Solplanet Ai-LB 10K Pro 10 kWh Low Voltage Battery Installation Guide
- June 26, 2024
- solplanet
Table of Contents
- Solplanet Ai-LB 10K Pro 10 kWh Low Voltage Battery
- Specifications
- Product Information
- Product Usage Instructions
- FAQs
- General information
- Safety
- Unpacking and storage
- Product overview
- Mounting
- Electrical connection
- Commissioning
- Decommissioning the product
- Handling Precautions and Guidelines for Product
- Maintenance
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
Solplanet Ai-LB 10K Pro 10 kWh Low Voltage Battery
Specifications
- Product: Ai-LB Pro battery energy storage system (BESS)
- Model: Ai-LB 10K Pro
- Manufacturer: Solplanet
- Document Version: UM0046_Ai-LB 10K Pro_EN_V02_0524
Product Information
This document provides detailed instructions for mounting, installation, commissioning, configuration, operation, troubleshooting, and decommissioning of the Ai-LB Pro battery energy storage system (BESS). It is essential to follow these instructions carefully to ensure safe and optimal usage of the product.
About this document:
The document is intended for qualified persons with knowledge of battery operation, inverter operation, electrical device installation, and relevant laws, standards, and directives. Failure to adhere to the instructions may void the manufacturer’s warranty.
Safety Guidelines:
- The product is not suitable for powering life-sustaining medical devices.
- Ensure that power outages from the battery system do not lead to personal injury.
- Use the product only in countries approved by Solplanet.
- Follow the information in this documentation and local standards to prevent injury or property damage.
Product Usage Instructions
Commissioning:
Before commissioning, inspect the system as described in section 7.1 of the user manual.
Installation:
Follow the mounting and installation instructions provided in the manual. Ensure all connections are secure and comply with electrical safety standards.
Configuration:
Configure the Ai-LB Pro system according to the guidelines outlined in the documentation. Pay attention to settings related to battery operation and inverter functionality.
Operation:
Operate the BESS system as per the specified procedures. Monitor performance indicators and address any issues promptly.
Troubleshooting:
Refer to the troubleshooting section of the manual in case of system malfunctions or errors. Follow the recommended steps to identify and resolve issues.
Decommissioning:
When decommissioning the system, follow the instructions provided to safely shut down and disconnect the BESS. Dispose of components according to local regulations.
FAQs
- Q: Can the Ai-LB Pro system be used to power medical devices?
- A: No, the product is not suitable for supplying power to life-sustaining medical devices.
- Q: What should I do in case of a power outage from the battery system?
- A: Ensure that no personal injury would result from the power outage and take necessary precautions to mitigate risks.
- Q: How can I ensure compliance with local regulations when using the product?
- A: Use the product only in countries approved by Solplanet and follow all guidelines provided in the documentation and local standards to prevent any violations.
General information
1.1 About this document
This document describes the mounting, installation, commissioning,
configuration, operation, troubleshooting and decommissioning of the Ai-LB Pro
battery energy storage system (BESS). You will find the latest version of this
document and further information on the BESS in PDF format at
www.solplanet.net. It is recommended that this document be readily accessible
at all times.
1.2 Product validity
This document is valid for the following models: Ai-LB 10K Pro
1.3 Target group
This document is intended for qualified persons who must perform the tasks
exactly as described in this user manual. All installation work must be
performed by appropriately trained and qualified persons. Qualified persons
must possess the following skills: Knowledge of how batteries work and are
operated. Knowledge of how an inverter works and is operated. Training in how
to deal with the dangers and risks associated with installing, repairing and
using electrical devices and
batteries and installations. Training in the installation and commissioning of
electrical devices. Knowledge of all applicable laws, standards and
directives. Knowledge of and compliance with this document and all safety
information. Not adhering to the prescribed instructions may potentially void
the manufacturer’s warranty. If in doubt, please contact the local Solplanet
service team.
UM0046_Ai-LB 10K Pro_EN_V02_0524
1
1.4 Symbols DANGER
Indicates a hazardous situation which, if not avoided, will result in death or
serious injury.
WARNING
Indicates a hazardous situation which, if not avoided, could result in death
or serious injury.
CAUTION
Indicates a hazardous situation which, if not avoided, could result in minor
or moderate injury.
NOTICE
Indicates a situation which, if not avoided, can result in property damage.
Information that is important for a specific topic or goal, however not
related to safety.
2
UM0046_Ai-LB 10K Pro_EN_V02_0524
Safety
2.1 Intended use
The Ai-LB 10K Pro is a BESS is for both residential and commercial
applications and operates with Solplanet hybrid inverters The product is
intended for indoor applications. It is a low voltage Li-ion BESS. It can be
operated in on-grid, off-grid and backup modes with all officially compatible
Solplanet inverters. The product is suitable for indoor and outdoor use. The
product must only be used as stationary equipment. Alterations to the product
are not allowed unless authorized in writing by Solplanet. Unauthorized
alterations will void the guarantee and warranty claims. Solplanet will not be
held liable for any damage
caused by such unauthorized alterations. The product is not suitable for
supplying power to life-sustaining medical devices. Please ensure that no
personal injury would lead due to the power outage of the battery system. The
product must only be used in countries for which it is approved for by
Solplanet. Use this product only in accordance with the information provided
in this documentation and with the locally applicable
standards and directives. Any other application may cause personal injury or
property damage. The type label must remain permanently attached to the
product. This document does not replace any regional, state, provincial,
federal or national laws, regulations or standards that apply
to the installation, electrical safety and use of the product.
2.2 Important safety instructions
The product has been designed and tested strictly according to the
international safety requirements. As with all electrical or electronical
devices, there are residual risks despite careful construction. To prevent
personal injury and property damage and to ensure long-term operation of the
product, read this section carefully and observe all safety information at all
times.
DANGER
Danger to life due to electric shock where surge protection is not used If
there is no surge protection, a voltage surge can be conducted into the
building and to other connected devices in the same system through power
cables, network cables or other types of cable. Touching live parts and cables
may result in death or lethal injury due to electric shock.
Ensure all devices in the same system and the inverter are integrated within
an existing surge protection systems/devices. Refer to local installation
regulations to determine the requirements for the installation of surge
protection devices.
WARNING
Danger to life due to electric shock from destruction of mea- surement devices
due to overvoltage
Overvoltage can damage a measurement device and result in voltage being
present in the enclosure of the measurement device. Touching the live
enclosure of the measuring device results in death or lethal injuries due to
electric shock.
Only use measuring devices with a higher voltage range than the system battery
voltage.
UM0046_Ai-LB 10K Pro_EN_V02_0524
3
WARNING
Risk of injury due to weight of product Injuries may result if the product is
lifted incorrectly or dropped while being transported or mounted.
Lift and transport the product carefully. Wear suitable personal protective
equipment, in accordance with local regulations, when working on the product.
NOTICE
Damage to the battery system due to electrostatic discharge Internal
components of the battery system can be irreparably damaged by electrostatic
discharge.
Ground yourself before touching any component.
2.3 Symbols on the label
Beware of a danger zone This symbol indicates that the product must be
additionally grounded if additional grounding or equipotential bonding is
required at the installation site.
Beware of high voltage and operating current The product operates at a high
voltage and current. Work on the product must only be carried out by skilled
and authorized personnel.
WEEE Designation Do not dispose of the product together with household waste.
Dispose the product in accordance with local disposal regulations for
electronic waste
CE marking The product complies with the requirements of the applicable EU
directives.
The battery is recyclable The battery can be recycled by a professional
recycling organization, please refer to the relevant local regulations.
Observe the documentation Read and understand all documentation supplied with
the product.
ROHS marking The EU material and process standards for electrical and
electronic products make them more conducive to human health and environmental
protection.
UKCA marking The product complies with the requirements of the applicable UK
Product Directive.
4
UM0046_Ai-LB 10K Pro_EN_V02_0524
Unpacking and storage
3.1 Scope of delivery
Check the scope of delivery for completeness and any visible external damage.
Contact your supplier if the package is damaged upon delivery or is incomplete
or damage.
A
B
C
D
E
F
G
H
I
J
Object A
B
C D E F G H I J
Item Name
Details
Quantity
Battery
Ai-LB 10K Pro
550x165x867 mm
1
21.651×6.50×31.21 in
Power Cable
Positive: orange plug, 35 mm² / 2 AWG, L:1.5 m (59.06 in) to SC50-10
ring terminal. 1 set
Negative: black plug, 35 mm² / 2 AWG, L:1.5 m (59.06 in) to SC50-10
ring terminal
Ground cable yellow & green/L:1 m
Grounding Cable
(39.37in)/ double OT M6
1
Standard network cable black/L:1.5 m
Communication cable
1
(59.06 in)/Double RJ45 Plug
Mounting Plate
1
Expansion Screw
M8*80 mm
4
Screw
M5*16 mm
2
Mounting Positioning
1
Board
RJ45 Water-proof Wiring 3
Terminal
Wifi Stick
EESW-A400-02, 98x23x23 mm
1
Notes
Continuous flow capacity160A
UM0046_Ai-LB 10K Pro_EN_V02_0524
5
3.2 Product storage
Suitable storage is required if the equipment is not installed immediately:
Store the battery in the original packing case. The storage temperature must
be between -10°C ~ +50°C, and the storage relative humidity must be 5~95% RH,
non-
condensing. The storage SOC: 25%~50%. Re-charge the battery every 6 months, to
ensure no over-discharge of the battery occurs. The packing with the equipment
shall not be tilted or inverted. Place the equipment in a cool place away from
direct sunlight. Keep the equipment away from flammable, explosive, and
corrosive materials. Keep the equipment away from rain. The product must be
fully inspected and tested by authorized personnel before it can be put into
operation, if it has been
stored for three or more months.
6
UM0046_Ai-LB 10K Pro_EN_V02_0524
Product overview
4.1 Dimensions
Unitmm
4.2 Interfaces and functions
UM0046_Ai-LB 10K Pro_EN_V02_0524
7
The product is equipped with the following interfaces and functions:
Number
Name
Details
Notes
1
Power Switch
Red LED: ALARM, Blue LED: RUN
2
INVERTER
RJ45
CAN communication to the inverter
3
LINK IN
RJ45
Internal RS485 communication between batteries
4
LINK OUT
5
Port Negative x2
6
Port Positive x2
7
GND
RJ45 PSR8XAB PSR8XBB
M6
Internal RS485 communication between batteries
Black cable 35 mm² / 2 AWG, cable plug model: PSRP8XA50, Manufacturer:
GENERAL(Suzhou) CO., Ltd. Red cable 35 mm² / 2 AWG, cable plug model:
PSRP8XB50, Manufacturer: GENERAL(Suzhou) CO., Ltd.
Yellow-Green, 10 AWG
8
Venting Valve
9
WIFI Socket
For WIFI stick
10
125A DC Breaker
11
Reset Point
In case of severe undervoltage, wake up the battery
RJ45 Port Pin Definition
View
Item Description
1
2
3
4
5
6
7
8
2
INVERTER
–
RS485A
RS485B
CAN-H
CAN-L
GND
–
–
3
LINK IN
4
LINK OUT
WiFi Socket port description Side View
BMS- BMS-
–
RS485- RS485- DI+
A
B
DI-
NC
BMS- BMSCAN-H CAN-L
–
BMS- BMS-
RS485- RS485- DO+
DO-
A
B
NC
BMS- BMSCAN-H CAN-L
Description
Use Wifi stick for remote software update.
Please contact Solplanet after-sales service department to implement specific
operations.
8
UM0046_Ai-LB 10K Pro_EN_V02_0524
4.3 Basic system solution
The photovoltaic energy storge power generation system is composed of the
following parts.
UM0046_Ai-LB 10K Pro_EN_V02_0524
9
Mounting
5.1 Requirements for mounting
5.1.1 Requirements for Installation Location
DANGER
Danger to life due to fire or explosion Despite careful construction,
electrical devices can cause fires. This can result in death or serious
injury. Do not mount the product in areas containing highly flammable
materials or gases. Do not mount the inverter in areas where there is a risk
of explosion.
A solid support surface must be available (e.g., concrete or masonry). The
mounting location must be inaccessible to children. The installation location
must be suitable for the weight and dimensions of the BESS. Keep away from
conductive (metal) dust. Keep away from water sources, heat sources and
inflammable and explosive articles. The installation location must not be
close to fire. The product should be mounted such that the LED indicators can
be read without difficulty. The circuit breaker of the BESS must always be
freely accessible. The altitude of the installation location should be less
than 3000 m. The charging temperature should be between -5°C ~ +55°C. The
discharging temperature should be between -15°C ~
+55°C. The ambient humidity should be 5~95% RH, noncondensing. The mounting
location must not be permanently exposed to direct sunlight . If the product
is exposed to direct sunlight,
the exterior components may age prematurely and overheating might occur. When
becoming too hot, the BESS reduces its power output to avoid overheating, and
will lead to reduced lifetime.
10
UM0046_Ai-LB 10K Pro_EN_V02_0524
UM0046_Ai-LB 10K Pro_EN_V02_0524
11
5.1.2 Tools
Phillips-screwdriver Specification: M5/M6
Marker pen
Phillips Screwdriver Bit Specification: M5 / M6
Wrench
Torque wrench Specification: M8
Twist drill(12mm)
Level
Heat Gun
Electric Drill
Network Cable Crimping Tool
Wire Stripper
Crimping Pliers
Scissor
Hammer
Tape measure
5.1.3 Safety gear
Wear the following safety gear when working on the BESS. Adhere to local occupational health and safety standards.
12
UM0046_Ai-LB 10K Pro_EN_V02_0524
Insulated gloves
Safety goggles
Safety shoes
5.2 Mounting
Step 1 Measure the mounting space (position a cardboard the same size as the
battery). Mark the fixed position with the “Mounting Locating Plate(H)”.
Step 2 Use an impact electric drill to drill holes in the concrete or stone (fireproof) wall, the drilling depth is between 80mm and 85mm: The drill diameter is 12 mm.
UM0046_Ai-LB 10K Pro_EN_V02_0524
13
Step 3 1 Tighten the “Expansion Bolt(F)” slightly and put it into the hole.
Knock the expansion bolt with a rubber hammer until all the expansion plugs
enter into the hole. 2 Screw out the bolts and remove the spring washer and
flat washer.
Step 4 Fix the “Back Plate (E)” to the wall.
Step 5 Hang the battery on the bracket according to the picture below.
14
UM0046_Ai-LB 10K Pro_EN_V02_0524
Step 6 Secure the PACK from the side using ” Screws(G)”.
UM0046_Ai-LB 10K Pro_EN_V02_0524
15
Electrical connection
6.1 Requirements for the Electrical connection
6.1.1 Power Cable
Material List (plug components may be purchased separately from supplier).
Plug sub assembly
Cable sealing ring
Procedure
1.Route the cable through the isolation cable sealing ring and Plug protection
cover.
2.Remove 13mm of insulation at end of cable.
3.The red plug is used for the positive, and the black is for the negative
power cable. The end of the cable is crimped at the terminal using a crimping
clamp.
4.Tighten the isolation cap and plug contact.
Plug protection cover Schematic picture
5.Connect the positive and negative plug into the “+” and “” Port of the BESS
and tighten.
6.Use isolation cap for unused DC plug.
6.1.2 Communication Cable
Battery to Battery Communication Cable. Pin definition as below, alternatively
a standard straight CAT 5 Ethernet cable can be used.
16
UM0046_Ai-LB 10K Pro_EN_V02_0524
Battery to Inverter Communication Cable
6.1.3 Install an isolation device
Install an isolation device (i.e., a circuit breaker) between the inverter and
the battery system to run both positive and negative conductor overcurrent
protection. The steps for installing isolation devices (i.e., circuit
breakers) are as follows: 1. Use E25-16 terminals to connect the wiring
harness to the isolation device. 2. Insert the wiring harness terminal into
the connection port of the isolation device and distinguish the positive and
negative terminals of the isolation device (see the isolation device
specifications for details). 3. Tighten the wiring harness terminal with
screws to secure it.
During installation, please turn off the battery power switch and check
whether the power is off.The cable from the circuit breaker to the inverter is
provided by the installation personnel. (Please refer to the Product Packaging
List for cable specifications).
UM0046_Ai-LB 10K Pro_EN_V02_0524
17
6.2 Single Unit Connection
NOTICE
Before electrical connection, ensure that the circuit breaker/power switch of
the battery and all switches connected to the energy storage are in the OFF
state. Otherwise, electric shock may occur. 1. The rated output power of the
cable connection is 6 kW; SOC>70% The output power is 8 kW. 2. Install circuit
breakers based on local regulations.
6.3 Ground Connection
18
UM0046_Ai-LB 10K Pro_EN_V02_0524
6.4 Communication Connection
Step 1 Route the communications cable through the “RJ45 Water-proof Wiring
Terminal(I)”.
Step 2 Connect the communications cable to the RJ45 port (labelled
“Inverter”).
Step 3 Tighten the RJ45 cable cover.
UM0046_Ai-LB 10K Pro_EN_V02_0524
19
Step 4 Connect the other end of the communication cable to the inverter.
6.5 Power Cable Connection
6.6 Turn On Battery
Step 1 Turn on the DC isolator on the BESS while the power switch is off. Step
2 Press the “Power Switch” to turn on battery. After five seconds, the blue
LED flashes to indicate normal operation. Step 3 Cover with the front cover
after checking.
20
UM0046_Ai-LB 10K Pro_EN_V02_0524
State Light
Remarks
Standby
Charge
Discharge
Failure
LED illuminates for LED illuminates for
0.25 S / LED turns off 0.5 S / LED turns off
for 0.75 S
for 0.5 S
Permanently illuminated
Continuous blinking
When the battery starts up, the red and blue lights alternately blink, indicating that the battery self-test is normal
6.7 Shutdown Battery
Step 1 Press the “Power Switch” to shutdown battery. Step 2 Turn off the DC
isolator while the power switch is off.
UM0046_Ai-LB 10K Pro_EN_V02_0524
21
6.8 Multi-Unit Connection with Bus-Bars (3-unit example)
Step 1 The method of cable connection with a bus-bar will output a power of 3
x 6 kW =18 kW. Step 2 Max. number of parallel units: 16. Note that the max.
recommended charge and discharge power is 96 kW continuous and 130 kW peak
respectively. Step 3 Install circuit breakers based on local regulations.
You can also use a 40*4 mm² copper bar with a flow capacity of 500A as the bus
bar.
22
UM0046_Ai-LB 10K Pro_EN_V02_0524
6.9 Multi-Unit Connection without Bus-Bars (3-unit example)
Step 1 This wiring method will allow a max. power output of 6 kW continuous,
limited by the wiring and connectors. Ensure the connected inverter does not
exceed 6 kW/120 A continuous during both charge and discharge.
Step 2 Install circuit breakers based on local regulations.
6.9.1 Ground Connection Please follow step 6.2. 6.9.2 Communication Connection
Please follow step 6.3.
UM0046_Ai-LB 10K Pro_EN_V02_0524
23
6.9.3 Power Cable Connection
Parallel cable needs to be purchased extra.
6.9.4 Turn On Battery Bank Please follow step 6.6. Make sure all isolators are
turned on before pressing the power switches on all batteries.
24
UM0046_Ai-LB 10K Pro_EN_V02_0524
Commissioning
7.1 Inspection before commissioning
Check the following items before commissioning the BESS: Ensure inverter is
compatible with the battery. The official compatibility list can be found at
www.solplanet.net Ensure the inverter is correctly mounted as per Solplanet’s
guidelines, please refer to the inverter user manual Ensure the battery is
properly installed and secured in accordance with this user manual. Ensure the
isolator between the battery system and the inverter is off. Ensure the
communication cables and DC cables are correctly and securely connected.
Ensure the ground terminal on the BESS is grounded. Ensure the DC power cables
have been installed with the correct polarity.
7.2 Commissioning procedure
The battery can operate together with Solplanet inverters as default.
Monitoring of the battery status is available via the Solplanet App when
installed with a Solplanet inverter.If the battery operate together with the
other inverters, please contact Solplanet service.
If all the items mentioned above have been met, then proceed as follows to
commission and start-up the battery for the first time:
Step 1 Turn the battery isolator while the power switch is off. Step 2Turn on
Power Switch to start battery. After five seconds:
If the Power Switch LED blinks blue, it means that the battery enters into
working modes. Proceed to step 3. If the Power Switch LED blinks red or is
permanently illuminated red, it means that a battery alarm has occured after
the system self-check, please stop the commissioning procedure and call the
local Solplanet service support for assistance.
Step 3 Start inverter according to the inverter start-up procedure.
Step 4 Commission the inverter according to the inverter commissioning
procedure using the Solplanet App.
Step 5 Read the battery status information using the Solplanet App and confirm
that the BESS is communicating with the inverter.
UM0046_Ai-LB 10K Pro_EN_V02_0524
25
Decommissioning the product
Procedure
Step 1 Switch off the inverter by first turning off the AC circuit breaker
downstream of the AC output of the inverter and second by turning off the
inverter DC switch. Step 2Switch off the BESS. Ensure that the Power Switch
LED is OFF.
Step 3 Switch off the any external DC switches between the inverter and the
BESS if there are any.
Step 4 Remove all cables from the BESS.
Step 5 If the battery system is to be stored or shipped, pack the system using
the original packaging or packaging that is suitable for the weight and
dimensions of the system. Dispose of the battery system in accordance with the
locally applicable battery disposal regulations.
26
UM0046_Ai-LB 10K Pro_EN_V02_0524
9 Technical data
Key Item
Specification
Remark
Rated Capacity
200 Ah
Rated Voltage
51.2 Vdc
Working Voltage Range
44.8-58.4 V
Rated Energy
10.24 kWh
Max. Parallel Quantity
Rated Charging Current
Max. Charging Continuous Current
Rated Discharge Current
Max.16 Sets In Parallel, 163.84 kWh 0.6 C,120 A 0.6 C,120 A 0.6 C,120 A
Max. Discharge Continuous Current
Battery Max. Charge/Discharge Power
Peak Discharge Current / Power
0.6 C,120 A 6.14 kW / 6.14 kW 160 A / 8.19 kW, 1 min
Available SOC Range
0 % ~ 100 %
90 % DOD is recommended.
SOC during transportation Dimensions [WDH] Weight
Operating Temperature1 Storage Temperature2
50 % Width: 550±5mm / 21.65 in, Depth: 165±5mm / 6.50 in, Height: 867±5mm /
31.21 in
~94 kg Charging Temperature-5 °C ~ 55 °C Discharge Temperature-15 °C ~ 55 °C
-10 °C ~ 50 °C
Working Humidity
5~95 %RHNon-Condensing
Altitude3
2000 m
Communication
CAN, RS485, Dry Contact, WiFi
WiFi Stick Option
Certificate Designed Cycle Life
IP Rating
TUV, IEC 62619, IEC62040, IEC61000, UN38.3
6000 Cycles
0.5 C/80 % DOD/80 % SOH/1 Cycle Per Day25 °C±2 °C
IP65
Cooling
Natural Cooling
Environment protection standard
RoHSREACH
1. Recommended operating temperature: 1030°C. 2. Recommended Storage
temperature: 1030°C.
3. Recommended working height is less than 2000 m, and the maximum working
height is 3000 m.
UM0046_Ai-LB 10K Pro_EN_V02_0524
27
Handling Precautions and Guidelines for Product
These Handling Precautions and Guidelines for Rechargeable Battery System
(“Handling Precautions and Guidelines”) shall only apply to the packs
manufactured by AISWEI New Energy Technology (Yangzhong) Co., Ltd (hereinafter
referred to as “AISWEI”). Customer shall strictly follow these Handling
Precautions and Guidelines, and shall alert its customers, contract
manufacturers, agents, distributors, service providers and end users of the
risks of the packs and shall ensure that Customer’s obligations as specified
in the Document as well as the Handling Precautions and Guidelines are,
through a printed label on host device, or through Customer’s Quick
Installation Guide, or a help file or Customer’s Internet website,
contractually imposed on Customer’s own customers and distributors, and by
them further down to the end users so that the entire chain is committed to
the above obligations and so that the products are properly handled, operated,
transported, used and maintained.
Statement (1):
Customer is requested to contact AISWEI in advance, if and when the customer
needs other applications or operating conditions than those described in this
Document. Additional experimentation may be required to verify performance and
safety under such conditions
Statement (2):
AISWEI will take no responsibility for any accident or liabilities in the
event the Product is used for applications or under conditions other than
those described in this Document.
Use Product under specified charge/discharge conditions.
Do not immerse in water.
Do not heat.
Do not attempt to crush, drop or penetrate the pack.
Do not attempt to have any modification/.
Leave Product in cool places.
Stop using Product with any colour change or mechanical damage detected during
assembling, charging, normal operation and storage.
In case of leakage or smells, track to thermal source, remove the thermal
source and clean with water.
Do not place or leave the pack and equipment in the reach of children so that
they are not able to swallow or mistreat the product. In case of ingestion,
consult with a doctor immediately.
Keep leaked electrolyte away from eyes or skin. In case of leakage contact
with eyes or skin, immediately clean with water and seek help from a doctor.
Serious damages can be caused due to delayed treatment.
Do not put the pack into a fire. Do not use it or leave it in a place near
fire, heaters, or high temperature sources. The heat can melt pack insulator
and damage safety vent, resulting in overheat, explosion or fire of the pack .
Do not submerge the product in water or wet the product. If the protective
devices are damaged, abnormal charging current and voltage may cause a
chemical reaction within the product, which may result in overheat, explosion
and even fire of the pack.
Do not connect positive (+) and negative (-) terminals of the pack reversely.
Do not short circuit. Do not contact the pack terminals (+ and -) directly
with a wire or any metal (like a metal necklace or a hairpin). Otherwise, the
pack is short circuited and generates excessive current, which may result in
overheat, explosion, or fire of the pack.
Do not throw or drop the pack. Strong impact may damage the protective devices
and an abnormal chemical reaction might occur during charge, resulting in
overheat, explosion, or fire of the pack.
Do not drive a nail in, hit with a hammer, or stamp on the pack. Otherwise,
the pack may be deformed and short circuited, resulting in overheat,
explosion, or fire of the pack.
Do not solder the pack directly. Heat applied during soldering may damage the
insulator of the safety vent and mechanism, resulting in overheat, explosion,
or fire of the pack.
Do not disassemble or alter the pack. The pack employs a safety mechanism and
a protection device in order to avoid any danger. If they are damaged, the
pack might overheat, explode or catch a fire.
Do not put the pack in a microwave oven or a pressure cooker. Sudden heat may
damage the sealing of the pack and may cause overheat, explosion, or fire of
the pack.
28
UM0046_Ai-LB 10K Pro_EN_V02_0524
Do not leave the pack in a charger or equipment if it generates an odour
and/or heat, changes colour and /or shape, leaks electrolyte, or encounters
any other abnormality. In such a case, immediately take the pack out of the
charger or equipment and keep it away from fire. Otherwise, the pack might
overheat, explode, or catch a fire.
Stop charging or using the battery after battery reaches its lifetime,
otherwise, as the PACK might cause heat generation, explosion, or fire.
Do not use the pack beyond specified conditions. Otherwise, the pack might
encounter overheat, damage, or performance deterioration.
Read the instructions regarding the installation and operation so as to avoid
damages due to incorrect operations.
The pack may have insufficient power capacity after long storage.
Knockoff or counterfeit battery.
Any inconsistency between serial number, model number, and product code.
UM0046_Ai-LB 10K Pro_EN_V02_0524
29
Maintenance
To ensure the long-term running of the energy storage system (hereinafter referred to as “the system”), you are advised to perform the following maintenance operations:
Check content System cleaning
Maintenance method Check whether the appearance of the system is
damaged or deformed. Clean the system.
Maintenance cycle
Once every six months to once a year.
System running state
Check whether there is abnormal sound during the operation of the system.
Check whether indicator LED´s work normally. Check whether the system
parameters are
normal. Update software.
Once every six months.
Electrical connection Ground reliability
Check whether the cable connections are loose. Check whether the cables are
discolored. Check whether the cable is damaged, especially
whether there is a cut mark on the surface of the cable in contact with metal
surfaces.
Check whether the ground cable is grounded reliably.
Half a year after the first commissioning, and once every half a year to a
year thereafter.
Half a year after the first commissioning, and once every half a year to a
year thereafter.
30
UM0046_Ai-LB 10K Pro_EN_V02_0524
12 Recycling and disposal
Dispose of the packaging and replaced parts according to the rules applicable
in the country where the device is installed. Do not dispose the Solplanet
BESS with normal domestic waste.
Do not dispose of the product together with the household waste but in
accordance with the disposal regulations for electronic waste applicable at
the installation site.
13 EU declaration of conformity
Within the scope of the EU directives · Radio Equipment Directive 2014/53/EU
(L 153/62-106. May 22. 2014) (RED) · Restriction of the use of certain
hazardous substances 2011/65/EU (L 174/88, June 8, 2011) and 2015/863/EU (L
137/10, March 31,2015) (RoHS) AISWEI New Energy Technology (Yangzhong) Co.,
Ltd. confirms herewith that the products described in this manual are in
compliance with the fundamental requirements and other relevant provisions of
the above mentioned directives. The entire EU Declaration of Conformity can be
found at www.solplanet.net.
14 Service and warranty
If you have any technical problems concerning our products, please contact
Solplanet service. We require the following information in order to provide
you with the necessary assistance: · Ai-LB Pro battery energy storage system
type · Ai-LB Pro battery energy storage system serial number · Ai-LB Pro
battery energy storage system battery type · Type and number of connected PV
modules · Error code · Mounting location · Installation date · Warranty card
The factory warranty card is enclosed with the package, please keep well the
factory warranty card. Warranty terms and conditions can be downloaded at
www.solplanet.net, if required. When the customer needs warranty service
during the warranty period, the customer must provide a copy of the invoice,
factory warranty card, and ensure the electrical label of the machine is
legible. If these conditions are not met, Solplanet has the right to refuse to
provide with the relevant warranty service.
UM0046_Ai-LB 10K Pro_EN_V02_0524
31
15 Contact
EMEA Service email: service.EMEA@solplanet.net APAC Service email:
service.APAC@solplanet.net LATAM Service email: service.LATAM@solplanet.net
AISWEI Pty Ltd. Hotline: +61 390 988 674 Add.: Level 40, 140 William Street,
Melbourne VIC 3000, Australia AISWEI B.V. Hotline: +31 208 004 844
(Netherlands) +48 134 926 109 (Poland) Add.: Barbara Strozzilaan 101,5e etage,
kantoornummer 5.12,1083HN Amsterdam, the Netherlands AISWEI New Energy
Technology (Yangzhong) Co., Ltd. Hotline: +86 400 801 9996 Add.: No.588
Gangxing Road, Yangzhong Jiangsu, China https://solplanet.net/contact-us/
32
UM0046_Ai-LB 10K Pro_EN_V02_0524
UM0046_Ai-LB 10K Pro_EN_V02_0524
33