abi FORCE Z-23 Aerator Zero-Turn Infield Groomer and Laser Grader User Guide

June 5, 2024
abi FORCE

abi FORCE Z-23 Aerator Zero-Turn Infield Groomer and Laser

abi FORCE Z-23 Aerator Zero-Turn Infield Groomer and Laser
Grader

Parts

  1.  Single Chain Link
  2.  11 Link Chain
  3.  Snap Hook
  4.  ¼” x 1” long Bolt (2)
  5.  5/16” Washer (2)
  6.  ¼” lock nut
  7.  Chain Cover
  8.  Zip Tie (2)
  9.  7/8” Hitch Pin
  10. . 3/8” Lynch Pin

TOOLS

7/16” wrench (2), diagonal cutters

Setup

  1.  Slide Chain Cover over 11 Link Chain and secure with Zip Ties on ends.abi FORCE Z-23 Aerator Zero-Turn Infield Groomer and Laser Grader 1
  2.  Attach Snap Hook to end of Chain, trim Zip Tie ends.abi FORCE Z-23 Aerator Zero-Turn Infield Groomer and Laser Grader 2
  3.  Under the front of the Force, install the Lynch Pin on the connection pin already attached.abi FORCE Z-23 Aerator Zero-Turn Infield Groomer and Laser Grader 3
  4.  Under the mid point of the Force install the 11 Link Chain assembly using ¼” hardware. Make sure the 5/16 washer clamps the end chain link to the frame as shown. The chain should hang on the right side of the cylinder.abi FORCE Z-23 Aerator Zero-Turn Infield Groomer and Laser Grader 4
  5.  The single link mounts the same way on the left side of the machine at the highest point.abi FORCE Z-23 Aerator Zero-Turn Infield Groomer and Laser Grader 5
  6.  Connect Snap Link to Single Chain Link for storage, being sure not to capture any hoses.abi FORCE Z-23 Aerator Zero-Turn Infield Groomer and Laser Grader 6

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals