DK2 POWER 40 Ton Kinetic LOG Splitter OPS240 User Manual

June 6, 2024
DK2 POWER

DK2 POWER 40 Ton Kinetic LOG Splitter OPS240

DK2 POWER 40 Ton Kinetic LOG Splitter OPS240

INSTALLATION INSTRUCTION

STEP 1:
Open and unpack all items. Leave lots of working space. Inspect all parts.
The SPLITTER is shipped in a crate. Remove all sides before you begin.

DK2 POWER 40 Ton Kinetic LOG Splitter OPS240 step 1

NOTE: UPON INSPECTION OF PARTS IF YOU FIND ANY DAMAGE OR MISSING PARTS PLEASE CALL DK2 POWER AT 702 331 5353 OR CONTACT US VIA
OUR WEBSITE WWW.DK2POWER.COM
WE WILL REPLACE ANY MISSING PARTS TO YOU FREE PLEASE DO NOT RETURN TO THE STORE

STEP 2:

  1. Install cross frame and tow bar frame.
  2. Use 4 bolt hardware included.

DK2 POWER 40 Ton Kinetic LOG Splitter OPS240 step 2

STEP 3:

  1. Open the hood
  2. Install the safety lock control handle. Screw it until tight into the locking casting.

DK2 POWER 40 Ton Kinetic LOG Splitter OPS240 step 3

STEP 4:

  1. Install the split handle with hardware provided
  2. Close and latch the hood

DK2 POWER 40 Ton Kinetic LOG Splitter OPS240 step 4

STEP 5:

  1. INSTALL THE FOOT STAND
  2. BOLT BOTTOM HOLE
  3. HITCH PIN TOP HOLE

DK2 POWER 40 Ton Kinetic LOG Splitter OPS240 step 5

STEP 6:

  1. INSTALL TOW BAR
  2. Secure tight using hardware provided.

DK2 POWER 40 Ton Kinetic LOG Splitter OPS240 step 6

STEP 7:

  1. Install the front table bracket as shown using the hardware provided.
  2. KEEP LOOSE until after table installation to help with hole alignment.

DK2 POWER 40 Ton Kinetic LOG Splitter OPS240 step 7

STEP 8:

  1. Install the wheels on the axel and insert spring pin.
  2. Make sure wheel is free spinning. You can remove pin, slide wheel and re pin to lock wheel during splitting.

DK2 POWER 40 Ton Kinetic LOG Splitter OPS240 step 8

STEP 9:

  1. Get some help lifting the unit by the hitch and standing the unit upright resting on the back bottom plate.
  2. Another option is use safely a hydraulic jack or lift chain.
  3. BE CAREFUL THIS IS UNIT IS HEAVY AND SHOULD BE HANDLED BY MULTIPLE PERSONS OR A SAFE LIFTING DEVICE.
  4. Insert the 4 bolts provided and tighten

DK2 POWER 40 Ton Kinetic LOG Splitter OPS240 step 9

STEP 10:

  1. Assembly LOG CRADEL SLIDES to side of beam as shown.
  2. Use hardware supplied and bolt both rail cradle assemblies together.
  3. Tighten all bolts securely.

DK2 POWER 40 Ton Kinetic LOG Splitter OPS240 step 10

STEP 11:

  1. Install the work table
  2. Use the 8 flat bolts and hardware provided
  3. Tighten the 2 bolts on the underside table supports that were left loose in previous assembly steps.
  4. Recheck all assembly bolts and equipment bolts and tighten if required.

DK2 POWER 40 Ton Kinetic LOG Splitter OPS240 step 11

CONGRATS YOUR ALMOST DONE
Grease the rack teeth and the spline with standard grease. Keep the log beam free of grease and keep clean when splitting. The ram slides on a teflon plate, so keep it clean from grease and wood particles.

DIAGRAM

Ref Description Ref Description
1 Handle rubber sleeve 29 Roller rack
2 Handle 30 Pressure roller
3 Upper hood 31 Engine under hood
4 clasp 32 Roller holder spring
5 Small switch screw 33 Belt
6 Work table 34 Engine
7 Pully 35 Gasoline engine floor
8 Protect the frame tube 36 Screw rod
9 pulley under hood 37 Gasoline engine support
10 Pressing buckle 38 PIN (Wheel shaft)
11 Left arm guard 39 Tire
12 Right arm guard 40 Forefoot
13 Shock block 41 Tire rack
14 Ejector pad 42 Forefoot brace
15 Split head fitting 43 Tow bar
16 Ring fixed block 44 Iron chain
17 Rings 45 Tower hitch
18 Table front support plate 46 Sport spring gear rod
19 Table back support plate 47 Small pully
20 Rubber cushion 48 Tyre rack support tube
21 Compression spring(Ejector pad) 49 Outer hexagon bolt
22 Bearing pedestal 50 Gear rod fixaton
23 Small switch 51 Small nylon wheel
24 transmission shaft 52 Gear rod cover
25 Trigger 53 under pressing roller fixing piece
26 Gear rod 54 The front foot pin
27 Beam 55 Torsional spring
28 Trigger pin  

READ THE KOHLER ENGINE MANUAL SUPPLIED WITH YOUR UNIT FOR FULL ENGINE OPERATION, SAFETY, AND MAINTENANCE.

YOUR UNIT HAS A COMMERCIAL KOHLER ENGINE WITH A 3YR PARTS AND SERVICE WARRANTY. FOR WARRANTY IN YOUR AREA CONTACT THE NEAREST KOHLER DEALER.
VISIT WWW.KOHLERENGINES.COM FOR PARTS, SERVICE, MANUALS, AND DEALER LOCATIONS.

OPERATION

BEFORE STARTING ENGINE
CLEAR AREA OF ALL PEOPLE AND PROPERTY THAT COULD BE DAMAGED. THINK SAFETY. THIS SPLITTER IS FAST AND CAN CAUSE INJURY IF SAFETY IS NOT ENFORCED. ONLY ONE OPERATOR SHOULD WORK THIS UNIT. NEVER HAVE ANOTHER PERSON LOADING LOGS WHILE ANOTHER IS AT THE CONTROLS.
DO NOT REMOVE THE SECOND HAND SAFETY LEVER.

IF YOUR UNIT WILL NOT START

  1. CHECK THE OIL LEVEL. YOUR ENGINE HAS A LOW OIL SHUTOFF PROTECTION AND WILL NOT START IF LOW ON OIL.
  2. MAKE SURE SPARK PLUG WIRE IS SEATED.
  3. MOVE THE GAS LEVER ON TO THE RIGHT. LEFT POSITION IS OFF.
  4. USE THE CHOKE IF NEED TO START IN COLD WEATHER.
  5. CHECK YOUR GAS LEVEL
  • DO NOT WEAR LOOSE FITTING CLOTHES THAT COULD GET STUCK IN THE RAM
  • ONLY SPLIT WOOD, NO METAL OR PLASTIC.
  • CHILDREN SHOULD NOT RUN THIS EQUIPMENT
  • STAY ALERT OF YOUR SURROUNDING AND PERSONS THAT COULD APEAR IN THE AREA WHILE YOU ARE WORKING.
  • LOAD LOG ON BEAM, SLIDE TO SPLITING WEDGE.
  • WEAR SAFETY GLASSES, GLOVES AND PROTECTIVE SHOES.
  • OPERATE OUTDOORS ONLY – GAS FUMES ARE DEADLY INDOORS.

RUN ENGINE AT FULL RPM.
ALLOW MACHINE TO REGAIN KINETIC ENERGY BETWEEN SPLITS
MACHINE RAM TRAVELS AT ½ SECOND FORWARD AND AUTO RETRACTS
WITH LOG LOADED – PULL SAFETY LEVER WITH LEFT HAND THEN QUICKLY WITH RIGHT HAND PUSH SPLIT LEVER FORWARD AND LET GO. DO NOT HOLD THE SPLIT LEVER IN SPLIT MODE. RAM AND LEVER WILL AUTO RETRACT AFTER MACHINE HAS SPLIT THE LOG.

PLEASE DO NOT RETURN TO THE STORE
YOU HAVE A 1 YEAR WARRANTY AND DK2 WILL REPLACE A DEFECTIVE PART FOR FREE
CALL US AT 702-331-5353 FOR FAST WARRANTY PARTS AND QUESTIONS

WHAT IS COVERED
DK2 Inc. warrants to the original purchaser of any DK2 product that it will be free and clear of manufacturing defects in workmanship and materials under normal use and service for a period of one (1) year from the date of the original purchase.
If within one (1) year from the original date of purchase this product fails due to defect in material or workmanship. DK2 POWER outdoor power equipment is 1-year parts only warranty no labor.
Upon expiry of one (1) year, Detail K2 will have no further liability related to the product. Detail K2 does not authorize any party, including its authorized distributors or dealers, to offer any other warranty on behalf of Detail K2 Inc.

KOHLER ENGINES – KOHLER CH SERIES ENGINES COMMERCIAL 3 YR PARTS AND LABOR WARRANTY see your Kohler manual for specific warranty.
DIESEL TRACTORS – Chassis component parts only, no labor, ENGINES – 1 YR KOHLER WARRANTY DK2 POWER OUTDOOR EQUIPMENT – 1-Year parts only, no labor.

THIS WARRANTY DOES NOT COVER OR APPLY TO:
Damage to the product due to misuse, mishandling and abuse

  • Improper installation, maintenance and storage
  • Expendable parts such as nuts and bolts, pins and springs, wiring and switch components, hydraulic hoses and fittings, cutting teeth, cutting chains, cutting blades, throttles, belts and tires.
  • Normal wear and tear
  • Consequential damage & incidental damages such as damage to persons or property

PROCEDURE FOR OBTAINING AN RETURN AUTHORIZATION
Within the one (1) year warranty period, the purchaser of the product must notify DK2 of the claimed defect and provide proof of original purchase. At this time the validity of the claim will be determined, and if approved replacement parts will be issued.
No returned product will be accepted under warranty unless accompanied by an RGA# issued by Detail K2 Inc.

RESOLUTION FOR A DEFECTIVE PRODUCT
DK2 POWER – Tractors, Chippers, Stump Grinders, Log Splitters, and Outdoor Power Equipment.
Call DK2 at 702-331-5353 in Las Vegas between 8am-4pm M-F Pacific Time.

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals