VEVOR B08ZXDQL3Y 3 Step Railings Staircase Handrail User Manual

June 1, 2024
VEVOR

VEVOR B08ZXDQL3Y 3 Step Railings Staircase Handrail

VEVOR-B08ZXDQL3Y-3-Step-Railings-Staircase-Handrail-
product

FAQ

  • Q: Can I connect Part B and Part A before putting Part D into Part A?
    • A: It is recommended to follow the sequence mentioned in the instructions to avoid mistakes during assembly. Please put Part D into Part A before connecting Part B and Part A.
  • Q: Do I need any special tools for installation?
    • A: Yes, you will need an electric drill to drill a 12mm hole as specified in the instructions.

Parts

VEVOR-B08ZXDQL3Y-3-Step-Railings-Staircase-Handrail-
fig-1

Tips: Avoiding mistakes, when processing the first and second step, we suggest do not connect parts tightly.

Installation Instructions

Please put all parts on the ground

VEVOR-B08ZXDQL3Y-3-Step-Railings-Staircase-Handrail-
fig-2

  • Put Part# Dinto Part# A
  • Put Part#C into holes of Part A (Please pay attention to the direction of Part# Cas shown in the figure)
  • Connect Part#B and Part#A( two) with Part I# E
  • Connect Part #C and Part #A with Part#E

VEVOR-B08ZXDQL3Y-3-Step-Railings-Staircase-Handrail-
fig-3 VEVOR-B08ZXDQL3Y-3-Step-
Railings-Staircase-Handrail-fig-4

  • Place the handrail on suitable stairs
  • Screw Part E by Part L
  • Mark hole sites on stairs tracing four holes of Part A
  • Leave the handrail alone and drill down according to the mark with a 12 MM driller
  • Align the handrail and holes, Knock nails (part F) into the ground with hammer
    • (Cement floor and marble floor, please using Part G; Timber floor: please using Part F)

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals