concept2 SkiErg Assembly Instructions

June 6, 2024
concept2

concept2 SkiErg Assembly

concept2 SkiErg

concept2 SkiErg Assembly product

Assembly Instructions

Assembly Instructions

SkiErg weight: 46 lb (20.8 kg) Space required for use (training area): 24 in x 52 in x 85 in (61 cm x 132 cm x 215.9 cm)

Step 1:

SkiErg Assembly Instructions

This procedure will be easier with a helper. Lay out all parts as shown

1a. SkiErg body (includes flywheel and Performance Monitor PM5) with handle cords attached to top bracket
1b. Top Bracket
1c. 1 universal bracket for wall or floor stand mounting
1d. 2 Upper Arms

Step 2:

SkiErg Assembly Instructions 2

With the flywheel and PM5 facing up as shown, attach the upper arms to the front side of the SkiErg body using four fasteners.
Note: The upper arms are labeled on the inside with L for left and R for right.

Step 3:

SkiErg Assembly Instructions 3

Attach the top bracket to the tops of the arms using four fasteners—2 fasteners per side. The white handle cords should be crossed once as shown in photo 3a. Remove the shipping insert on the white handle cords to release.

Step 4:

SkiErg Assembly Instructions 4

Carefully stand the SkiErg up. Attach the upper arms to the NO back side of the SkiErg body using four fasteners.

Step 5:

SkiErg Assembly Instructions 5

Mount the SkiErg to a wall or to the optional floor stand NO using the two remaining fasteners.
5a. Wall mounted
5b. With optional floor stand

INSTALLATION INSTRUCTIONS

Wall mounted: Hardware is included for attaching the SkiErg to a wall with 16” wooden stud spacing. For mounting to other types of wall construction (metal, concrete, etc.), please consult with a building professional for safe and secure installation. See below for installation recommendations. Dimensions (without user): 20.5 in x 16 in x 83.5 in (52 cm x 40.6 cm x 212 cm). Training area: 24 in x 52 in x 85 in (61 cm x 132 cm x 215.9 cm). Weight: 46 lb (21 kg).

Free standing: The optional floor stand with built-in caster wheels allows for use on any level surface. Some assembly is required. Dimensions: 24 in x 52 in x 85 in (61 cm x 132 cm x 215.9 cm). Floor Stand Weight: 35 lb (18 kg).
HINT: Read through the instructions before beginning. It will be helpful to have another person assist with the installation.

Wall Mounting Instructions Tools Needed

Wall Mounting Tools Needed

  1. 1/2” (13 mm)
  2. Drill w/1/4” bit (6 mm)
  3. (2) 1/4”-20 fasteners
  4. (4) 5/16” lag screws
  5. (4) 5/16” washers
  6. (2) black spacers

When mounted properly, the lag screws, fasteners and washers will withstand 500 lbs of force

Step 1:

Wall Mounting Instructions

Lay the SkiErg on the floor with the flywheel facing up. Install the universal bracket on the SkiErg top bracket. Insert two 1/4”-20 fasteners through the SkiErg top bracket and into the two outer holes of the universal bracket.

Step 2:

Wall Mounting Instructions 2

Hold the SkiErg up against the wall. The two outside holes on the universal bracket should be lined up with the wall studs. Mark each hole location. Also mark each hole location where the SkiErg bottom bracket lines up with the wall (left and right side).

Step 3:

Wall Mounting Instructions 3

Starting at the universal bracket drill a ¼” diameter hole 2” deep at each mark. Assemble a washer on a lag screw and screw into each hole until tight.

BE SURE YOU ARE DRILLING INTO SOLID MATERIAL AND THAT THE SKIERG IS FIRMLY ATTACHED TO THE WALL. INSUFFICIENT ATTACHMENT MAY LEAD TO INJURY!

Step 4:

Wall Mounting Instructions 4

Place a black spacer behind each mounting hole on the SkiErg bottom bracket. Assemble a washer on a lag screw and screw into each mounting hole until tight.

Wall Mounting Instructions for a Wall with Wooden Stud Spacing other

than 16”

Prior to mounting your SkiErg to a wall with stud spacing other than 16” you must provide a solid attachment point by first securing a wooden mounting plate to the wall. This wooden plate should be 1.5” thick and suitable for receiving the lag screws (provided in parts bag) which will hold the SkiErg. You will need to provide lag screws and washers to attach this mounting plate to the wall.

  1. Determine the location of the studs in your wall. Mark the center of the studs. Measure the distance between them.
  2. Make 4 marks on each piece of wood 1” from the top, 1” up from the bottom, and separated by the stud spacing in your wall.
  3. Drill through holes at each of these locations.
  4.  Install the pieces of wood such that the center line of the top piece is 85” above the floor, and the lower piece is resting on the floor. (Note, if you have a wooden baseboard, you may attach the SkiErg directly to the baseboard.)
  5.  You may now follow steps 2–4 from the previous SkiErg mounting instructions using the mounting hardware provided.

Concept2, Inc. 105 Industrial Park Drive Morrisville, Vermont USA 05661 concept2.com/contact

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals