ENCLO EC18009 Charleston Screen Kit 38 W x 42 H Installation Guide
- June 6, 2024
- ENCLO
Table of Contents
ENCLO EC18009 Charleston Screen Kit 38 W x 42 H
45 min
Approximate assembly time for 2 screens
Scan the QR code for an assembly video
GENERAL INFORMATION
IMPORTANT
- Check the inside of the larger pieces in your box for other materials packed inside.
- When assembling components, place on a non-abrasive surface (i.e. shipping box) to avoid scratching.
- We recommend an area approximately 5’x 8’ for unobstructed assembling.
- You should not need to use excessive force when assembling components.
MISSING OR DAMAGED PARTS?
VISIT OUR WEBSITE FIRST,
SO WE CAN HELP YOU RIGHT AWAY!
Although great care has been taken to ensure proper packaging and handling of
this product, occasionally problems occur. If you discover any missing,
damaged, or defective parts, please visit our website to order replacement
parts. If you experience any further trouble with your product, please contact
our customer service department.
parts.nychbrands.com
support@encloscreens.com
704-892-5222 /
877-234-6196
Customer service agents are available to take calls weekdays from 9am-5pm EST.
If you call outside of business hours, please leave a voicemail.
To help you quickly and accurately, please have reference item number EC18009
and the specific part name which can be found on page 4. It is helpful if you
can provide the batch lot which is a stamped number on the end of the box.
NEED ASSEMBLY HELP?
If you are having problems with the assembly or installation of this product, we are happy to assist you with the process, so please give us a call at 704-892-5222 / 877-234-6196
NEED TO RETURN?
If for some reason you need to return this product, please allow us to help resolve your issues first. If you still decide to return the product, you will need to initiate the return from the company you originally purchased from.
ASSEMBLY INSTRUCTIONS
Detailed Product Dimensions & Specifications
STEP 1: LAY OUT MATERIALS
STEP 2: INSERT BOARD
- Orient the Left Post (C) and the Right Post (D) as shown below.
- Insert (1) Board (G) into the grooves of the left and right post.
STEP 3: FASTEN POST ANCHORS
Use (2) Wood Assembly Spacers (B) to align the board with the four pre-drilled post holes. The spacers can be removed after the height of the bottom board is established.
1. Insert (2) Post Anchors (F), into the posts until the pre-drilled holes in
the anchors and posts align.
2. Drive (4) 1″ Stainless Steel Screws (I) into the pre-drilled holes in the
posts to secure the board and post anchors.
STEP 4: COMPLETE THE FIRST SCREEN
1. Orient and drop (1) Spacer (E) into both of the post channels as shown.
2. Insert (1) board into the grooves of the left and right post.
1. Repeat Step 4.1 until all boards have been inserted.
2. Drive (2) 1″ stainless steel screws into the pre-drilled holes in the
posts to secure the boards.
STEP 5:ASSEMBLE THE SECOND SCREEN
Repeat Steps 2-4 in order to assemble the second screen.
STEP 6: INSTALLING THE SCREEN IN THE GROUND
-
Move the screen to its final location and identify where the posts are located. Attempt to push the unit into the ground as illustrated.
(Optional) -
If your ground is too hard, loosen the top 6″ or 7″ of the ground with a claw hammer as illustrated.
-
Add water to loosened soil.
-
Use a block of wood to protect the top of the post and gently hammer the post into the ground.
(Optional)
If your ground is too hard, dig a hole 8″ in diameter mand 14″ deep to
accommodate one post from each screen as shown below.
Level the screen, as necessary, backfill excavated dirt, and tamp if needed.
STEP 7: CONNECT THE SCREENS
1. Straight Line Application: Connect the screens as shown below using Joiner
Clips (H) and 1″ stainless steel screws.
2. Corner Application: Connect the screens as shown below using Joiner Clips
(H) and 1″ stainless steel screws.
STEP 8: INSTALL POST CAPS
Install (4) Post Caps (A) into the tops of the posts.
support@encloscreens.com
704-892-5222
877-234-6196
6935 Reames Rd. Ste. K.
Charlotte, NC 28216