Nature Anywhere Beak Boutique Chicken Run Instruction Manual

June 15, 2024
Nature Anywhere

Nature Anywhere Beak Boutique Chicken Run

Specifications

Components Quantity
Bottom Corner 4X
Center T 5X
Door Stop 1X
Gloves 1X
Snap-In Tubes 10X

Assembly Steps

  1. Prepare the parts from BOX 0 and BOX 1, including 4 Bottom Corners, 5 Center Ts, 1 Door Stop, 1 pair of Gloves, and 10 Snap-In Tubes.
  2. Lay out the Bottom Corners, Center Ts, Snap-In Tubes, and Door Stop on the ground to form the foundation.
  3. Put on your work gloves for safety.
  4. Connect the foundation parts by snapping in the tubes into the corresponding connectors.
  5. Choose the best location for the Beak Boutique, keeping in mind the direction of the doorway.
  6. Prepare parts from BOX 2 – Lower Wall and BOX 0 – Connections including 17 Snap-In Tubes, Doorway Lock, Doorway Hinge, 4 Corners, 2 Center Ts, and 4 Crosses.
  7. Insert the Hinge and Door Lock, ensuring the hinge connects to the left of the door lock and the lock faces right.
  8. Insert 8 Vertical Tubes into the foundation structure.
  9. Connect T to Hinge and Lock Tubes.
  10. Install the Corners to the vertical tubes.
  11. Install Crosses to reinforce the structure.
  12. Install 9 Horizontal Tubes to form the lower wall framework.
  13. Repeat the preparation and assembly steps for the Upper Wall with parts from BOX 3.
  14. Prepare and install the Door Stop Cross, Cross Connectors, Roof Crosses, and Corner Connectors with parts from BOX 0 and BOX 3.
  15. Install the Snap-In Tubes to complete the upper wall framework.
  16. Prepare the Roof components from BOX 4, including Snap-In Tubes, Beam Middle Tubes, Beam Edge Tubes, Side Beam Cross, Center Beam Cross, and Short Tubes.
  17. Connect the Front Beam, Back Beam, and Center Beam as shown in the diagrams.
  18. Insert Short Tubes, 3x Beams, and 2x Crossbeams into the roof structure.
  19. Prepare the roosting bars and support structure with parts from BOX 2.
  20. Connect the Center Post Base, Support Bar Bolt and Connector, and Roosting Bars, then install them into the middle roof beam.
  21. Attach the Bottom Door and Wall Panels using Zip Ties as detailed, ensuring the first row is complete.
  22. Proceed with attaching the Upper Door and Wall Panels, completing the second row.
  23. Attach the Flooring Panels to the bottom of the structure.
  24. Install the 4 “Bent” Panels and 4 Square Panels to the roof.
  25. Install the Triangle Mesh and Middle Mesh to the roof with Zip Ties.
  26. Trim the excess Zip Tie ends for a neat finish.
  27. Cover the roof with a Tarp, connecting it with Elastic Straps for weather protection.
  28. Connect the Door Latches and Bolts to secure the doors.
  29. Finalize the assembly, and your Beak Boutique is ready for chickens.

FAQ

What tools are needed for assembly?

No tools are required as the parts are designed to snap together, though a cutter is needed to trim the Zip Ties.

Can the location of the Beak Boutique be changed after assembly?

It is recommended to choose the final location before assembly as the structure may not be easily movable once completed.

Is the Beak Boutique suitable for outdoor use?

Yes, the Beak Boutique is designed for outdoor use and includes a Tarp for roofing to protect against weather conditions.

How many chickens can the Beak Boutique comfortably house?

The capacity will depend on the breed and size of the chickens. Please refer to the product specifications for recommended capacity.

Prepare

Lay Out On the Ground

Important! Now is the time to make sure you chose the perfect spot for your chicken run

Put on Your Work Gloves

ConnecttheFoundation

Choose Best Location for the Beak Boutique

Prepare

Insert Hinge & Door Lock

Insert 8 Vertical Tubes

Connect T to Hinge and Lock Tubes

Install Corners

Install 9 Horizontal Tubes

Prepare

Insert Hinge & Door Lock

Insert 8 Vertical Tubes

Prepare

Install Door Stop Cross

Install Cross Connectors

Install Roof Crosses

Install Corner Connectors

Install Snap -In Tubes

Prepare

Connect Front Beam

Connect Back Beam

Connect Center Beam

Insert Short Tubes

Insert 3x Beams

Install 2x Crossbeams

Prepare

Connect Connector to

Connect Bar to Connector

Connect First Roost

Add Short Support Bar

Install Roost on 2nd Support Bar

Add 2nd Support Bar &Roost

Insert Support into Middle Roof Beam

Prepare

Attach Bottom Door

Attach Bottom Wall Panels

First Row Done!

Prepare

Insert Upper Door

Attach Upper Wall Panels with Zip Ties

Second Row Done!

Prepare

Attach Flooring

Flooring Done!

Prepare

Install 4 “Bent” Panels

Install 4 Square Panels

Prepare

Install 4X Triangle Mesh

Install 2X Middle Mesh

Trim Zip Ties

Cover the Roof with a Tarp

Connect Tarp with Elastic Straps

Connect 2X Latch Connect 2X Bolt

Done! Just add chickens

Documents / Resources

| Nature Anywhere Beak Boutique Chicken Run [pdf] Instruction Manual
Beak Boutique Chicken Run, Boutique Chicken Run, Chicken Run, Run
---|---

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals