Q CELLS Q.PEAK DUO L-G7.X Solar Panel User Manual
- June 5, 2024
- Q CELLS
Table of Contents
Q.PEAK DUO L-G7.X Solar Panel
INSTALLATION AND
OPERATION MANUAL
Q.PEAK DUO L-G7.X solar module series
INTRODUCTION
With solar modules from Hanwha Q CELLS GmbH (hereafter referred to as “Q CELLS”), you can directly transform the sun’s limitless energy into environmentally-friendly olar electricity. In order to ensure the maximum performance of your Q CELLS solar modules, please read the following instructions carefully and observe all guidelines. Non- compliance may result in damage and/or physical injury. Sa
This installation and operation Manual (hereafter also referred to as the “Manual”) provides instructions for the safe installation and operation of crystalline solar modules.
- Please read these instructions carefully before proceeding with your installation.
- Please retain these instructions for the life of the solar modules.
- Please ensure that this Manual is available to the operator at all times.
- This Manual should be given to all subsequent owners or users of the solar modules.
- All supplements received from the manufacturer should be included.
- Please observe all other applicable documents.
- If your questions are not satisfactorily answered in the Manual, please contact your system supplier.
Additional information can be found on our website at www.q-cells.com.
Intended Use
This Manual is valid for Africa, Asia, Europe, Latin America, and South
America. These instructions contain information regarding the safe handling
and use of quality crystalline solar modules from Q CELLS and their
installation, mounting, wiring, maintenance and disposal.
Symbols and Labels
The following symbols and labels are used throughout the Manual for ease of
use.
SYMBOL | DESCRIPTION |
---|---|
The procedure with one or more steps. | |
Lists of items. | |
Ensure that when carrying out a procedure, you check the results of said |
procedure.
| Prohibited.
| Beware of possible danger or damage. Categories:
• Danger: Risk of fatal injury
• Attention: Risk of serious injury or damage to property
• Note: Risk of damage to the product
---|---
Safety Regulations
In particular, the installer, as well as the operator of a module, is
responsible for compliance with all applicable statutory requirements and
regulations.
Unless otherwise specified by any laws or regulations, the following
stipulations must be upheld at all times during the installation, operation,
and maintenance of the solar modules:
- This Manual.
- Other applicable stipulations (such as country-specific regulations for pressure equipment, operational safety, hazardous goods, and environmental protection).
- Regulations and requirements are specific to the system.
- Any applicable laws and requirements, in particular international, country-specific, regional laws and stipulations governing the planning, installation, and operation of solar power systems and work on roofs.
- Any valid international, national, and regional regulations governing work with direct current, especially those applicable to the installation of electrical devices and systems, and regulations issued by the respective energy provider governing the parallel operation of solar power systems.
- Any international, country-specific, and regional accident-prevention regulations.
- Other applicable stipulations are provided by the relevant national institutions regarding safety in the installation and operation of electrical items. For example, in Germany the Bau-Berufsgenossenschaft (German institution for statutory accidence insurance and prevention in the building trade).
Qualified and Skilled Personnel
Both, the installer and operator are responsible for ensuring that the installation (including connection to the grid), maintenance, and dismantling are carried out by trained and qualified specialists with approved training certificates (issued by a state or federal organization) for the respective specialist trade. Electrical work may only be performed by an officially certified tradesperson in accordance with the stipulations applicable in the relevant country with regard to standards and regulations (in Germany e. g. DIN standards, VDE regulations) and the stipulations of the local grid operator and/or energy provider.
Validity
These instructions are only valid for crystalline solar modules from the company Q CELLS as specified at chapter „2.1 Technical Specifications“. Q CELLS assumes no liability for damage resulting from failure to observe these instructions.
- Please observe the wiring and dimensioning of the system.
- The installer of the system is responsible for compliance with all necessary safety regulations during set-up and installation. Q CELLS assumes no liability on the basis of these instructions. Q CELLS is only liable in the context of contractual agreements or in the context of accepted guarantees. Q CELLS accepts no other responsibility for the functionality and safety of the modules.
- Please observe the instructions for any other system components that may be part of the complete solar power system. It may be necessary to carry out a structural analysis for the entire project.
- If your questions are not satisfactorily answered in the Manual, please contact your system supplier.
Additional information for the Operator
- Please keep this Manual for the entire life of the solar power system.
- Please contact your system supplier for information concerning the formal requirements for solar power systems.
- Please be sure to contact the relevant local authorities and energy providers regarding regulations and permit requirements prior to the installation of the solar power system. Your financial success depends on the fulfillment of these requirements.
Other applicable documents
In addition to this Manual following technical information are relevant:
DOCUMENT TYPE
Product data sheet
Packaging and transport information
MISUSE OR INCORRECT USE OF SOLAR MODULES VOIDS THE LIMITED WARRANTY AND MAY CREATE A SAFETY HAZARD AND RISK PROPERTY DAMAGE. THIS INCLUDES IMPROPER INSTALLATION OR CONFIGURATION, IMPROPER MAINTENANCE, UNINTENDED USE, AND UNAUTHORIZED MODIFICATION.
PLANNING
TECHNICAL SPECIFICATIONS
PRODUCT LINE| Q.PEAK DUO L-G7| Q.PEAK DUO L-G7.1| Q.PEAK DUO L-G7.2| Q.PEAK
DUO L-G7.3
---|---|---|---|---
Type| Q.ANTUM DUO| Q.ANTUM DUO| Q.ANTUM DUO| Q.ANTUM DUO
Length| 2015 mm| 2015 mm| 2015 mm| 2015 mm
Width| 1000 mm| 1000 mm| 1000 mm| 1000 mm
Frame height| 35 mm| 35 mm| 35 mm| 35 mm
Area| 2.02 m²| 2.02 m²| 2.02 m²| 2.02 m²
Weight| 23.0 kg| 23.5 kg| 23.5 kg| 23.0 kg
Max. system voltage V SYS| 1000 V (IEC) / 1000 V (UL)| 1000 V
(IEC) / 1000 V (UL)| 1500 V (IEC) / 1500 V (UL)| 1500 V (IEC) / 1500 V (UL)
Max. reverse current| 20 A| 20 A| 20 A| 20 A
Permissible temperature range| –40 °C to +85 °C (–40 °F bis +185 °F)
Junction box protection class| ≥ IP67 with bypass diode
Connector protection class| IP67 or IP68
Fire rating based on ANSI / UL 1703| C / Type 2| C /
Type 2| C / Type 1| C / Type 1
Max. test load Push/Pull 1| 5,400 Pa / 2,400 Pa| 5,400 Pa /
2,400 Pa| 5,400 Pa / 2,400 Pa| 5,400 Pa / 2,400 Pa
Max. design load Push/Pull 1| 3,600 Pa / 1,600 Pa| 3,600 Pa /
1,600 Pa| 3,600 Pa / 1,600 Pa| 3,600 Pa / 1,600 Pa
Middle rail| No| Yes| Yes| No
Certificates| CE-compliant; IEC 61215:2016; IEC 61730:2016; PV module
classification: Class II; UL 61730
1 Test and design load in accordance with IEC 61215:2016, depending on
mounting options (see section „2.3 Mounting Options“)
Fig. 1: External dimensions (in mm) and components for Q.PEAK DUO L-G7 and Q.PEAK DUO L-G7.3| Fig. 2: External dimensions (in mm) and components for Q.PEAK DUO L-G7.1 and Q.PEAK DUO L-G7.2
REQUIREMENTS
Installation Site
Please note the following guidelines that apply to the installation site:
- The modules have been tested according to IEC 61215.
- Solar modules are not explosion-proof and are not suitable for use in explosive environments.
- Do not operate solar modules near highly flammable gas and vapors (e.g. gas tanks, gas stations).
- Do not install modules in an enclosed space.
- Do not install modules in locations where they may be submerged in water (e.g. floodplains).
- Do not use modules as a substitute for the normal roofing (e.g. modules are not watertight).
- Do not install modules in close proximity to air conditioning systems.
- Do not install modules above 4,000 m (13,120 ft) altitude above sea level.
- In locations with increased salt content in the air (e.g. close to the sea) special precautions must be taken (see „Grounding“ and „Maintenance and Cleaning“).
- Do not bring any chemical substance (e.g. oil, solvent, etc.) into contact with any part of the panel. Only substances that are released by Q CELLS are allowed to be used during installation, operation, and maintenance.
- Any installation of modules on surfaces of water is prohibited. This includes installations on floating as well as pile-based platforms. Q CELLS may extend the coverage of its warranty to such installations, based on a case-by-case assessment of the system design and location. Prior written consent by the warrantor is required in any case.
The solar modules are designed for the following applications:
- Operating temperatures from –40 °C to +85 °C (–40 °F to +185 °F).
- Pull loads up to max. 2,400 Pa and push loads up to max. 5,400 Pa (Test-load in accordance with IEC 61215, see chapter „Mounting Options“).
- Installation using a mounting structure for solar modules.
Prevention of Shadowing Effects
Optimal solar irradiation leads to maximum energy output:
- For this reason, install the modules so that they face the sun.
- Avoid shadowing (due to objects such as buildings, chimneys, or trees).
- Avoid partial shading (for example through overhead lines, dirt, snow).
Mounting Structure Requirements
The Modules shall be installed and operated on mounting structures that comply
with any applicable laws and stipulations as well as with the following:
- Conform to the necessary structural requirements.
- Compliant with local snow and wind loads.
- Properly fastened to the ground, the roof, or the façade.
- Forces acting on the module are relayed to the mounting substructure.
- Ensures sufficient rear ventilation of the module.
- Avoid the usage of different metals to prevent contact corrosion.
- Allows for stress-free expansion and contraction due to temperature fluctuations.
- Ensure that no additional forces are applied through the mounting system into the module except for the wind and snow loads. Additional forces and moments of torque at the mounting positions caused by torsions, displacements or vibrations in the mounting system are not allowed.
- Ensure that the clamps and the mounting frame are compatible.
Clamp System Requirements
Use customary clamps that satisfy the following requirements:
- Clamp width: ≥ 38 mm.
- Clamp height compliant with a 35 mm frame height.
- Clamp depth: 5-12 mm. (applicable for all CL and TC clamping mounting options in the section „2.3 Mounting Options“)
- Clamps are not in contact with the front glass.
- Clamps do not deform the frame.
- Clamps that satisfy the structural requirements of the installation site.
- Long-term stable clamps that securely affix the module to the mounting frame.
Module Orientation Requirements
- Vertical or horizontal installation is permitted.
- Ensure that rain and melting snow can run off freely. No water accumulation.
- Ensure that the drainage holes in the frame are not covered. No sealing.
- Maintain the permissible angle of inclination.
- Minimum angle of inclination: 3°
- Inclination angles above 75° may be limited by local regulations
- ≥ 20°: self-cleaning effect
- Follow the directions for installation angles < 5° („Grounding“, page 19)
MOUNTING OPTIONS
Fig. 3: Installation options for crystalline Q CELLS modules. All
dimensions are given in mm. Also, observe the maximum test loads and clamping
range as specified on page 9.
The illustrated installation options apply for both horizontal and vertical
module orientation.
TYPE OF INSTALLATION | MODULE | POINT MOUNTING SYSTEM | LINEAR MOUNTING SYSTEM |
---|---|---|---|
INSTALLATION WITH CLAMPS | Q.PEAK DUO L-G7.X | ![Q CELLS Q PEAK DUO L G7 X Solar |
Panel - fig 3](https://manuals.plus/wp-content/uploads/2022/04/Q-CELLS-Q-PEAK-
DUO-L-G7-X-Solar-Panel-fig-3-408x550.png)|
HYBRID CLAMPING| Q.PEAK DUO L-G7.X| |
INSTALLATION ON MOUNTING POINTS| Q.PEAK DUO L-G7.X| |
INSTALLATION WITH INSERTION PROFILES| Q.PEAK DUO L-G7.X| NOT PERMITTED|
---|---|---|---
TRACKER
INSTALLATION
ON MOUNTING
POINTS| Q.PEAK DUO L-G7.1
Q.PEAK DUO L-G7.2| |
TRACKER
INSTALLATION
WITH CLAMPS| Q.PEAK DUO L-G7.1
Q.PEAK DUO L-G7.2| |
Specifications
MODULE TYPE| MOUNTING OPTION| POSITION OF CLAMPS* [MM]| TEST LOAD PUSH/PULL
[PA]| DESIGN LOAD PUSH/PULL [PA]| SAFETY FACTOR
---|---|---|---|---|---
Q.PEAK DUO L-G7.X| CL1| 250 – 500| 5400 / 2400| 3600 /
1600| 1.5
FB1| 353.5
CL3| 250 – 500| 3600 / 2400| 2400 / 1600
IP1| –| 3600 / 2400| 2400 / 1600
CL1| 0 – 250| 2400 / 2400| 1600 /1600
CL5| short side: 100 – 250
long side: 250 – 500| 2400 / 2400| 1600 / 1600
Q.PEAK DUO L-G7.1 Q.PEAK DUO L-G7.2| TB1| 807.5 at
Tracker holes| 2400 / 2400| 1600 /1600
TC1| 800 – 860| 2400 / 2400| 1600 /1600
The below mounting options are only possible under certain conditions.
MODULE TYPE| MOUNTING OPTION| POSITION OF CLAMPS* [MM]| TEST LOAD PUSH/PULL
[PA]| DESIGN LOAD PUSH/PULL [PA]| SAFETY FACTOR
---|---|---|---|---|---
Q.PEAK DUO L-G7.X| CL2a (with rails)| 0 – 300**| 2400 /
1600| 1600 / 1067| 1.5
CL2b (without rails)| 0 – 300| 1800 / 1600| 1200 / 1067
IP2**| –| 1800 / 1600| 1200 / 1067
- Distance between the outer edge of module and middle of the clamp (see table „2.3 Mounting Options“ on page 7).
** Loads according to IEC 61215-2:2016 and UL 1703.
* Test procedure according to IEC 61215-2:2016 and UL 1703. Mounting options do not fulfill the requirements of the standards.
** Rails must not be under the junction box.
ATTENTION
- The loads in the table are related to the mechanical stability of the solar modules. The mechanical stability of the mounting system including clamps has to be evaluated by the system supplier. The Q CELLS listed test load values were determined with the following clamp parameters: clamp width = 40 mm and clamp depth = 10 mm. The system installer is responsible for the determination of location-specific load requirements.
- Ensure, that the sub construction does not touch the junction box (even under load). Ensure that the clamps or insertion profiles etc. do not touch the glass (even under load).
- Ensure, that the connection cables of the junction box do not run between laminate and mounting rails.
- Ensure, a minimum support depth of 20 mm on the backside of the module for IP1, IP2, CL2b and CL5. Ensure a minimum support depth of 10 mm on the front side of the module for IP1 and IP2.
- CL1, CL2, and CL3 with rails: Ensure that the module frame is fixed directly on the rail of the substructure (no spacer allowed between the module and substructure).
- Module bend under loads. Therefore, sharp objects (e.g. screws) must not be mounted near the module backside.
- Use M8 corrosion-proof screws and washers (diameter ≥ 15.8 mm) for FB1 mounting.
- Use M6 corrosion-proof screws and washers (diameter ≥ 13.2 mm) for TB1 mounting.
ELECTRICAL LAYOUT
Module Selection
For detailed key electrical data, please refer to the actual datasheet
referring to the relevant module (available at
www.q-cells.com).
Ä For maximum energy yields, mismatches of specified electric current (IMPP)
of more than 5 % should be avoided for all modules connected in series.
Safety Factor
During normal operation, a module may generate a greater current and/or higher
voltage than that determined under standardized test conditions. Please use a
safety factor of 1.25 for the following:
- Calculating the voltage measurement values (VOC) of components
- Calculating the current measurement values (ISC) of conductors
- Sizing of control systems connected to the outlets of the solar modules
- Please follow the valid national guidelines for the installation of electrical systems.
Series Connection
The connection of modules in series is only permitted up to the maximum system
voltage as listed in the applicable datasheet of all the relevant modules to
be installed.
- Take into account all possible operating situations and all relevant technical norms and regulations when designing the system. It has to be ensured that the maximum system voltage, including all necessary safety margins, is not exceeded.
- Take the voltage limit of the inverter into account when determining the maximum number of modules in the string.
Parallel Connection
Modules may be damaged by the occurrence of reverse currents (caused by module
defects, ground leaks or defective insulation).
- Ensure that the maximum reverse current load capacity indicated in the data-sheet is met.
In order to limit reverse currents that may occur, we recommend using the following safety options:
1) Layout with a limited number of parallel-connected strings :
Without undertaking further current blocking measures, a maximum of two module
strings may be operated in parallel on a single inverter or MPP tracker.
2) Layout with string fuses :
Place fuses for each string of modules at the plus and minus ends.
Use PV-fuses according to IEC 60269-6. Observe the maximum permitted number of
strings as indicated in the specifications provided by the respective string
fuse manufacturer and the technical guidelines.
NOTE!
When installing different product versions, the lowest minimum permitted
reverse current load capacity applies.
Inverters
Inverters with or without transformers may be used.
INSTALLATION
SAFETY AND TRANSPORT
|
---|---
Ensure that all personnel are aware of and adhere to accident prevention and
safety regulations.
While working wear clean gloves.| Danger! Risk of fatal injury due to electric
shock!
Do not install damaged modules.
Inform your distributor of any damages immediately.
|
Inspect the packaging for damages.
Contact the transport company regarding any damage to the packaging and follow
their instructions.
Follow any instructions on the packaging.| Warning! Fire Risk!
Do not install modules indoors.
Do not install modules on moving objects.
Leave modules in their original packaging until installation.
Store the modules securely in cool and dry rooms. The packaging is not
weatherproof.
| |
---|---|---
Note! Module damage may occur!
Never lift or move the module with the connection cables or junction box.
Carry modules upright and horizontally as shown.| Note! Module damage may
occur!
Never step on modules.
Do not subject modules to any mechanical stress.
Do not allow any objects to fall onto modules| Note! Module damage may occur!
Do not drop modules.
| |
Note! Module damage may occur!
Only make modifications to the module which have been confirmed in writing by
Q CELLS.| Note! Module damage may occur!
Do not stack modules.| Note! Module damage may occur!
Do not install modules near flammable gas/vapors.
Do not install modules in close proximity to air conditioning systems.
| |
---|---|---
Danger! Risk of fatal injury due to electric shock!
Block off the installation zone.
Keep children and unauthorized individuals away from the solar power system.|
Warning! Risk of injury due to falling modules!
Secure modules during installation.
Do not install modules in windy or wet weather.| Danger! Risk of fatal injury
due to electric shock!
Only use dry, insulated tools.
| |
Do not carry out the installation alone.| Danger! Risk of fatal injury due to
electric shock!
Ensure that modules and tools are not subject
to moisture or rain at any time during installation.| • Only install undamaged
modules and components.
Do not modify the module (e.g. do not drill any additional holes).
MODULE INSTALLATION
|
---|---
Option 1:
Fasten the module with 4 clamps in the specified clamping range, see Fig. 3,
p. 7.
Tighten clamps according to the manufacturer’s instructions.| Maintain an
interval of at least 10 mm between two modules along the short side and 5 mm
along the long side.
|
Option 2:
Install the module at the 4 mounting points, see Fig. 3, p. 7.
Tighten screws according to manufacturer’s instructions.| Note! Module damage
may occur!
Do not subject modules to a mechanical tension.
Max. torsion 10 mm/m.
Option 3:
Install the module using mounting profiles, see Fig. 3, p. 7.
SAFETY
DANGER!
Risk of fatal injury due to electric shock!
When disconnecting an electric circuit carrying direct current, electric arcs can occur that may result in life-threatening injuries.
- Do NOT unplug the cable when under load.
- Do NOT connect any exposed cable ends.
- Electrical work may only be performed by qualified and skilled personnel (see page 3).
A solar module generates electrical current and voltage even at a low intensity of illumination. Sparks and electric arcs may result from the separation of a closed circuit. These can result in life-threatening injuries. The danger increases when several modules are connected in series.
- Please be aware that the entire open circuit voltage is active even at low levels of solar irradiation.
- Please follow the valid national regulations and safety guidelines for the installation of electrical devices and systems.
- Please make sure to take all necessary safety precautions. With module or phase voltages of more than 120 V, the safety extra-low voltage range is exceeded.
- Carry out work on the inverter and the wiring with extreme caution.
- Ensure that the modules are disconnected at the inverter prior to separation.
- Be sure to observe the time intervals specified by the inverter manufacturer after switching off the inverter.
- Make sure that the plugs can not be connected unintentionally.
- Before working on the contacts, check them for safety extra-low voltage.
|
---|---
Danger! Risk of fatal injury due to electric shock!
Never open the junction box.
Do not remove bypass diodes.| Danger! Risk of fatal injury due to electric
shock!
Never touch live contacts with bare hands.
Cover connectors by suitable protective caps until installation.
|
Danger! Risk of fatal injury due to electric shock!
Only use dry, insulated tools for electrical work.| Danger! Risk of fatal
injury due to electric shock!
Insulate any exposed cable ends.
Only connect cables with plugs.
ELECTRICAL CONNECTION
ELECTRICAL INSTALLATION SAFETY
|
---|---
Danger! Risk of fatal injury due to electric shock!
Electrical work may only be performed by qualified and skilled personnel (see
page 3).
Ensure correct polarity.| Danger! Risk of fatal injury due to electric shock!
Ä Never plug or unplug the cable when under load. Modules must not carry any
current.
1. Switch off the inverter.
|
Danger! Risk of fatal injury due to electric shock!
Be sure to maintain the time intervals as specified by the inverter
manufacturer between switching off the inverter and beginning any further
work.| 2. Switch off the DC circuit breaker.
3. Measure shutdown in DC String. (no DC current flow).
4. Disconnect plugs by the use of appropriate and qualified tools of the
manufacturer.
5. When connecting the modules proceed in reverse order.
CONNECTION OF MODULES
|
---|---
Use solar cables for the connection at the junction box outlet.
Use the same, inverter-compatible plugs.
Use minimum 4 mm 2 copper wires insulated for a minimum of 90 °C for field
connections.| Note! Module damage may occur!
Ensure that the cabling is not under mechanical stress (Comply with a bending
radius of ≥ 60 mm).
Ensure that the cables do not run between module and mounting rail or
structure (danger of pinch).
|
Danger! Risk of fatal injury due to electric shock!
Ensure that all electrical components are in a proper, dry, and safe
condition.| Do not connect modules with different orientations or angles of
inclination in the same string.
Ensure for a tight connection between the plugs. Plugs click together audibly.
AFTER INSTALLATION
| |
---|---|---
Ensure that all necessary safety and functional tests have been carried out
according to applicable standards.| Note! Module damage may occur!
Ensure that the plug connections are secured away from any water-channeling
surface.| Integrate the system into the existing lightning protection system
in accordance with the applicable local regulations.
| |
Warning! Fire Risk!
Do not use light concentrators (e.g. mirrors or lenses).| Ensure that the
cabling is not exposed and/or hanging and is protected from dirt, moisture and
mechanical friction.| No dry cleaning or use of rotating brushes.
Modules must be cleaned manually and only with sufficient Water.
GROUNDING
Protective Grounding
The modules must be grounded in accordance with the local statutory
regulations.
Functional grounding
- For installations located in tropic regions (between 23.5° N and 23.5° S) with a module tilt of < 5°, functional grounding at the negative generator connection on the DC side must be implemented.
- Ensure that the difference of potential between the negative generator connection and the local earth potential (e.g. substructure, PE of the inverter) on each string in operation mode is positive or 0 V.
- Follow the directions of the inverter manufacturer and local statutory regulations.
- Only use inverters which include licensed grounding kits.
- Functional grounding has also to be implemented in installation sites with increased salt content in the air. (e.g. close to the sea).
FAULTS AND DEFECTS
DANGER!
Risk of fatal injury due to electric shock!
- Do not attempt to fix any problems yourself (e.g., glass cracks, damaged cables).
- Please contact an installer or Q CELLS Technical Customer
Service Department.
DISPOSAL
- Do not disconnect modules by yourself.
- Please contact an installer or Q CELLS Technical Customer Service Department.
- Dispose of modules in accordance with the local disposal regulations.
MAINTENANCE AND CLEANING
Q CELLS solar modules are known for long operating life and minimal maintenance effort and expense. Dirt and grime are usually washed away by rain. If the module is fully or partially shaded by dirt or debris (e.g., plants, bird droppings), it needs to be cleaned to prevent a loss of performance.
Maintenance
- The PV system has to be inspected regularly by certified personnel
- The time intervals and extent of the inspection can depend on local circumstances (e.g. salt, ammonia content in the air, high humidity, etc.). The customer/operator must inform himself about time intervals and extend of necessary inspections.
- Inspections have to be performed especially after extraordinary events (e.g. storm, hail, high snow loads, etc.)
- During the inspections, it has to be checked that the components are secure, undamaged and clean
Cleaning
WARNING!
Risk of injury due to hot and live modules!
- Only clean modules that have cooled down.
- Do not carry or wear any electrically conductive parts.
WARNING!
Risk of falling due to unsecured access!
- Never access the installation area alone or without taking adequate security precautions.
- Please commission a trade specialist.
NOTE!
Module surface damage may occur!
- Remove snow and ice carefully without force (e.g. with a very soft broom).
- Do not scratch off the dirt.
- Rinse dirt (dust, leaves, etc.) off with lukewarm water or use an alcohol-based glass cleaner. Do not use abrasive detergents or surfactants.
- Use a soft cellulose cloth (kitchen roll) or sponge to carefully wipe off stubborn dirt. Do not use microfleece wool or cotton cloths.
Isopropyl alcohol (IPA) can be used selectively to remove stubborn dirt and stains within one hour after emergence.
- Please follow the safety guidelines provided by the IPA manufacturer.
- Do not let IPA run down between the module and the frame or into the module edges.
|
---|---
Note! Module damage may occur!
Do not clean modules with water if there is a risk of frost.| Remove dirt with
lukewarm water or alcohol-based glass cleaner, a broom, or a soft cloth.
Do not use surfactants, rotating brushes, scrapers, or any high-pressure water
cleaning equipment.
Free the substructure from any dirt and debris (leaves, bird nests, etc.).
HANWHA Q CELLS GMBH
OT Thalheim
Sonnenallee 17 – 21
06766 Bitterfeld-Wolfen
Germany
TEL +49 (0)3494 66 99 – 23222
FAX +49 (0)3494 66 99 – 23000
EMAIL sales@q-cells.com
WEB www.q-cells.com
Subject to change without notice. © Q CELLS Installation manual solar modules Q.PEAK DUO L-G7.X_2020-03_Rev02_EN
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>