General Instructions
For easy installation, it is recommended to assemble the swing frame and lower it onto footers. Once the frame is assembled and leveled with hardware installed on the top rail, cement into place. Follow guidelines from the concrete manufacturer for the amount and time of curing, etc. It is also recommended to use ratchet straps along with stakes or anchor spikes to stabilize the frame while the cement cures.

Step 1: Preparation
DO NOT CEMENT POSTS/MOUNTS INTO PLACE UNTIL THE ENTIRE STRUCTURE IS ASSEMBLED. Refer to the General Installation guide for footing size information and instructions on digging proper holes for the support posts/mounts.

Step 2: Attaching the End Post to Top Rail
Attach the end post to the top rail using two (2) 6-1/4 bolts, four (4) washers, two (2) lock nuts, and two (2) bolt covers with caps.

Step 3: Attaching Swing Hangers to Top Rail
Loosen and attach the swing hanger onto the top rail. Space hangers with a minimum distance of 20 inches between each other. Loosen hardware on the swing hanger pendulum and attach chains.

Step 4: Attaching Adaptive Seat to Swing Hangers
Loosen the double clevis hardware and attach the adaptive seat using the four connection points. Retighten the double clevis hardware.

Specifications

Component Quantity Size/Description
Bolts 2 6-1/4 inches
Washers 4 N/A
Lock Nuts 2 N/A
Bolt Covers with Caps 2 N/A
Swing Hangers As required Minimum distance of 20 inches apart
Chains As required N/A
Double Clevis Hardware As required N/A

Inground Post/Mount Installation

STEP: 1
DO NOT CEMENT POSTS/MOUNTS INTO PLACE UNTIL THE ENTIRE STRUCTURE IS ASSEMBLED.
Refer to the General Installation guide footing size information and digging proper holes for the support posts/mounts.

High-Capacity Adaptive Swing Seat Install

For easy installation it is recommended to assemble swing frame and lower onto footers. Once frame is assembled and leveled with hardware installed on top rail, cement into place. Follow guidelines from Concrete manufacturer for amount/time of curing, etc. It is also recommended the use of ratchet straps along with stakes/anchor spike to stabilize frame while cement cures.

  • Attach end post to top rail using two (2) 6-1/4″ bolts, four (4) washers, two (2) lock nuts and two (2) bolt covers with cap.
  • Loosen and attach swing hanger on to top rail. Spacing hangers with a minimum distance of 20″ between each other.
  • Loosen hardware on swing hanger pendulum and attach chains.
  • Loosen double clevis hardware and attach adaptive seat using the four connection points. Retighten double clevis hardware.

FAQs

When can I cement the posts/mounts into place?

Do not cement the posts/mounts into place until the entire structure is assembled.

What should I use to stabilize the frame while the cement cures?

Use ratchet straps along with stakes or anchor spikes to stabilize the frame.

How far apart should the swing hangers be placed?

Swing hangers should be spaced with a minimum distance of 20 inches between each other.

What is the proper way to attach the adaptive seat?

Loosen the double clevis hardware, attach the adaptive seat using the four connection points, and then retighten the hardware.