TAC-CA6-006 Spear Running Boards Instruction Manual

June 1, 2024
TAC

TAC-CA6-006 Spear Running Boards

Specifications

  • Installation Time: 60-120 minutes
  • Cutting: Not Required
  • Drilling: Not Required
  • Part List:
    • SPEAR RUNNING BOARD
    • PART #: TAC-CA6-006
    • Fits:
    • 2019-Up Chevy Silverado 1500 Double Cab (Exclude LD Model)
    • 2020-Up Chevy Silverado 2500-3500 Double Cab
    • 2019-Up GMC Sierra 1500 Double Cab (Exclude Limited Model)
    • 2020-Up GMC Sierra 2500-3500 Double Cab
  • Torque & Tools:
    • Fastener Size: 6mm, 8mm, 10mm, 12mm
    • Tightening Torque (ft-lbs): 7-8.5, 18-20, 35-40, 60-70
    • Wrench Required: 10mm, 13mm, 16mm, 18mm
    • Allen Wrench Required: 4mm, 5mm, 6mm, 8mm

Product Usage Instructions

Before Installation

  1. Remove all contents from the box and verify all parts are present.
  2. Read the instructions carefully before starting the installation. Assistance is recommended.

Installation Steps:

Step 1
Start the installation under the Passenger/Right side of the vehicle. Remove the plastic plugs from each mounting location along the bottom edge of the body.

Step 2
Attach Mounting Brackets to all threaded mounting holes. Use top mounting locations on the side of the body panel for reference.

Step 3
Attach Mounting Brackets to the factory threaded holes using the provided hardware. Do not tighten yet.

Step 4
Move along the body to the next mounting location and repeat Steps 1 – 3.

Step 5
Insert T-Bolts into the channels on the bottom of the Running Board and attach it to the Mounting Brackets using the provided hardware. Do not tighten yet.

Step 6
Level and adjust the Running Board, then fully tighten all hardware.

Step 7
Repeat Steps 1 – 6 to attach the other side Running Board.

Step 8
Periodically inspect the installation to ensure all hardware is secure and tight.

Maintenance Instructions:
To protect your investment, avoid using polish or wax that may contain abrasive substances. Mild soap can be used to clean the Running Boards.

SPEAR RUNNING BOARD
PART #: TAC-CA6-006

FITS:
2019-Up Chevy Silverado 1500 Double Cab (Exclude LD Model) 2020-Up Chevy Silverado 2500-3500 Double Cab
2019-Up GMC Sierra 1500 Double Cab (Exclude Limited Model) 2020-Up GMC Sierra 2500-3500 Double Cab

Torque & Tools

TAC-CA6-006-Spear-Running-Boards-FIG- \(2\)

BEFORE INSTALLATION

REMOVE CONTENTS FROM BOX. VERIFY ALL PARTS ARE PRESENT. READ INSTRUCTIONS CAREFULLY BEFORE STARTING INSTALLATION. ASSISTANCE IS RECOMMENDED.

Part List

TAC-CA6-006-Spear-Running-Boards-FIG- \(3\)

TOOLS

TAC-CA6-006-Spear-Running-Boards-FIG- \(4\)

PLEASE NOTE THAT THE FOLLOWING PICTURES ARE BASED ON THE PASSENGER-SIDE INSTALLATION

INSTRUCTION

STEP 1
Start the installation under the Passenger/Right side of the vehicle. Locate the 6 plugs along the bottom edge of the body. Remove the plastic plugs from each mounting location, (Fig 1).

STEP 2
Mounting Brackets will attach to all threaded mounting holes, (Fig 2). Directly above each threaded hole is a top mounting location on the side of the body panel. Hold a Bracket up in place to help determine the mounting holes to use along the body. NOTE: Thread an 8mm Hex Bolt into the threaded holes to clear paint as required.

TAC-CA6-006-Spear-Running-Boards-FIG- \(6\)

STEP 3
Select (1) Mounting Bracket. Attach the Mounting Bracket to the factory threaded holes with (2) 8mm Hex Bolts, (2) 8mm Lock Washers and (2) 8mm Flat Washers, (Fig 3). Do not tighten hardware.

STEP 4
Move along the body to the next mounting location. Repeat Steps 1 – 3 to attach the remaining (2) Mounting Bracket to the (2) remaining locations.

STEP 5
Select one Running Board. Insert (6) 6mm T-Bolts into the channels in the bottom of the Running Board (Fig 4), (3 T-Bolts per channel). Attach the Step to the (3) Mounting Brackets with (6) 6mm Flat Washers, (6) 6mm Lock Washers and (6) 6mm Hex Nuts, (Fig 5). Do not tighten hardware.

TAC-CA6-006-Spear-Running-Boards-FIG- \(8\)

STEP 6
Level and adjust the Running Board and fully tighten all hardware.

STEP 7
Repeat Steps 1—6 to attach the other side Running Board.

STEP 8
Do periodic inspections to the installation to make sure that all hardware is secure and tight.

Attention
To protect your investment, do not use any type of polish or wax that may contain abrasiFvreosntthat could damage the finish.
Mild soap may be used also to clean the Running Boards.

Frequently Asked Questions (FAQ)

Do I need to cut or drill during installation?

No, cutting or drilling is not required for installation.

What tools are required for installation?

Tools required include wrenches in sizes 10mm, 13mm, 16mm,and 18mm, as well as Allen wrenches in sizes 4mm, 5mm, 6mm, and 8mm.

How long does it take to install the running boards?

The installation time is estimated to be between 60 to 120 minutes.

Front
www.tacautoparts.com

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals