers

Scissor

Hammer

Tape measure

5.1.3 Safety gear

Wear the following safety gear when working on the BESS. Adhere to local occupational health and safety standards.

12

UM0046_Ai-LB 10K Pro_EN_V02_0524

Insulated gloves

Safety goggles

Safety shoes

5.2 Mounting
Step 1 Measure the mounting space (position a cardboard the same size as the battery). Mark the fixed position with the “Mounting Locating Plate(H)”.

Step 2 Use an impact electric drill to drill holes in the concrete or stone (fireproof) wall, the drilling depth is between 80mm and 85mm: The drill diameter is 12 mm.

UM0046_Ai-LB 10K Pro_EN_V02_0524

13

Step 3 1 Tighten the “Expansion Bolt(F)” slightly and put it into the hole. Knock the expansion bolt with a rubber hammer until all the expansion plugs enter into the hole. 2 Screw out the bolts and remove the spring washer and flat washer.
Step 4 Fix the “Back Plate (E)” to the wall.

Step 5 Hang the battery on the bracket according to the picture below.

14

UM0046_Ai-LB 10K Pro_EN_V02_0524

Step 6 Secure the PACK from the side using ” Screws(G)”.

UM0046_Ai-LB 10K Pro_EN_V02_0524

15

Electrical connection

6.1 Requirements for the Electrical connection
6.1.1 Power Cable
Material List (plug components may be purchased separately from supplier).

Plug sub assembly

Cable sealing ring

Procedure
1.Route the cable through the isolation cable sealing ring and Plug protection cover.

2.Remove 13mm of insulation at end of cable.
3.The red plug is used for the positive, and the black is for the negative power cable. The end of the cable is crimped at the terminal using a crimping clamp.

4.Tighten the isolation cap and plug contact.

Plug protection cover Schematic picture

5.Connect the positive and negative plug into the “+” and “” Port of the BESS and tighten.
6.Use isolation cap for unused DC plug.
6.1.2 Communication Cable
Battery to Battery Communication Cable. Pin definition as below, alternatively a standard straight CAT 5 Ethernet cable can be used.

16

UM0046_Ai-LB 10K Pro_EN_V02_0524

Battery to Inverter Communication Cable

6.1.3 Install an isolation device
Install an isolation device (i.e., a circuit breaker) between the inverter and the battery system to run both positive and negative conductor overcurrent protection. The steps for installing isolation devices (i.e., circuit breakers) are as follows: 1. Use E25-16 terminals to connect the wiring harness to the isolation device. 2. Insert the wiring harness terminal into the connection port of the isolation device and distinguish the positive and negative terminals of the isolation device (see the isolation device specifications for details). 3. Tighten the wiring harness terminal with screws to secure it.
During installation, please turn off the battery power switch and check whether the power is off.The cable from the circuit breaker to the inverter is provided by the installation personnel. (Please refer to the Product Packaging List for cable specifications).

UM0046_Ai-LB 10K Pro_EN_V02_0524

17

6.2 Single Unit Connection
NOTICE
Before electrical connection, ensure that the circuit breaker/power switch of the battery and all switches connected to the energy storage are in the OFF state. Otherwise, electric shock may occur. 1. The rated output power of the cable connection is 6 kW; SOC>70% The output power is 8 kW. 2. Install circuit breakers based on local regulations.
6.3 Ground Connection

18

UM0046_Ai-LB 10K Pro_EN_V02_0524

6.4 Communication Connection
Step 1 Route the communications cable through the “RJ45 Water-proof Wiring Terminal(I)”.
Step 2 Connect the communications cable to the RJ45 port (labelled “Inverter”).
Step 3 Tighten the RJ45 cable cover.

UM0046_Ai-LB 10K Pro_EN_V02_0524

19

Step 4 Connect the other end of the communication cable to the inverter.

6.5 Power Cable Connection

6.6 Turn On Battery
Step 1 Turn on the DC isolator on the BESS while the power switch is off. Step 2 Press the “Power Switch” to turn on battery. After five seconds, the blue LED flashes to indicate normal operation. Step 3 Cover with the front cover after checking.

20

UM0046_Ai-LB 10K Pro_EN_V02_0524

State Light
Remarks

Standby

Charge

Discharge

Failure

LED illuminates for LED illuminates for

0.25 S / LED turns off 0.5 S / LED turns off

for 0.75 S

for 0.5 S

Permanently illuminated

Continuous blinking

When the battery starts up, the red and blue lights alternately blink, indicating that the battery self-test is normal

6.7 Shutdown Battery
Step 1 Press the “Power Switch” to shutdown battery. Step 2 Turn off the DC isolator while the power switch is off.

UM0046_Ai-LB 10K Pro_EN_V02_0524

21

6.8 Multi-Unit Connection with Bus-Bars (3-unit example)

Step 1 The method of cable connection with a bus-bar will output a power of 3 x 6 kW =18 kW. Step 2 Max. number of parallel units: 16. Note that the max. recommended charge and discharge power is 96 kW continuous and 130 kW peak respectively. Step 3 Install circuit breakers based on local regulations.
You can also use a 40*4 mm² copper bar with a flow capacity of 500A as the bus bar.

22

UM0046_Ai-LB 10K Pro_EN_V02_0524

6.9 Multi-Unit Connection without Bus-Bars (3-unit example)

Step 1 This wiring method will allow a max. power output of 6 kW continuous, limited by the wiring and connectors. Ensure the connected inverter does not exceed 6 kW/120 A continuous during both charge and discharge.
Step 2 Install circuit breakers based on local regulations.
6.9.1 Ground Connection Please follow step 6.2. 6.9.2 Communication Connection Please follow step 6.3.

UM0046_Ai-LB 10K Pro_EN_V02_0524

23

6.9.3 Power Cable Connection

Parallel cable needs to be purchased extra.
6.9.4 Turn On Battery Bank Please follow step 6.6. Make sure all isolators are turned on before pressing the power switches on all batteries.

24

UM0046_Ai-LB 10K Pro_EN_V02_0524

Commissioning

7.1 Inspection before commissioning
Check the following items before commissioning the BESS: Ensure inverter is compatible with the battery. The official compatibility list can be found at www.solplanet.net Ensure the inverter is correctly mounted as per Solplanet’s guidelines, please refer to the inverter user manual Ensure the battery is properly installed and secured in accordance with this user manual. Ensure the isolator between the battery system and the inverter is off. Ensure the communication cables and DC cables are correctly and securely connected. Ensure the ground terminal on the BESS is grounded. Ensure the DC power cables have been installed with the correct polarity.
7.2 Commissioning procedure
The battery can operate together with Solplanet inverters as default. Monitoring of the battery status is available via the Solplanet App when installed with a Solplanet inverter.If the battery operate together with the other inverters, please contact Solplanet service.
If all the items mentioned above have been met, then proceed as follows to commission and start-up the battery for the first time:
Step 1 Turn the battery isolator while the power switch is off. Step 2Turn on Power Switch to start battery. After five seconds:
If the Power Switch LED blinks blue, it means that the battery enters into working modes. Proceed to step 3. If the Power Switch LED blinks red or is permanently illuminated red, it means that a battery alarm has occured after the system self-check, please stop the commissioning procedure and call the local Solplanet service support for assistance.
Step 3 Start inverter according to the inverter start-up procedure.
Step 4 Commission the inverter according to the inverter commissioning procedure using the Solplanet App.
Step 5 Read the battery status information using the Solplanet App and confirm that the BESS is communicating with the inverter.

UM0046_Ai-LB 10K Pro_EN_V02_0524

25

Decommissioning the product

Procedure
Step 1 Switch off the inverter by first turning off the AC circuit breaker downstream of the AC output of the inverter and second by turning off the inverter DC switch. Step 2Switch off the BESS. Ensure that the Power Switch LED is OFF.
Step 3 Switch off the any external DC switches between the inverter and the BESS if there are any.
Step 4 Remove all cables from the BESS.
Step 5 If the battery system is to be stored or shipped, pack the system using the original packaging or packaging that is suitable for the weight and dimensions of the system. Dispose of the battery system in accordance with the locally applicable battery disposal regulations.

26

UM0046_Ai-LB 10K Pro_EN_V02_0524

9 Technical data

Key Item

Specification

Remark

Rated Capacity

200 Ah

Rated Voltage

51.2 Vdc

Working Voltage Range

44.8-58.4 V

Rated Energy

10.24 kWh

Max. Parallel Quantity
Rated Charging Current
Max. Charging Continuous Current
Rated Discharge Current

Max.16 Sets In Parallel, 163.84 kWh 0.6 C,120 A 0.6 C,120 A 0.6 C,120 A

Max. Discharge Continuous Current
Battery Max. Charge/Discharge Power
Peak Discharge Current / Power

0.6 C,120 A 6.14 kW / 6.14 kW 160 A / 8.19 kW, 1 min

Available SOC Range

0 % ~ 100 %

90 % DOD is recommended.

SOC during transportation Dimensions [WDH] Weight
Operating Temperature1 Storage Temperature2

50 % Width: 550±5mm / 21.65 in, Depth: 165±5mm / 6.50 in, Height: 867±5mm / 31.21 in
~94 kg Charging Temperature-5 °C ~ 55 °C Discharge Temperature-15 °C ~ 55 °C
-10 °C ~ 50 °C

Working Humidity

5~95 %RHNon-Condensing

Altitude3

2000 m

Communication

CAN, RS485, Dry Contact, WiFi

WiFi Stick Option

Certificate Designed Cycle Life
IP Rating

TUV, IEC 62619, IEC62040, IEC61000, UN38.3

6000 Cycles

0.5 C/80 % DOD/80 % SOH/1 Cycle Per Day25 °C±2 °C

IP65

Cooling

Natural Cooling

Environment protection standard

RoHSREACH

1. Recommended operating temperature: 1030°C. 2. Recommended Storage temperature: 1030°C.
3. Recommended working height is less than 2000 m, and the maximum working height is 3000 m.

UM0046_Ai-LB 10K Pro_EN_V02_0524

27

Handling Precautions and Guidelines for Product

These Handling Precautions and Guidelines for Rechargeable Battery System (“Handling Precautions and Guidelines”) shall only apply to the packs manufactured by AISWEI New Energy Technology (Yangzhong) Co., Ltd (hereinafter referred to as “AISWEI”). Customer shall strictly follow these Handling Precautions and Guidelines, and shall alert its customers, contract manufacturers, agents, distributors, service providers and end users of the risks of the packs and shall ensure that Customer’s obligations as specified in the Document as well as the Handling Precautions and Guidelines are, through a printed label on host device, or through Customer’s Quick Installation Guide, or a help file or Customer’s Internet website, contractually imposed on Customer’s own customers and distributors, and by them further down to the end users so that the entire chain is committed to the above obligations and so that the products are properly handled, operated, transported, used and maintained.
Statement (1):
Customer is requested to contact AISWEI in advance, if and when the customer needs other applications or operating conditions than those described in this Document. Additional experimentation may be required to verify performance and safety under such conditions
Statement (2):
AISWEI will take no responsibility for any accident or liabilities in the event the Product is used for applications or under conditions other than those described in this Document.
Use Product under specified charge/discharge conditions.
Do not immerse in water.
Do not heat.
Do not attempt to crush, drop or penetrate the pack.
Do not attempt to have any modification/.
Leave Product in cool places.
Stop using Product with any colour change or mechanical damage detected during assembling, charging, normal operation and storage.
In case of leakage or smells, track to thermal source, remove the thermal source and clean with water.
Do not place or leave the pack and equipment in the reach of children so that they are not able to swallow or mistreat the product. In case of ingestion, consult with a doctor immediately.
Keep leaked electrolyte away from eyes or skin. In case of leakage contact with eyes or skin, immediately clean with water and seek help from a doctor. Serious damages can be caused due to delayed treatment.
Do not put the pack into a fire. Do not use it or leave it in a place near fire, heaters, or high temperature sources. The heat can melt pack insulator and damage safety vent, resulting in overheat, explosion or fire of the pack .
Do not submerge the product in water or wet the product. If the protective devices are damaged, abnormal charging current and voltage may cause a chemical reaction within the product, which may result in overheat, explosion and even fire of the pack.
Do not connect positive (+) and negative (-) terminals of the pack reversely.
Do not short circuit. Do not contact the pack terminals (+ and -) directly with a wire or any metal (like a metal necklace or a hairpin). Otherwise, the pack is short circuited and generates excessive current, which may result in overheat, explosion, or fire of the pack.
Do not throw or drop the pack. Strong impact may damage the protective devices and an abnormal chemical reaction might occur during charge, resulting in overheat, explosion, or fire of the pack.
Do not drive a nail in, hit with a hammer, or stamp on the pack. Otherwise, the pack may be deformed and short circuited, resulting in overheat, explosion, or fire of the pack.
Do not solder the pack directly. Heat applied during soldering may damage the insulator of the safety vent and mechanism, resulting in overheat, explosion, or fire of the pack.
Do not disassemble or alter the pack. The pack employs a safety mechanism and a protection device in order to avoid any danger. If they are damaged, the pack might overheat, explode or catch a fire.
Do not put the pack in a microwave oven or a pressure cooker. Sudden heat may damage the sealing of the pack and may cause overheat, explosion, or fire of the pack.

28

UM0046_Ai-LB 10K Pro_EN_V02_0524

Do not leave the pack in a charger or equipment if it generates an odour and/or heat, changes colour and /or shape, leaks electrolyte, or encounters any other abnormality. In such a case, immediately take the pack out of the charger or equipment and keep it away from fire. Otherwise, the pack might overheat, explode, or catch a fire.
Stop charging or using the battery after battery reaches its lifetime, otherwise, as the PACK might cause heat generation, explosion, or fire.
Do not use the pack beyond specified conditions. Otherwise, the pack might encounter overheat, damage, or performance deterioration.
Read the instructions regarding the installation and operation so as to avoid damages due to incorrect operations.
The pack may have insufficient power capacity after long storage.
Knockoff or counterfeit battery.
Any inconsistency between serial number, model number, and product code.

UM0046_Ai-LB 10K Pro_EN_V02_0524

29

Maintenance

To ensure the long-term running of the energy storage system (hereinafter referred to as “the system”), you are advised to perform the following maintenance operations:

Check content System cleaning

Maintenance method Check whether the appearance of the system is
damaged or deformed. Clean the system.

Maintenance cycle
Once every six months to once a year.

System running state

Check whether there is abnormal sound during the operation of the system.
Check whether indicator LED´s work normally. Check whether the system parameters are
normal. Update software.

Once every six months.

Electrical connection Ground reliability

Check whether the cable connections are loose. Check whether the cables are discolored. Check whether the cable is damaged, especially
whether there is a cut mark on the surface of the cable in contact with metal surfaces.
Check whether the ground cable is grounded reliably.

Half a year after the first commissioning, and once every half a year to a year thereafter.
Half a year after the first commissioning, and once every half a year to a year thereafter.

30

UM0046_Ai-LB 10K Pro_EN_V02_0524

12 Recycling and disposal
Dispose of the packaging and replaced parts according to the rules applicable in the country where the device is installed. Do not dispose the Solplanet BESS with normal domestic waste.

Do not dispose of the product together with the household waste but in accordance with the disposal regulations for electronic waste applicable at the installation site.
13 EU declaration of conformity

Within the scope of the EU directives · Radio Equipment Directive 2014/53/EU (L 153/62-106. May 22. 2014) (RED) · Restriction of the use of certain hazardous substances 2011/65/EU (L 174/88, June 8, 2011) and 2015/863/EU (L 137/10, March 31,2015) (RoHS) AISWEI New Energy Technology (Yangzhong) Co., Ltd. confirms herewith that the products described in this manual are in compliance with the fundamental requirements and other relevant provisions of the above mentioned directives. The entire EU Declaration of Conformity can be found at www.solplanet.net.
14 Service and warranty

If you have any technical problems concerning our products, please contact Solplanet service. We require the following information in order to provide you with the necessary assistance: · Ai-LB Pro battery energy storage system type · Ai-LB Pro battery energy storage system serial number · Ai-LB Pro battery energy storage system battery type · Type and number of connected PV modules · Error code · Mounting location · Installation date · Warranty card
The factory warranty card is enclosed with the package, please keep well the factory warranty card. Warranty terms and conditions can be downloaded at www.solplanet.net, if required. When the customer needs warranty service during the warranty period, the customer must provide a copy of the invoice, factory warranty card, and ensure the electrical label of the machine is legible. If these conditions are not met, Solplanet has the right to refuse to provide with the relevant warranty service.

UM0046_Ai-LB 10K Pro_EN_V02_0524

31

15 Contact
EMEA Service email: service.EMEA@solplanet.net APAC Service email: service.APAC@solplanet.net LATAM Service email: service.LATAM@solplanet.net AISWEI Pty Ltd. Hotline: +61 390 988 674 Add.: Level 40, 140 William Street, Melbourne VIC 3000, Australia AISWEI B.V. Hotline: +31 208 004 844 (Netherlands) +48 134 926 109 (Poland) Add.: Barbara Strozzilaan 101,5e etage, kantoornummer 5.12,1083HN Amsterdam, the Netherlands AISWEI New Energy Technology (Yangzhong) Co., Ltd. Hotline: +86 400 801 9996 Add.: No.588 Gangxing Road, Yangzhong Jiangsu, China https://solplanet.net/contact-us/

32

UM0046_Ai-LB 10K Pro_EN_V02_0524

UM0046_Ai-LB 10K Pro_EN_V02_0524

33