POLAR ESS HY3.6 GL Hybrid Solar Inverter
Components
- Bottom cover
- Status LED
- LCD screen
- Push button
- Battery port
- PV switch
- PV port
- Communication ports
- USB port
- EPS connector
- Battery earth point
- AC IN grid connector
Clearance
Ensure that there is a minimum of 400mm clearance space around the inverter.
Wall mounting
Be careful to avoid pipes and electrical cables when punching holes into the wall.
System overview
- You must consider the suitable positioning of the battery and the PV.
- You can choose CT or smart meter to connect to the inverter. If there are strict requirements on the limited export power, a smart meter is recommended.
Earth connection
Main earth connection should be connected to the grid tied terminal block.
Note : The earth bond point on the bottom of the inverter is designed for
connection to the battery and additional earth bonding.
Battery terminal connection
- Properly crimp ring terminals to power cables
- Ensure connection is tight and the ring terminal cannot move
PV connection
- Please make sure the PV input voltage/current isn’t beyond the specification
- When installing the PV terminal, pay attention to the positive and negative terminals and one-to-one correspondence between the terminals and inverter. Follow the labelling underneath the connection points
AC connection
- Grid tied connections are on the right-hand side
- If using the back-up connect on the left-hand terminals, ensure that you have sufficient overcurrent protection and sufficient earthing in place
Communication cables installation
Powering the inverter on/off
Before powering on, please make sure all voltages and currents are in the range of the hybrid inverter’s specifications. Operate via the following steps:
- Turn on PV switch
- Turn on the switch between the grid and the hybrid inverter
- Turn on the switch between the battery and the hybrid inverter and wake up the battery
- To set up the hybrid inverter, refer to the detailed online installation manual
- Note that shutdown steps are opposite to the above order
Status lights
LED | Status |
---|---|
Green light on | Running normally |
Red light on | Fault state |
Green light blinking | Standby or bypass state |
Red light blinking | Alarm state |
Red lights and green lights blinking | Software updating |
To wake up the screen and view more information, push any button. The screen will then display the main interface from which you can view basic information or enter the system menu.
Cable connections
LED | Type | Notice |
---|
PE cable
AC output cable
PV input cable
Battery power cable
| Single multi-core yellow green copper cable
Two or three different colour multi-core copper cables. Size: 3.6kW – 4mm2 (min), 6kW – 6mm2 (min)
Photovoltaic dedicated cable (such as PV1-F). Size: 4mm2
Red and black multi-core copper. Size: 3AWG or 25mm2
| The lithium battery has its own power and communication line to use
The hybrid inverter includes the basic communication line(s) to use directly
Please make sure all the switches are off before install. For your safety, please do not operate when power is on.
Other communication cables| Network cable with RJ45 connectors. Ensure correct configuration when terminating your own cables.|