nVent JBS-100-L-A Single-Entry Power Connection with Junction Box Instruction Manual
- June 6, 2024
- nVent
Table of Contents
JBS-100-L-A Single-Entry Power Connection with Junction Box
Instruction Manual
APPROVALS
Hazardous Locations
Class I, Div. 2, Groups A, B, C, D
Class II, Div. 2, Groups E, F, G
Class III
CLI, ZN1, AEx em II T(1)
(JBS-100-L-A only) Ex eb mb IIC T Gb(2)
JBS-100-L-A is IECEx certified for use with:
BTV-CR/BTV-CT: IECEx BAS 20.0011X
QTVR-CT: IECEx BAS 20.0013X
XTV-CT: IECEx BAS 20.0012X
KTV-CT: IECEx BAS 20.0014X
HTV-CT: IECEx PTB 21.0007X
VPL-CT: IECEx BAS 20.0008X
Class I Division 2 (Zone 2**), Groups A, B, C, D
Class I Zone 2 IIC
Ex eb mb IIC T Gb; Class I Zone 1 AEx eb mb IIC T Gb
Ex mb tb IIIC T°C Db; Zone 21 AEx mb tb IIIC T°C Db
-
For system Temperature Code, see heating cable or design documentation
- Except for VPL, HTV (FM approval only)
- Except for KTV-CT
- For HTV-CT only ** Per CE Code Table 18
KIT CONTENTS
Item | Qty | Description |
---|---|---|
A | 1 | Stand assembly |
B | 1 | Core sealer |
C | 1 | Green/yellow tube |
D | 1 | Cable lubricant |
E | 1 | Cable tie |
F | 1 | Lid |
G | 1 | Box with terminal blocks |
H | 1 | JBL-100-R plug-in light module |
DESCRIPTION
The nVent RAYCHEM JBS-100-L-A is a Type 4X-rated power connection kit. It is
designed for use with nVent RAYCHEM BTV-CR, BTV-CT, QTVR-CT, XTV-CT, KTV-CT,
HTV-CT, and VPL-CT industrial parallel heating cables.
The kit includes a plug-in LED light that indicates when the power is supplied
to the heating cable circuit.
This kit may be installed at temperatures as low as –40°F (–40°C). For easier
installation store above freezing until just before installation.
For technical support call nVent at (800) 545-6258.
TOOLS REQUIRED
- Wire cutters
- Adjustable pliers
- Utility knife
- Needle nose pliers
- Large slotted screwdriver
- Marker
- Wire stripper (for VPL-CT)
- 1/4 in or smaller flat-blade screwdriver
ADDITIONAL MATERIALS REQUIRED
- Pipe strap
- GT-66 or GS-54 glass cloth tape
OPTIONAL MATERIALS
- Recommended conduit drain: JB-DRAIN-PLUG-3/4IN P/N 278621-000
- Small pipe adapter for 1 in (25 mm) and smaller pipes: Catalog number JBS-SPA P/N E90515-000
WARNING:
This component is an electrical device that must be installed correctly to
ensure proper operation and to prevent shock or fire. Read these important
warnings and carefully follow all of the installation instructions.
- To minimize the danger of fire from sustained electrical arcing if the heating cable is damaged or improperly installed, and to comply with the requirements of nVent, agency certifications, and national electrical codes, ground‑fault equipment protection must be used. Arcing may not be stopped by conventional circuit breakers.
- Component approvals and performance are based on the use of nVent‑specified parts only. Do not use substitute parts or vinyl electrical tape.
- The black heating cable core and fibers are conductive and can be short. They must be properly insulated and kept dry.
- Damaged bus wires can overheat or short. Do not break bus wire strands when scoring the jacket or core.
- Keep components and heating cable ends dry before and during installation.
- Use only fire‑resistant insulation materials, such as fiberglass wrap and flame‑retardant foam.
CAUTION:
HEALTH HAZARD: Prolonged or repeated contact with the sealant in the core
sealer may cause skin irritation. Wash hands thoroughly. Overheating or
burning the sealant will produce fumes that may cause polymer fume fever.
Avoid contamination of cigarettes or tobacco. Consult MSDS VEN 0058 for
further information.
CHEMTREC 24‑hour emergency telephone: (800) 424‑9300
Non‑emergency health and safety information: Tel: (800) 545‑6258.
1.
- Allow approximately 24 in (60 cm)of heating cable for installation. For VPL, cut cable 12 in (30 cm) from bus indentation.
- Cut off the heating cable end at about 45° for easier insertion.
2.
- Optional: If the stand is to be installed on the bottom side of the pipe, knock out the drain hole prior to inserting the cable.
- With the label on the stand facing the desired direction of the box opening, push 18 in (45 cm) of heating cable through the stand. Use cable lubricant if needed.
- Square off cable end with 90° cut.
3.
- Lightly score the outer jacket around and down as shown.
- Bend heating cable to break jacket at the score, then peel off jacket.
4.
6.
- Mark the jacket as shown.
7.
CAUTION: Health Hazard.
Wash hands after contact with sealant. Consult material safety data sheet VEN
0058.
- If needed, re-twist and straighten bus wires, then insert them into the guide tubes as shown.
8.
- Push core sealer onto the heating cable to the mark made in step 6.
Note: Extra force may be required for larger cables or at lower temperatures.
9.
- Remove the guide tubes and dispose of them in a plastic bag.
10.
-
Slip the green/yellow tube onto the braid.
Heat-shrinking is not required. -
Trim bus wires and braid.
11.
- Pull the heating cable back into a stand so 1 in (25 mm) is exposed as shown. Use cable lubricant if needed.
12.
- Fasten stand to pipe with the label facing the desired direction of the box opening. Do not pinch the heating cable.
- Loop and tape the extra heating cable to the pipe.
CAUTION: To avoid pinching the heating cable, be sure the cable is not under the pipe strap.
13.
- Screw the box onto the stand until it stops. Do not overtighten.
14.
(Optional) To change the direction of box opening:
- Loosen locknut using adjustable pliers.
- Lift box and rotate. Make sure the tab on the threaded piece fits into one of the four notches in the box.
- Tighten locknut.
15.
- Insert cable tie through slots on stand and box, and tighten firmly to prevent box rotation.
16.
This kit uses spring clamp-style terminals.
Terminals use a steel spring to clamp the wire to provide improved vibration
resistance, reduced maintenance, and faster installation.
To connect wires, firmly insert a slotted screwdriver into the square hole ( 1
2 ) to open the spring. When fully inserted, the screwdriver will lock into
place, allowing you to remove your hand and insert the wire into the round
hole (1 2 ). Remove the screwdriver to clamp the wire. The wire is held
securely against the bus bar for low contact resistance over time without the
need to periodically retighten screws.
17.
- Install conduit and fittings as shown. To minimize loosening due to pipe vibration, use a flexible conduit.
- Pull in power and ground wires, strip off 1/2 in (13 mm) of insulation, and terminate.
18.
- Plugin the light module in the terminal blocks marked L and N as shown.
(For simplicity the connected wires in the terminal blocks are not shown in this step.)
19.
- Install lid.
- Apply insulation and cladding.
- Weather-seal the standing entry
- Leave these instructions with the end-user for future reference.
WARNING : Explosion Hazard- Substitution of Components May Impair
Suitability for Class I Division 2 (Zone 2)
WARNING: Explosion Hazard- Do Not Disconnect Equipment Unless Power has
been Switched Off or The Area is Known to be Non-Hazardous.
North America
Tel +1.800.545.6258
Fax +1.800.527.5703
thermal.info@nVent.com
Europe, Middle East, Africa
Tel +32.16.213.511
Fax +32.16.213.604
thermal.info@nVent.com
Asia Pacific
Tel +86.21.2412.1688
Fax +86.21.5426.3167
cn.thermal.info@nVent.com
Latin America
Tel +1.713.868.4800
Fax +1.713.868.2333
thermal.info@nVent.com
nVent.com/RAYCHEM
©2021 nVent. All nVent marks and logos are owned or licensed by nVent Services
GmbH or its affiliates. All other trademarks are the property of their
respective owners.
nVent reserves the right to change specifications without notice.
R AYCHEM-IM-H59057-JBS100L A-EN-2111
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>