Fienza RB078 Valentina Fluted Arch Concrete Wall Hung Basin Installation Guide

June 1, 2024
fienza

Fienza RB078 Valentina Fluted Arch Concrete Wall Hung Basin Installation Guide

Fienza RB078 Valentina Fluted Arch Concrete Wall Hung Basin Installation
Guide

Warm Grey RB078
Warm White RB078W
Tuscan RB078TU
Sage RB078SG

  • Fluted design
  • Concrete with food-grade nano sealant
  • No overflow
  • Requires 32 mm non-overflow waste (not included)
  • Extra heavy duty mounting brackets and bolts included

Fienza RB078 Valentina Fluted Arch Concrete Wall Hung Basin -
overview

Fienza RB078 Valentina Fluted Arch Concrete Wall Hung Basin -
Measurement

Installation Instructions
PLEASE READ CAREFULLY BEFORE INSTALLATION
The fixings supplied are suitable for solid masonry walls only. Plasterboard or stud walls may require specialist fixings (not supplied).
CAUTION : Care should be taken when drilling walls and floors to avoid any sunken electrical wires or water pipes.
FOR OTHER WALL CONSTRUCTION SYSTEMS USE SUITABLE FIXING METHOD.

Basin Installation with Fixing Kit

  1. Mark out the installation height and the centre line of the basin on the finished wall at the recommended height as shown and prepare water inlet and outlet connections.
    Note: Installation height for AS2428.l compliance must be at 840mm to be compliant. Height is the distance from the floor to the top surface of the front of the basin.
    Fienza RB078 Valentina Fluted Arch Concrete Wall Hung Basin - Mark out the
installation height and the centre line

  2. Fit the two mounting brackets to the basin with the provided MS x 10mm screws and flat washers and tighten. Please note the brackets are left and right specific.
    Caution: Do not over tighten the bracket to basin screws as this may damage the concrete basin.

  3. Measure and record the mounting hole locations of the basin mounting brackets. Transfer the mounting hole locations to the wall according to the centre line and adjust to be flat and centred. Drill the four marked holes
    Fienza RB078 Valentina Fluted Arch Concrete Wall Hung Basin - Measure and
record the mounting hole locations of the basin

  4. Remove the mounting brackets from the basin. in masonry wall using a masonry drill bit, to the required depth. Push the supplied wall plug into each hole.

  5. Place the mounting brackets in position against the wall, locating the wall plug holes through the holes in the basin brackets. Screw a mounting screw into each wall plug to secure the mounting brackets to the wall.
    Caution: Do not over tighten the anchor bolt nuts.
    Fienza RB078 Valentina Fluted Arch Concrete Wall Hung Basin - Place the
mounting brackets in position against the wall,

  6. Screw the basin to the mounting brackets with the provided MS x 10mm screws and flat washers and tighten.
    Caution: Do not over tighten the bracket to basin screws as this may damage the concrete basin.
    Fienza RB078 Valentina Fluted Arch Concrete Wall Hung Basin - Screw the
basin to the mounting brackets with the provided

  7. Install the tapware and the waste plug according to the installation instructions for the fittings. Connect the water supply pipe and the drainage pipe.
    Note: Connect the hot water and cold water pipes according to the tapware markings.

Warranties

Residential Warranty Periods
Applies to domestic uses and applications of Fienza® products, such as private dwellings and retirement villages.

Commercial Warranty Periods
Applies to commercial uses and applications of Fienza® products, including, but not limited to: commercial food premises such as restaurants; commercial accommodation such as hotels; hospitals and healthcare facilities; public amenities; and industrial, laboratory and manufacturing facilities.

Fienza RB078 Valentina Fluted Arch Concrete Wall Hung Basin - Commercial
Warranty Periods

Australian Consumer Law
Our goods include guarantees that cannot be excluded under the Australian Consumer Law. You are entitled to a replacement or refund for a major failure and compensation for any other reasonably foreseeable loss or damage. You are also entitled to have the goods repaired or replaced if the goods fail to be of acceptable quality and the failure does not amount to a major failure.

Fienza Pty Ltd reserves the right to make changes in product characteristics, packaging or availability at any time without notice. Please visit fienza.com.au for the latest information.

Warranty Conditions

  • Installation has been carried out by a licensed tradesperson in accordance with all applicable Building, Plumbing and Electrical codes, and Federal, State, or Local Government Regulations in accordance with AS/NZS 3500 Plumbing & Drainage, AS/ NZS 6400 Water Efficient Products, and AS/NZS 3000 Electrical standards for any installations to which these standards apply.
  • All maintenance and adjustments to the product after the installation have been carried out by a licensed tradesperson.
  • All care and cleaning instructions have been adhered to as prescribed.
  • All goods of substandard quality manufacture (excluding imperfections permitted within AS1976 – Vitreous China used in Sanitary Applications) will be credited or replaced by Fienza when advised within the warranty period, subject to prior inspection and agreement.
  • Proof of purchase is required for warranty claims.

Warranty Limitations

To the extent permitted under the Trade Practices Act and other relevant legislation, Fienza’s liability is limited to:

  • The cost of replacing the goods, or
  • The cost of obtaining equivalent goods, or
  • The cost of having the goods repaired.
  • Fienza is not responsible for any lack of operation or performance of goods (or any loss or damage) where goods are used or adapted for use with other goods not supplied by Fienza.
  • It is the responsibility of the customer and installer before installation to ensure that all components are correct and free of obvious visible faults.
  • Fienza is not responsible for the labour and rectification costs incurred in the above circumstance.

Conditions for On-Site Warranty Service Calls

Fienza will charge a service fee for each visit to an installation by its technician where it is determined that the fault is due to poorly executed or unlicensed installation work or where the product is not a genuine Fienza product or where the product is outside the warranty period. This may be paid in advance by credit card over the phone to a Fienza technician attending the site and will be refunded if the Fienza product is found to be at fault.

For warranty support, please contact Fienza

15 Walter Cres, Lawnton OLD 4501 PO Box 5381, Brendale OLD 4500

P 07 3490 6700 F 07 3490 6719 E help@fienza.com.au ABN 76136 411 311

All installations should be carried out by a qualified tradesman in compliance with the National Plumbing & Drainage Code and any State or Local Authority Regulations, in accordance with AS/NZS 3500 series of standards and AS/NZA 6400. All measurements are in millimetres and are subject to change without notice. For ceramic products, please allow+/- 10 mm tolerance for manufacturing variance. Please refer to fienza.com.au for the latest product specification.

FIENZA.COM.AU

VALENTINA Item Code: RB078 Updated: 06/12/2023

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals