PENTAIR 40L30N RO Pressure Vessel Housings User Guide

June 1, 2024
Pentair

USER’S GUIDE
EcoLine
MODEL – 40L30NPENTAIR 40L30N RO Pressure Vessel
Housings

40L30N RO Pressure Vessel Housings

All information included in this publication is based on the latest information available at the time of printing. Pentair reserves the right to make changes at any time without notice and without incurring any obligation whatsoever. Photocopying of this publication by authorized original equipment manufacturers who have purchased directly from Pentair, or by persons using the materials for legitimate educational purposes, is approved by Pentair. Otherwise all copyright protection afforded by the law applies.
Goa, India. Phone: 91-832-6754400
Fax: 91-832-6754412
www.codeline.com
Product Bulletin – 98603 -Rev. B
ECN No. 6139 Revision dated – 09/06/2023

DANGER – HIGH PRESSURE DEVICE
This vessel may cause loss of life, severe bodily harm, or property damage if not correctly installed, operated and maintained. Read and understand all guidelines given in this bulleting before attempting to open, operate or service this vessel. Failure to follow  these guidelines and observe every precaution will result in malfunction and could result in catastrophic failure. Misuse, incorrect assembly, or use of damaged or corroded components can result in highvelocity release of the end closure. We recommend that only a qualified technician experienced in servicing high-pressure hydraulic systems open, close and service this vessel.

Important Safety Precautions

Do

  • Read, understand and follow every guide- linein this bulletin. Failure to take every precaution may void warranty and could result in catastrophic failure.
  • Install in an area where a vessel or piping malfunction that result in water leakage would not damage sensitive or expensiveequipment, such as electronic components.
  • Verify that head locking components are properly placed and secured.
  • Inspect end closures regularly, replace deteriorated components and correct causes of corrosion.
  • Follow membrane element manufacturer’srecommendations for loading elements into the vessel (see Replacing Elements).
  • The vessel is designed for continuous use at a pH of 3-11 and for intermittent cleaning (max. 43.2 hours per year at a pH of 2-12).
  • Flush the vessel before system shut down.Some feed waters may cause corrosion under static conditions. Flushing with noncorrosive permeate is recommended.

Do Not

  • Operate the vessel outside the recommended operating and cleaning pH range.
  • Operate vessel at pressures and temperatures more than their specific rating.
  • Service any component until you verify that pressure is fully relieved from the vessel.
  • Use corroded components. Use of such components may result in catastrophic failure.
  • Pressurize vessel until after visually inspecting to ensure that the spiral retaining rings is correctly installed and seated in their grooves.
  • Tolerate leaks or allow end closures to be routinely wetted in any way.
  • Use excessive silicone lubricant.
  • pressurize vessel without element in place unless permeate ports are plugged internally.
  • Use vessel at negative pressure.
  • Pressurize vessel with Compressed Air.
  • Stand or climb on the pressure vessel, or the feed/ Concentrate or permeate ports.
  • Allow petroleum or silicone based products to come in contact with membrane elements during installation or maintenance.

General Information

The 40L30N Series of RO Pressure Vessel Housings are designed to be used in water desalination systems at operating pressures of up to 300 psi. Each model is ava- ilable in lengths to house from one to three 40-inch long elements and one of each 14-inch and 21-inch long elements. Any make of 4 – inch nominal diameter spiral- wound element with a 3/4”diameter male product water tube is easily accommodated. The 40L30N is designed and built in accordance with the International Standards. Please refer the G.A drawing for the hydrotesting pressure. The vessels utilize a fiberglass reinforced plastic shell for superior corrosion resistance.
The information and guidelines incorporated in this User’s Guide are intended only as a supplement to good industrial practice. Full responsibility for correct operation and maintenance of vessel remains with the user.
This guide should be used in conjunction with drawing number 99373.
When properly installed and maintained, 40L30N vessels can be expected to provide safe operation over a long service life.

INSTALLATION

Regardless of when or by whom your vessel may have been installed, there are a few quick checks you should make before use. Check that each vessel is:

  • Mounted with compliant material (Polyurethane saddle) between the fiberglass shell and any rigid frame.
  • Free to expand under pressure – shell not clamped rigidly in place, no rigid piping connections to port fittings.
  • Not used in any way to support other components such as piping, manifolds hanging from ports.

PENTAIR 40L30N RO Pressure Vessel Housings - overview
Figure: 1: Section Through End Closure

Dwg Ref Qty Per Item # Description Materials

Shell
1| 1| | Shell| Filament Wound epoxy/glass composite. Head locking grooves internally wound in place. Shell exterior coated with white high
gloss polyurethane paint.
Head
2| 2| 95929| End Plug Sub
Assembly| Engineering Thermoplastic
3| 2| 196266| Head Seal| Ethylene polypropylene 0-ring
4| 2| 196271| PWT Seal| Ethylene polypropylene 0-ring
Head Interlock
5| I 2| I 46414| I Retaining Ring| SA-479 SS 316
Vessel Support – Optional
6| 2| 45058| Saddle| Engineering Thermoplastic
7
| 2| 47459| Strap Assembly| 304 Stainless Steel-PVC Cushion
8| 4| 97821| Strap Screw| 5/16-18 UNC, 1.5″L, 18-8 stainless Steel
Not Shown in above cross section

OPENING THE VESSEL

WARNING
Relieve pressure from vessel before beginning this procedure.

Contamination Removal
Metal oxidation products and mineral deposits can interfere with vessel disassembly. Remove all foreign matter from both ends off vessel as follows:

  1. Remove contaminants using a small wire brush or suitable abrasive (such as medium-grade ScotchBriteTM ).PENTAIR 40L30N RO Pressure Vessel Housings - overview 1
  2. Flush away loosened deposits with clean water.

Removing the Head
The head assembly is shown in Figure 1.
Remove head as follows:
Disconnect Permeate Piping –

  1. Disconnect permeate piping as required at nearest convenient joint, being carefulnot to place undue stress on the threadedconnections of the plastic permeateport(s).
    CAUTION
    DO NOT tap on fittings as this could damage the ports.

Remove the Retaining Ring from the groove –

  1. No Special tools are required for this operation. Engage you fore finger in the end tab of the retaining ring, lift it up and out of the groove in the shell.PENTAIR 40L30N RO Pressure Vessel Housings - overview 2
  2. Remove the 4” retaining ring from the stainless groove in the shell by rotating your finger behind the ring as it continues to exit the groove.PENTAIR 40L30N RO Pressure Vessel Housings - overview 3
  3. Once the retaining ring has been removed, examine the area for burrs or dings which could damage the head or membrane. If necessary, use ScotchBriteTM or 600 grade sandpaper to smooth the area.

Removing Head Assembly –

  1. Using a mallet, tap the head assembly lightly. Do not use a metal component to tap the head assembly.
  2. Thread a ½” O.D. Engineering Thermoplastic pipe approximately 1 feet long into the permeate port.
  3. Carefully rock the head assembly back and forth to release the seal (care should be taken to avoid too much stress on the product port threads).
  4. Once the Plug seal is broken, pull straight outward to remove the head assembly from the vessel.PENTAIR 40L30N RO Pressure Vessel Housings - overview 4
  5. Remove and discard plug seal, taking care not to scratch or otherwise damage the sealing surfaces.
  6. Repeat above procedure for the opposite end of the vessel.
  7. As soon as possible after removal, disassemble and check all head components, as described in Rebuilding the Head and Refurbishing Parts.

REPLACING ELEMENTS & CLOSING THE VESSEL

The following procedures are provided for information only. Elements should be installed in accordance with the element manufacturer’s recommendations. Where conflicts exist, contact the element manufacturer or Pentair Water for clarification.
Removing Elements

  1. Remove heads from both ends of vessels as described in Opening the Vessel.

  2. Push element out of vessel from the upstream end.
    NOTE
    Always remove and install element in the direction of feed flow. The feed end (upstream end) is the end plumbed most directly to the pump.

  3. For multi-element vessels, remove the inter- connectors and retain forreinstallation.

Inserting Elements

  1. Ensure that heads are available in clean, as-new condition beforeproceeding. (If in doubt as to headcondition see section on inspectingparts, page 10).

  2. Check that all required elements areready for assembly, with no dings orother damage which could scratch theinside of the vessel.

  3. Check that the interior of the vessel isclean and free of burrs, sharp edges orother damage. Remove any residuallubricant from the vessel bore and work a fresh, thin film of Parker-Super OLubeTM lubricant into the lead-in chamferand an area approximately ½ inch in fromthe chamfer.
    CAUTION
    When lubricating the vessel chamfer, wear protective gloves or finger cots to prevent cuts or penetration of fiberglass.

  4. Orient end plug ports into desired position and push plug fully into vessel. A sharp, forceful thrust may be needed to enter plug seal into the vessel bore.PENTAIR 40L30N RO Pressure Vessel Housings - overview 5

  5. Carefully insert retaining ring into its groove. This is done by inserting the lead end of the spiral retaining ring (end without bent tab) into the stainless-steel retaining ring groove located in the shell, and slowly pushing the remaining turns into the shell.PENTAIR 40L30N RO Pressure Vessel Housings - overview 6

  6. Check that the spiral retaining ring is fully seated in the groove. If it is not, remove and check for foreign material that is causing the spiral ring not to sit into the groove.

  7. Lubricate element seals sparingly with the element manufacturers recommended lubricant or with glycerin.

  8. Insert each element with the brine seal (typically a U-cup seat) installed on the upstream end with its lip facing upstream.
    CAUTION
    System malfunctions and element damage may result if elements are installed in the wrong direction.

  9. Install the interconnectors between multiple elements as each succeeding element is installed.
    NOTE
    On some systems it may be easier to install the piping connections before the head is installed. If so, please proceed with Steps 10 & 11.

  10. Push each element downstream into the shell as it is installed until the element is fully engaged with the downstream head. If the elements are hard to push, make sure the brine seal is properly installed and you are pushing from the upstream end. When all the elements are fully inserted into the vessel, install the upstream head with the adapter fitted if required, as described in paragraphs 4 to 6 on page 6.

  11. Reconnect piping to vessel as described in Remaking Pipe Connection to End Plug on page 10.

  12. Pressurize the vessel. Inspect for leaks at connections to the vessel and all around the vessel itself. If any leaks occur, release pressure from the vessel and tighten the fittings as necessary. Then pressurize vessel and check for leaks again.
    CAUTION
    DO NOT tolerate any leaks. Leaks can result in corrosion and eventual catastrophic vessel failure.

HEAD DISASSEMBLY

NOTE
Head Rebuilding should be performed in a clean work area. Dust or dirt on Orings or other parts can scratch inner surfaces, with subsequent leakage.

  1. Using a small screwdriver or similar tool remove the Plug Seal. However, do not damage the sealing surface in any way as it may lead to leakage.
  2. Use a small screw driver or similar tool remove the PWT seal from the grove in the end plug.PENTAIR 40L30N RO Pressure Vessel Housings - DISASSEMBLY 2

HEAD ASSEMBLY

  1. Use only head components in as-new condition. Use new O-rings each time the head is assembled.

  2. Cover O-rings with a this even layer of Parker Super O-Lube silicone lubricant or the lubricant recommended by your element supplier.

  3. Assemble the PWT Seal into the groove in the End Plug.
    NOTE
    Glycerin is a commercially available lubricant that will not foul elements. However, silicone lubricant is recommended for this application.

  4. Insert the Head Seal O-ring into the groove on the outside diameter of the End Plug.
    PENTAIR 40L30N RO Pressure Vessel Housings - DISASSEMBLY
5

  5. Protect heads from contamination until ready to assemble into the vessel(s).

REFURBISHING PARTS

Inspecting Parts –
Plastic parts: Examine for cracking, softening or discoloring. This may indicate chemical attack of the material. Defective parts must be replaced. Alternate materials may be required. Contact your supplier or Pentair Water for assistance.
Metal parts: Check for corrosion, scratches, dents, cracks or other damage to shear ring and spiral retaining ring.
Carefully inspect each component for any damage that could affect structural strength or sealing properties. The following examples show some of the situations in which parts should be replaced.

  • End Plug – cracked, softened or distorted
  • Retaining Ring – chipped, scratched, corroded or bent

Refurbishing Shell –

  1. Using a fine wire brush, remove any large deposits from locking ring groove in the shell.
  2. Using a medium or finer grade of ScotchBriteTM and mild soap solution, clean the inside of the vessel at least 4 inches in from each end.
  3. Use clean water to rinse away all loosened deposits and soap residue.
  4. Examine inside of vessel for scratches, gouges, or other imperfections that could prevent proper sealing. If such areas exist and leaks are observed when the vessel is placed back in service, the shell may need to be replaced.

Refurbishing Other Parts –

  1. Remove any large deposits from metal parts using a wire brush.
  2. Scrub the entire surface with medium grade ScotchBriteTM until all contaminants are removed.
  3. Rinse parts clean with fresh water and dry.
  4. Inspect all parts for serviceability as specified above.

Remaking Pipe Connection to End plug –

  1. Use a wire brush to remove all foreign matter from threads on pipe fittings.
  2. Apply non-hardening thread sealant or Teflon tape to fitting and install into end plug. Tighten each fitting a maximum one quarter-turn past hand tight; the plastic end plug could be damaged if fittings are over-tightened.
  3. Fit end plug and retaining ring as described in Replacing the Elements section on page 6 and 7.

Part Replacement –

  1. Replace all parts that cannot be restored to as-new condition.

  2. Replace any parts showing signs of structural damage or corrosion.
    CAUTION: Use of components damaged by corrosion can cause catastrophic failure.

  3. Seals should be replaced as necessary each time the vessel is serviced. Any parts that need to be replaced are available from your supplier or from Pentair.
    NOTE
    AFTER END OF SERVICE LIFE OF VESSEL, DISPOSE THE VESSEL AND ITS COMPONENTS AS PER APPLICABLE LOCAL LAWS AND REGULATIONS

WARRANTY TERMS & CONDITION

FOR LATEST WARRANTY TERMS & CONDITIONS VISIT ON
https://codeline.pentair.com/en/downloads (Document Name – Warranty Terms & Conditions – Pentair Warranty FRP Housings)

PENTAIR WATER REGISTRATION CARD

Vessel Model: Date of Purchase
OEM Purchased From: (Name/ Address/Tel no.)
Treatment System wherein used: (Pleas Use circle the relevant)
PO…………….
UF……………
NF……………….
Other
System Capacity: GPD
No. of Vessel s:
Date of Installation:
Name/Address/Tel & email of your Company:
Installation Site: (Address/Country)
Serial Numbers
Numbers are located at one end of the vessel. (If you have purchased more than 64 vessels, please attach the serial nos. separately).
Mailing Address:
CodeLine Division
Pentair Water India Pvt. Ltd.
L152-55, Verna Industrial Area
Verna, Goa — 403 722. INDIA
Tel; 91-832-6754400
Fax: 91-832-6754412
www.codeline.com
Thank you for purchasing a world class CodeLine vessel.
To help us service you better and update you on “improvement and changes”, please fill up the above registration card and mail at the address given in the same.

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Pentair User Manuals

Related Manuals