Separett CINDI Basic Incinerating Toilet Instruction Manual

June 5, 2024
Separett

Separett CINDI Basic Incinerating Toilet

Separett-CINDI-Basic-
Incinerating-Toilet-product

Installation

Separett-CINDI-Basic-Incinerating-Toilet-
fig-1

  1. 90° bend
  2. Condensation hose
  3. Connection pipe 70 mm
  4. Ventilation cowl
  5. Drilling templateSeparett-CINDI-Basic-Incinerating-Toilet-fig-2

The condensation hose is only installed when installed indoors to drain condensate water. When mounting on installation outdoors there is a risk that the condensate water in the hose will freeze during winter.Separett-CINDI-
Basic-Incinerating-Toilet-fig-3

IMPORTANT

  • Cindi® Basic must be installed correctly both in order for it to function and for the warranty to apply. There are regulations both indoors and outdoors for the installation. Follow the instructions carefully.
  • Cindi® Basic needs regular service to function properly. You will get a message on the display when it is time to service the toilet. Contact your nearest service center.
  • Cindi® Basic must be used correctly to function properly. Only bags like the ones you get with the toilet should always be used each time you use the toilet and only urine, solid waste and toilet paper may be incinerated. Always push the incineration button after you have used the toilet. Follow the instructions for using the toilet carefully.

There must not be any other ventilation system, such as a fan or similar, in the space where the toilet is placed.Separett-CINDI-Basic-Incinerating-
Toilet-fig-4

  • The incinerating toilet must be placed on a flat surface without carpet under or in front of the toilet.
  •  The ventilation pipes may only be installed straight out and straight up behind the toilet. It is not allowed to install the pipes diagonally.Separett-CINDI-Basic-Incinerating-Toilet-fig-5
  • Only Ø110 mm vent. pipes made of plastic, 1pcs 90° long bend, and 2pcs 45° connectors (to go around the roof ridge) may be used in the installation.
  • In order for the airflow to be optimal, the 90° long bend and ventilation cowl included must be installed. The windshield is mounted by passing it about 4cm above the ventilation tube, until the edge on the inside receives. In use of another long bend or ventilation cowl, the warranty does not apply
  • The gaskets are placed on the connection on the back of the toilet. Their purpose are to fit tightly between the toilet and the vent tube to prevent air and odor should come out in the space where the toilet is placed.Separett-CINDI-Basic-Incinerating-Toilet-fig-8
  • To prevent the outgoing air from flowing back into the space where the toilet is placed, do not place the air intake (fresh air valve) and the vent outlet (vent cowl) too close together.Separett-CINDI-Basic-Incinerating-Toilet-fig-9
  • Fresh air valve may only be placed on an exterior wall. Placement in the floor or ceiling is not approved.
  • You can choose from three different options to install your incinerating toilet.Separett-CINDI-Basic-Incinerating-Toilet-fig-11
  • NOTE! Only Ø110 mm vent.pipes made of plastic, 1pcs 90° long bend and 2pcs 45° connectors (to go around the roof ridge) may be used in the installation.Separett-CINDI-Basic-Incinerating-Toilet-fig-12

Option

Separett-CINDI-Basic-Incinerating-Toilet-
fig-13 Separett-CINDI-Basic-Incinerating-Toilet-
fig-14

  • A Connectionpipe (horizontal) max 500 mm, install with 2° inclination backwards from the toilet. Min 100 mm between the toilet and the wall.
  • B Max 5 meters in total length from the 90° bend.
  • C Max 500 mm above the roof.
  • Ventilation valve is placed on an outerwall. If placed directly behind the toilet, underneath the ventilation pipe, min 110 mm Ø, if placed elsewhere min 160 mm Ø.

NOTE:  Only Ø110 mm vent.pipes made of plastic and 1pcs 90 ° bend may be used in the installation.

Option

  • Separett-CINDI-Basic-Incinerating-Toilet-fig-15 Separett-CINDI-Basic-Incinerating-Toilet-fig-16A Connectionpipe (horizontal) max 500 mm, install with 2° inclination backwards from the toilet. Min 100 mm between the toilet and the wall.
  • B Max 4,5 meters in total length from the 90° bend.
  • C Max 500 mm and min. 300 mm between the 45° bends to go around the roof ridge.
  • D Max 500 mm above the roof.
  • Ventilation valve is placed on an outerwall. If placed directly behind the toilet, underneath the ventilation pipe, min 110 mm Ø, if placed elsewhere min 160 mm Ø.

NOTE:  Only Ø110 mm vent.pipes made of plastic, 1pcs 90° long bend and 2pcs 45° connectors may be used in the installation.Separett-CINDI-Basic-
Incinerating-Toilet-fig-17

Option

Separett-CINDI-Basic-Incinerating-Toilet-fig-18

  • A Use the supplied short connection pipe (70 mm) between the toilet and the 90° bend.
  • B Max 5 meters in total length from the 90° bend.
  • C Max 500 mm above the roof.
  • D Attach the supplied hose on the drain tap on the 90° bend to divert condensation.
  • Ventilation valve is placed on an outerwall, min 160 mm Ø

NOTE! Only Ø110 mm vent.pipes made of plastic and 1pcs 90° long bend may be used in the installation. When installing a 90 ° bend tube directly behind the toilet, 30 cm space is required for installation behind the toilet Separett-CINDI-Basic-Incinerating-Toilet-fig-20

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Separett User Manuals

Related Manuals