Arozzi Arena Assembly Guide
- June 8, 2024
- Arozzi
Table of Contents
ARENA ASSEMBLY GUIDE
SCREWS AND TOOLS
READ MORE AT AROZZI.SE / AROZZI.COM
ARENA ASSEMBLY GUIDE
STEP 1
1. Put the one foot of a leg, and take the screw package labeled A with
8x M6x15mm screws for the feet.
2. Insert tighten the four screws, repeat the procedure for the other leg.
STEP 4
4. Place the parts you just assembled on the legs as shown below. Screw
them together loosely with package C Repeat procedure for the other side.
Now the frame is done, DO NOT tightens the screws yet.
STEP 7
7. The screws in the last remaining package, E will hold the cable
management net in place. Put them in the remaining holes as shown. Now tighten
all the screws from previous steps
STEP 8
8. Put the net on by placing the loops over bolt heafs.
READ MORE AT AROZZI.SE / AROZZI.COM ARENA ASSEMBLY GUIDE
STEP 5
5. Find a flat surface to place the desk boards on, make sure you protect
the surface. You can use the Styrofoam packing in the box to put under the
desk boards and place the three boards desktop side down. Align them as shown
and slide the pegs into the holes so that they fit as close as possible.
STEP 6
6. Now put the metal frame feet upward and secure it to the desktop by
inserting the screws in package D to the metal frame.
READ MORE AT AROZZI.SE / AROZZI.COM
ARENA ASSEMBLY GUIDE
STEP 9
9. Before you turn the table you can adjust the height, loosen the screw
closet to each foot and then pull up the leg raise the height. You can use
measurement tape to set your preference.
STEP 10
10. After you have set your desired please make sure it is stable. When
you are done and have the desk standing, use a level and make sure it is flat
and the feet are firmly on the ground.
STEP 11
11. Roll out the mousepad and you are all done!
Arozzi Arena Assembly Guide – Download [optimized]
Arozzi Arena Assembly Guide – Download