TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates User Manual

May 15, 2024
Topens

TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates

TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing
Gates

  • Please read and follow all warnings, precautions and instructions before installation and use.
  • Coming with UPS01-PLUS uninterrupted power supply, this series gate opener can be powered by AC 100-240V electricity directly. It is allowed to use additional battery (NOT incl.) and solar panel (optional) as BACK-UP or MAIN power source with this UPS01-PLUS.
  • Never connect the solar panel to the control board directly to charge the battery.
  • Periodic checks of the opener are required to ensure safe operation.
  • Save this manual.

Please record the product model, your email address etc. in the spaces provided below. Refer to this list when contacting TOPENS for technical service or assistance with your automatic gate opener.

Where did you purchase? (Amazon.com; Amazon.ca: Amazon.co.uk, Amazon.de; Other, Please

Specify)


Order#| Product Model| Purchase Date
 |  |
Full Name| Phone#| Email Address (VERY

IMPORTANT)

 |  |
Street Address, Apartment /Unit, City, State /Province, Zip Code| Country/Region
 |
Approximate Gate Weight Per Leaf (pounds; kg: Other.

Please Specify)

| Approximate Gate Length Per Leaf (feet meter; Other. Please

Specify)

| Did you purchase any accessories? (Please list

below)

 |  |
Issue Details

Safety Installation Information

  1. READ and FOLLOW all instruction.
  2. The gate opener is intended for use with Class I vehicular swing gates. Class I denotes a vehicular gate opener (or system) dwellings, or a garage or parking area associated therewith. Install the gate opener only when the opener is appropriate for the construction and the usage class of the gate.
  3. Gate opening system designers, installers and users must take into account the possible hazards associated with each individual application. Improperly designed, installed or maintained systems can create risks for the user as well as the bystander. Gate system design and installation must reduce public exposure to potential hazards. All exposed pinch points must be eliminated or guarded.
  4. A gate opener can create high levels of force during normal operation. Therefore, safety features must be incorporated into every installation. Specific safety features include safety sensors.
  5. The gate must be properly installed and work freely in both directions prior to the installation of the gate opener.
  6. The gate must be installed in a location so that enough clearance is provided between the gate and adjacent structure when opening and closing to reduce the risk of entrapment. Swinging gates shall not open into public access areas.
  7. The opener is intended for use only on gates used for vehicles. Pedestrians must be supplied with a separate access opening. The pedestrian access opening shall be designed to promote pedestrian usage. The pedestrian access shall be located such that persons will not come in contact with the moving vehicular gate.
  8. Pedestrians should never cross the pathway of a moving gate. The gate opener is not acceptable for use on any pedestrian gate. Pedestrians must be supplied with a separate pedestrian access.
  9. For an installation utilizing non-contact sensors (safety sensors), see product manual on the placement of non-contact sensors (safety sensors) for each type of application.
  10. Care shall be exercised to reduce the risk of nuisance tripping, such as when a vehicle trips the safety sensor while the gate is still moving.
  11. One or more non-contact sensors (safety sensors) shall be located where the risk of entrapment of obstruction exists, such as the perimeter reachable by a moving gate or barrier.
  12. Never mount any device that operates the gate opener where the user can reach over, under, around or through the gate to operate the controls. Controls are to be placed at least 6’ (1.8m) from any part of the moving gate.
  13. Controls intended to be used to reset an operator after 2 sequential activations of the entrapment protection device or devices must be located in the line of sight of the gate, or easily accessible controls shall have a security feature to prevent unauthorized use. Never allow anyone to hang on or ride the gate during the entire travel of the gate.
  14. Each gate opener is provided with two safety warning placards. The placards are to be installed on the front and back of the gate where they are plainly visible. The placards may be mounted using cable ties through the four holes provided on each placard. All warning signs and placards must be installed where visible in the area of the gate.TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates 3
  15. To AVOID damaging gas, power, or other underground utility lines, contact underground utility locating companies BEFORE digging.
  16. Do not permit children to play on or around the gate and keep all controls out of their reach.
    NOTE: TOPENS Gate Operator can be used for driveway gates made by steel, wood, vinyl, and shaped as panel, tube, and chain-link. While use on solid surface gates is NOT recommended. Solid surface gates have a high resistance to the wind. If the wind is strong enough, the operator will obstruct and stop.

Check Your Gate

TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates
4

Parts List

TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates
5

Extra parts for rounded gate post

TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates
6

Extra Parts for JY9132S

Accessories Parts (Included in some models, refers to the actual package)

TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates
8

Optional Accessories Parts List (Available at TOPENS Store)

TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates
9TOPENS JY9132
Automatic Gate Opener for Super Heavy Duty Dual Swing Gates
10

Replacement Parts

TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates
11

WARNING : Changes or modifications not expressly specified by this user manual, TOPENS could void the warranty of this equipment.

Tools Needed:

  • Power Drill
  • Tape Measure
  • Open End Wrenches – 14# &17# or Adjustable Wrenches
  • Wire Strippers
  • C-Clamps – small, medium, and large
  • Level
  • Hacksaw or Heavy Duty Bolt Cutters
  • Phillips Screwdriver

Technical Specifications & Features

Specifications

 | JY9132
Input:| 110-240V~ 50/60Hz
Motor Voltage:| 24VDC
Power:| 2×100W
Current:| 5A
Actuator Speed:| 16mm/s(0.6 in/s)
Max. Actuator Travel:| 490mm(19.3 in)
Ambient Temperature:| -20℃~ +50℃ (0°F to 120°F)
Protection Class:| IP44

Gate Capacity of JY9132

600kg(1300lbs) NR NR NR NR NR
500kg(1100lbs)) NR NR NR NR
400kg(880lbs)) NR NR NR
300kg(660lbs) NR NR
200kg(440lbs) NR
100kg(220lbs)
  1.5-2m(5-7′) 3m(10′) 3.6m(12′) 4.3m(14′) 5m(16′) 6m(20′)

NOTE : “NR” indicates this size and weight combination is NOT recommended for one arm actuator.
NOTE : Ball bearing hinges should be used on all gates weighing over 140kg (300 lbs).

Features:

  • Soft start and soft stop
  • Fast selecting push/pull to open
  • Reverse the gate upon first obstruction and stop upon a second sequential obstruction.
  • Built in adjustable auto-close (3-120 seconds)
  • Built in max. Motor running time (MRT) for multiple safety protection (40 seconds)
  • Reliable electromagnetism limit for easy adjustment
  • Can be equipped with a wide range of accessories
  • Adjustable opening/closing interval between master and slave gate
  • Easy to install, and minimum maintenance requirement

Installation Overview

TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates
12

Important: The second gate opener cable should be put into the PVC conduit (not provided) which is buried underground .This protects the cable from lawn mowers and string trimmers.

Preparation for Installation

There are two installation types for the gate opener, Pull-to-Open and Push- to-Open. In the Push-to-Open installation, gate opens out from the property. A Push-To-Open Bracket is required to be used for each gate.
NOTE : Ensure the gate does not open into public areas. One more person will help when installing.

The gate opener can be either installed on square gate post or rounded gate post. when the gate post is square, the width of the gate post should be at least 120 mm. When the gate post is rounded, connect post bracket to the gate post via pipe clamps, requires the diameter of the gate post should be less than or equal to 80mm. When mounting the Post Brackets to wooden post, a larger-size washer or metal plate should be used between the bolts and the wooden post to ensure the stability of the fastening hardware. If the post is smaller than 6″ diameter or square, it should be made of metal and set in cement to ensure its stability.TOPENS JY9132 Automatic Gate Opener for Super
Heavy Duty Dual Swing Gates 13

Install the Opener on the Gate – for Pull to Open
The position of Post Bracket is very important. The following illustrations and tables are required to determine the proper mounting position for the Post Bracket. The tables show the maximum opening angle of the gate for a given A and B. For example, if A is 24cm and B is 14cm, the maximum opening angle of the gate is 120° Pull-to-Open Installation — Gate in Closed position (Moving- Rod is extended)

TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates
14

  1. Insert two M10X100 bolts through the holes of post bracket and two pull-to-open brackets as shown. Place bushings in the middle , washers and nuts on the bottom of the bolts and tighten.TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates 15

  2. Attach the gate bracket and post bracket assy. to the opener by inserting a clevis pin. Secure the clevis pins using the hairpin clipsTOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates 16

  3. With the opener fully retracted and with the gate in the fully open position (for Pull-to-Open installation), place the opener with the Post Bracket Assy. and Gate Bracket on the gate post and the gate. While holding the gate opener in the level position, temporarily secure it with two C-clamps.

  4. Make sure that there is a minimum clearance of 2.5cm between the gate and the opener, and that the opener and the pull-to-open Brackets are not binding in both the gate-open and gate-closed positions. If there is not at least 2.5cm of clearance or if the opener and the pull-to-open Brackets are binding, rotate the pull-to-open Brackets and/or move the Post Bracket Assy. to obtain the minimum clearance and eliminate the binding. TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates 17
    TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates
18

  5. Sign the bolt-hole point on the gate post and gate. Do this by placing a punch or a sign in the middle of each bolt slot on the post bracket and the gate bracket. Then remove the opener and brackets assy. by taking off the C-clamps.

  6. Drill ¢14 mm holes in the post and ¢8.5mm holes through the gate at the marked locations;

  7. Attach the post bracket assy. to the gate post by using expansion bolts.

  8. Attach the gate brackets to each gate by inserting two M8x70 bolts through the gate brackets and the drilled holes in the gates. Fasten each bolt with one ¢8 plain washer one ¢8 lock washer, and one ¢8 nut.

  9. With the opener fully retracted and with the gate in the fully open position (for Pull-to-Open installation), insert a clevis pin through the gate opener and the pull-to-open Bracket and insert another clevis pin through the gate opener and the Gate Bracket. Secure each clevis pin with a hairpin clip.TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates 20

TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates
21

Install the Opener on the Gate – for Push to Open
The position of Post Bracket is very important. The following illustrations and tables are required to determine the proper mounting position for the Post Bracket. The tables show the maximum opening angle of the gate for a given A and B. For example, if A is 14cm and B is 16cm, the maximum opening angle of the gate is 95° Push-to-Open Installation — Gate in Closed position (Moving- Rod is retracted)TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty
Dual Swing Gates 22

  1. Insert three M10X100 bolts through the holes of post bracket and two push-to-open brackets as shown. Place bushings in the middle , washers and nuts on the bottom of the bolts and tighten.
  2. Attach the gate bracket and post bracket assy. to the opener by inserting a clevis pin. Secure the clevis pins using the hairpin clips.TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates 24
  3. With the opener fully retracted and with the gate in the fully closed position (for Push-to-Open installation), place the opener with the Post Bracket Assy. and Gate Bracket on the gate post and the gate. While holding the gate opener in the level position, temporarily secure it with two C-clamps.
  4. Make sure that there is a minimum clearance of 2.5cm between the gate and the opener, and that the opener and the push-to-open Brackets are not binding in both the gate-open and gate-closed positions. If there is not at least 2.5cm of clearance or if the opener and the push-to-open Brackets are binding, rotate the push-to-open Brackets and/or move the Post Bracket Assy. to obtain the minimum clearance and eliminate the bindingTOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates 25
  5. Sign the bolt-hole point on the gate post and gate. Do this by placing a punch or a sign in the middle of each bolt slot on the post bracket and the gate bracket. Then remove the opener and brackets assy. by taking off the C-clamps.
  6. Drill ¢14 mm holes in the post and ¢8.5mm holes through the gate at the marked locations;
  7. Attach the post bracket assy. to the gate post by using expansion bolts.
  8. Attach the gate brackets to each gate by inserting two M8x70 bolts through the gate brackets and the drilled holes in the gates. Fasten each bolt with one ¢8 plain washer one ¢8 lock washer, and one ¢8 nutTOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates 26
  9. With the opener fully retracted and with the gate in the fully closed position (for Push-to-Open installation), insert a clevis pin through the gate opener and the push to open bracket and insert another clevis pin through the gate opener and the Gate Bracket. Secure each clevis pin with a hairpin clipTOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates 27

NOTE : The setting of the PULL/PUSH TO OPEN of the control board should be in accordance with the installation.

Mounting of the Control Box
Use 4 deck screws (not provided) to install the control box. Even though the control box is waterproof designed, for safety reason and a longer service life, it is recommended to install the control box inside a secure surface and at least 100 cm (40 inches) above the ground to avoid being flooded or buried under snow.

TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates
28

CAUTION : Make sure the cable outlet hole in the Control Box is always down during installation so as to drain off the water.

Connection of the Power Supply

A 24VDC AC-DC power supply is included in the kit. You can plug it to the AC socket to use it power up the gate opener directly if the AC electricity is accessible. You can also connect a 24VDC back-up battery (2*12VDC, connected in series to become 24VDC) to the power supply if the AC electricity is not stable. In this situation, 5AH battery is enough.

You can also use the batteries as the main power source without the AC electricity. In this situation, you must purchase spare solar panel (at least 20W) to charge the batteries. The solar panel and the batteries can be connected to the UPS01-PLUS power supply easily. And then you can connect the output of the power supply to the gate opener to power up the gate opener system. Marine or Automotive Type Battery with capacity greater than 12 AH is required (NOT INCLUDED). 2 PCS 12VDC batteries can be connected in series to become 24VDC to power up the gate opener. The following diagram will show you how to connect 2 PCS batteries in series. Please note the wire connection of them is very important. Incorrect wire connection will damage the control board. The batteries should be waterproof type or you should place them in water proof housing.

WARNING : NEVER connect the gate opener to the power outlet before all the installations have been done.

Power Mode 1. Only use the AC electricity as the power source
There are 2 male terminals with the LOAD output wires of the UPS01-PLUS power supply and 2 female terminals with the power input wires of the control box which have been connected to the “+PWR IN-” port of the control board. Just plug them together to complete the wire connection. Finally you can plug the power cord to the socket to power on the system. You can leave the SOLAR and BAT wires of the UPS01-PLUS Not Connected in this situation.

TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates
29

Power Mode 2. By AC electricity and back-up batteries, only use the AC electricity to charge the batteries
If the AC electricity failure happens rarely (less than 8 hours per day), then you can use minimum 5AH 2*12VDC batteries as back-up power source in case of AC power failure. In this situation, you can connect the UPS01-PLUS to the control box refer to step 1 in this chapter. And then you can connect 2 PCS 12VDC batteries in series and then connect it to the UPS01-PLUS power supply

TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates
30

Power Mode 3. Use the batteries as the power source, only use the solar panel to charge the batteries
If the AC electricity is not available, then you can choose the batteries as the power source and use the solar panel to charge the batteries. The capacity of the batteries should be at least 12AH and the power of the solar panel should be at least 20W in this situation. The gate opener can run for 10 cycles per day without connecting any other accessories except push button & alarm lamp if the local average sunshine time is more than 6 hours per day. The power of the solar panel and the capacity of the batteries should be enlarged if the local average sunshine time is less than 6 hours per day or using one of the accessories (photocell, external receiver, exit wand and keypad). Please provide us with more details of the local sunshine condition and accessories needs which we can calculate the configuration of the solar panel and the batteries. Please connect the UPS01-PLUS power supply & batteries & the solar panels refer to the following wiring diagram. You can leave the power cord Not Plugged in this situation.TOPENS JY9132 Automatic
Gate Opener for Super Heavy Duty Dual Swing Gates 31

Power Mode 4. By AC electricity and back-up batteries, use the AC electricity and the solar panel to charge the batteries at the same time

If you want to use the solar panel and the AC electricity to charge the batteries at the same time, firstly you can connect the UPS01-PLUS power supply & batteries & the solar panels refer to the above wiring diagram in “Power Mode 3”. Only need one more step, plug the power cord to the AC socket to complete the wire connection. The system will give priority to the use of AC electricity. The power supply will switch to batteries when the AC electricity is outage.

Connection of the Control Board

TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates
32

  1. Actuator 1 (Master gate, open first & close last)
    Insert the stripped cable wires into the appropriate terminals on the opener terminals block. The red wire should be inserted into the #15 terminal of “MOTOR1” port, the black wire into the #16 terminal of “MOTOR1” port, the blue wire into “ULMT1” terminal (#17), the green wire into “COM” terminal (#18), and the yellow wire into “DLMT1” terminal (#19).

  2. Actuator 2 (Slave gate, close first & open last)
    The red wire should be inserted into the #20 terminal of “MOTOR2” port, the black wire into the #21 terminal of “MOTOR1” port, the blue wire into “ULMT2” terminal (#22), the green wire into “COM” terminal (#23), and the yellow wire into “DLMT2” terminal (#24).

  3. UPS01-PLUS Power Supply
    Before connecting this item, please refer to the chapter of “Connection of the Power Supply”.

  4. Battery (not included) & solar panel (optional, ONLY included in JY9132S)
    Please connect them following the chapter of “Connection of the Power Supply”.

  5. Warning Light (Included in some models, refers to the actual package)
    The red wire of the warning light should be inserted into +LAMP (#25) terminal, the white wire into the LAMP- (#26).

  6. Photocell Beam System (PBS) (Included in some models, refers to the actual package)
    Use a 2-core cable to connect the “+ ~” terminal of the photocell’s emitter to the “+24” (#1) terminal, the “- ~” terminal to the “GND” (#3) terminal. Also the “+ ~” and “- ~” terminals of the photocell’s receiver should be connected to the “+24” and “GND” terminals in parallel. Use another 2-core cable to connect the “NC” terminal of the receiver to the “PHOTO” (#2) terminal, the “COM” terminal to the “GND” (#3) terminal.

  7. Reflection Photocell Sensor (optional)
    The “AC10-25V/DC12-30V” terminals of the reflection photocell sensor should be connected to the “+24” (#1) and “GND” (#3) terminals, no matter the polarity. The “NC” terminal should be connected to the “PHOTO” (#2) terminal. The “COM” terminal should be connected to the “GND” (#3) terminal.

  8. Push Button (optional)
    The push button should be wired to the “#4 and “#5” terminals. No matter the polarity. The gate operator works alternately by pressing the button (open- stop-close-stop-open).

  9. Electric Lock (optional)
    The electric lock should be wired to the “-LOCK+” terminal (“#13 and “#14” terminals), no matter the polarity of the wires.
    NOTE : The open delay time of the 2 actuators should be more than 4S if the lock is used with the gate opener.

  10. Exit Wand (optional)

    • The BLACK wire of the exit wand should be connected into the “#5” terminal.
    • The BLUE wire of the exit wand should be connected into the “#6” terminal.
    • The RED wire of the exit wand should be connected into the “#11” terminal.
    • The GREEN wire of the exit wand should be connected into the “#12” terminal.
    • The sensitivity adjustment board should be wired to the GREEN wire and the YELLOW wire of the wand respectively. No matter the polarity.
  11. HomeLink Remote Control Kit (optional)

    • The “1” terminal should be connected to the “COM” (#5) terminal.
    • The “2” terminal should be connected to the “O/S/C” (#4) terminal.
    • The “DC+” terminal should be connected to the “+PWR IN” (#11) terminal.
    • The “DC-” terminal should be connected to the “PWR IN-” (#12) terminal.TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates 33
  12. Wired Keypad (24VDC) (optional)

    • The RED wire of the wired keypad should be connected into the “#11” terminal.
    • The BLACK wire of the wired keypad should be connected into the “#5” terminal.
    • The PURPLE wire of the wired keypad should be connected into the “#5” terminal.
    • The BLUE wire of the wired keypad should be connected into the “#4” terminal.
  13. External receiver (optional)

    • The RED wire of the external receiver should be connected into the “#11” terminal.
    • The BLACK wire of the external receiver should be connected into the “#5” terminal.
    • The BROWN wire of the external receiver should be connected into the “#4” terminal.
    • Note : Using of the exit wand, keypad and external receiver would cause the battery exhausted quickly. Big capacity of battery and big power of solar panel (if the solar panel is used as main charger) is required if you want to use either of them.

How to Program the Remote to the Opener

  • The remote MUST be programmed to the opener BEFORE OPERATING. Please follow the steps to program the remote.
  • Activate the opener only when gate is in full view, free of obstruction and properly adjusted. No one should enter or leave gate area while gate is in motion. DO NOT ALLOW CHILDREN to operate push button or remote. DO NOT ALLOW CHILDREN TO PLAY NEAR THE GATE.
  • If you purchase additional remote controls, the gate opener must be programmed to accept the new remote code.
  • If you lose one of any remote control, please erase and reprogram all other remote controls to have a new code for safety.
  • Press and release the CODE SW button, the CODE LED will be ON, then press the key on the remote two times in 2 seconds, between the two times HOLD ON FOR A MOMENT, the CODE LED will flash for 3 seconds and then to OFF. Now the remote has been programmed successfully.

TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates
34

  • NOTE : Max. 8 remotes can be programmed for the opener. An External Receiver (optional) allows up to 250pcs remotes to be programmed for the opener. TOPENS ERM12 Universal External Receiver is available at TOPENS Store.
  • TOPENS ERM12 Universal External Receiver is also compatible with other brand swing gate opener, sliding gate opener and garage door opener.

How to Erase All the Remote Codes
Press and hold the CODE SW button until the CODE LED from ON to OFF. Now all remote codes have been erased.

How to Use the Remote to Operate Your Gate Opener
Each remote has four buttons, from top to bottom are separately A, B, C and D. You may use this remote to operate as many as 4 sets TOPENS swing gate openers or 1 set TOPENS sliding gate opener and 2 sets TOPENS swing gate openers.

  1. Use this remote to only operate TOPENS swing gate opener A, B, C and D four buttons share same function once they are programmed with TOPENS swing gate opener. You may choose any button to program it with our swing gate opener. Every press of the button is able to active the gate opener to work alternately (open-stop-close-stop-open).
  2. Use one remote to operate TOPENS swing gate opener & sliding gate opener at the same time
    All of TOPENS sliding gate opener have midway mode. Button B is designed to realize midway function (refer to more details in our TOPENS sliding gate opener manual). So it is must program button A with sliding gate opener, while you may program either C button or D button with TOPENS swing gate opener.

Wireless Keypad Programming
You can follow the below steps to program wireless keypad to the opener. Press the CODE SW button until the CODE LED is ON, and then release the button. Then press “OK” button on keypad and CODE LED will flash for 3 seconds and then be OFF which indicates the keypad has been programmed successfully. You can use the default password “888888” to operate the opener after programming. You can press “PIN” “8 8 8 8 8 8” and then press “OK” to confirm to operate the opener. Also you can change the password of the keypad follow the below steps. Press “PIN” and then input the six digits old password and then press ”PIN” again, the CODE LED will be ON. Input the six digits new password and then press the “PIN” to confirm the new setting, CODE LED will flash for 3 seconds and then be OFF which indicates the password has been changed successfully. You can press “PIN” “6 digits new password” and then press “OK” to confirm to operate the opener.

TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates
36

NOTE : Every step for pressing button during program must be finished within 1 second to ensure successful programming.
NOTE : You can re-program the keypad to the control board if you forget the password.

Adjusting the Limit Switch

Note : Before adjusting the limit switch, refer to the chapter of “Install the Opener on the Gate”, and make sure that the rod is fully retracted when the gate is in the fully open position (for Pull-to-Open installation), or in the fully closed position (for Push-to-Open installation). Make sure that currently the rod is fully retracted.
Note : The position of Limit Switch A was fixed in factory, do not adjust it again.

TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing Gates
37

  1. For Pull-to-Open Installation, adjust the limit switch B to determine the closed position:
    Turn on power to operate the gate opener, then the arm extends to close the gate. If the arm closes over the desired closed position, press the remote control to stop the opener. Use a screwdriver to loosen the screw of the limit B, slightly slide the limit switch B inwards. If the arm closes halfway and fails to get to the desired closed position, slightly slide the limit switch B outwards. Please repeat the above steps, until the arm could arrive and automatically stop at the desired close position. Then tighten the screw firmly. Limit setting for master gate is finished now. The slave gate is totally the same.

  2. For Push-to-Open Installation, adjust the limit switch B to determine the open position:
    Turn on power to operate the gate opener, then the arm extends to open the gate. If the arm opens over the desired open position, press the remote control to stop the opener. Use a screwdriver to loosen the screw of the limit B, slightly slide the limit switch B inwards. If the arm opens halfway and fails to get to the desired open position, slightly slide the limit switch B outwards. Please repeat the above steps, until the arm could arrive and automatically stop at the desired open position. Then tighten the screw firmly. Limit setting for master gate is finished now. The slave gate is totally the same

Setting of the Control Board

WARNING : Ensure the gate opener is Power Off when you make any adjustment of the gate opener. Keep away from the gate during you set the gate opener system in case of the unexpected gate moving. Carefully adjust the DIP switches to avoid the risk of machine damage and injury or death. Always ask the help of professional technician /electrician if you have any question.

  1. DIP Switches
    The DIP switches are used to select pull/push to open, enable/disable auto close function, enable/disable open interval between the master and slave gate opener, enable/disable close interval between the master and slave gate opener and enable/disable photo beam function.TOPENS JY9132 Automatic Gate Opener
for Super Heavy Duty Dual Swing Gates 38

    • DIP Switch #1: Select push/pull to open
      If the gate opens into the property (pull to open), the DIP Switch is set to OFF (factory default setting). If your
      gate opens out from the property (push to open) the DIP Switch must be set to the ON position.
      Factory default setting is OFF.

    • DIP Switch #2: Auto close function enabled/disabled
      ON – Auto close function enabled
      OFF – Auto close function disabled
      Set the switch #2 to ON to enable the auto close function. Factory default setting is OFF.
      Important Note: When the auto close function is enabled, the photocell sensor is highly recommended to be installed with the gate opener for safety.

    • DIP Switch #3: Enable/disable open interval between the master and slave gate opener
      ON – Open interval is enabled
      OFF –Open interval is disabled
      Factory default setting is ON.
      NOTE : Open interval time can be adjusted by the OPEN DELAY potentiometer.

    • DIP Switch #4: Enable/disable close interval between the master and slave gate opener
      ON – Close interval is enabled
      OFF –Close interval is disabled
      Factory default setting is ON.
      NOTE : Close interval time can be adjusted by the CLOSE DELAY potentiometer.

    • DIP Switch #5: Photocell function enabled/disabled
      ON – Photocell function enabled
      OFF – Photocell function disabled
      You must set the switch #5 to ON to enable the photocell function if you want to use the photocell with the gate opener. Factory default setting is OFF.

  2. Potentiometers
    There are 5 potentiometers located in the control board. They are used to adjust soft stop period, auto-close time, open interval and close interval time between master gate opener and slave gate opener, and the stall force.TOPENS JY9132 Automatic Gate Opener for Super Heavy Duty Dual Swing
Gates 39

  • Potentiometer A is used to adjust the soft stop period of the gate opener. Turn the potentiometer clockwise to increase the soft stop period, and turn it counter-clockwise to decrease the soft stop period. The soft stop period can be adjusted gradually from 1 to 5 seconds.
  • Potentiometer B is used to adjust the auto close time of the gate opener. Turn the potentiometer clockwise to increase the auto close time, and turn it counter-clockwise to decrease the auto close time. The auto close time can be adjusted gradually from 3 to 120 seconds.
  • Potentiometer C and potentiometer D are used to adjust the open interval and close interval time between the master gate opener and the slave gate opener respectively. Turn the potentiometer clockwise to  increase the interval time, and turn it counter-clockwise to decrease the interval time. The interval time can be adjusted gradually from 1 to 9 seconds.
  • Potentiometer E is used to adjust the stall force the gate opener. Turn the potentiometer clockwise to increase the stall force, and turn it counter-clockwise to decrease the stall force.

Maintenance

Warning : Disconnect power before servicing.

  1. Using a clean, dry cloth to wipe the gate opener shaft, and then apply a silicone spray to reduce its friction. In cold climates where temperatures reach 1°C (30°F) or less, spray silicone on the actuator every 4~6 weeks to prevent freeze up.

  2. Regularly check gate hinges to make sure gate is swinging smoothly and freely. Grease hinges if needed.

  3. Check your installation periodically, as hardware and posts will shift. Brackets may need to be adjusted or hardware may need to be tightened.

  4. Maintain the area around your gate. Keep the areas free of objects that can prevent the gate swinging freely.
    NOTES:

  5. Inspection and service should always be performed anytime a malfunction is observed or suspected.

  6. It is suggested that while at the site voltage readings be taken at the operator. Using a Digital Voltmeter, verify that the incoming voltage to the opener it is within ten percent of the opener’s rating.

  7. Refer to the instructions on how to check gate force and sensitivity adjustments.

Status of LED(s) & Trouble Shooting


Status of gate opener

| Status of LED(s)| ****

Possible Solution(s)

---|---|---
CODE LED| POWER LED| FULL LED










Standby (UPS01 has                        been

connected to the gate opener control box)

| ****












OFF

| ****












OFF

| ****












OFF

| 1.              Make sure the connection between the UPS01 and control box is correct and fastening.

2.     Make sure the UPS01 power supply has been plugged into the AC main socket or the batteries (2*12V batteries connected in series) have been connected to the UPS01 well.

3.   Battery is over-discharge if you only use batteries with the UPS01 to power up the gate opener. The voltage of the battery should above 22V to make the gate opener work normally. Please wait the

 |  |  |  | battery to be charged above 22VDC.

4.       Check the output of UPS01. If the output of UPS01 is measured below 21VDC and the voltage of the batteries is above 22VDC or the power cord has been plugged into the socket well, then the UPS01 is defective.

5.     Check the fuse in the control board. Replace the fuse if it was burnt out.

6.   Check the control board. Replace the control board if necessary.

---|---|---|---|---



Standby

| ****


OFF

| ****

Flash(1 Blink every second)

| ****


OFF

| ****

Normal (Output Voltage of the UPS01 is normal)



Running

| ****

Flash(1 Blink every second )

| ****

Flash(1 Blink every second)

| ****

Flash(1                  Blink every second)

| ****


Normal






Both of the gates do not move when operating

| ****






OFF

| ****






Flash(1 Blink every second)

| ****






OFF

| 1.     Make sure the remote has been programmed to the control board before using.

2.        The battery of the remote may be exhausted. Replace the battery and try it again.

3.    The control board could be faulty. Replace the control board as necessary.






The gate reverse when on the way of opening or closing

| ****





Flash(1 Blink every second )

| ****





Flash quickly until the gate stop running

| ****





Flash(1                  Blink every second)

| 1.     Ensure that the gates swing freely without any binding.

2.                The stall force is adjusted too small. Turn the Potentiometer E to increase the force.

3.    Ensure the photo beam is not blocked when a photocell is used.


Both of the gates do not move when operating

| ****

Flash quickly for 3 seconds and then back to OFF

| Flash quickly for 3 seconds and then back to flash slowly(1 Blink every second)| ****



OFF

| 1.    Ensure the photo beam is not blocked when a photocell is used.

2.   Check if the photocell is defective or not.

---|---|---|---|---


Both of the gates do not move when operating

| ****



OFF

| Flash quickly for 3 seconds and then back to flash slowly(1 Blink every second)| ****

Flash quickly for

3 seconds and then back to OFF

| ****

Check if the jumper wire between the EDGE and GND terminal is loosening or not.


The gate stop when on the way of opening or closing

| ****

Flash quickly for 10 seconds and then back to OFF

| Flash quickly for 10 seconds and then back to flash slowly(1 Blink every second)| ****



OFF

| ****

Two sequential photo beam blocked has been detected. Please ensure the photo beam is not blocked.




The gate stop when on the way of opening or closing

| ****




OFF

| ****

Flash quickly for 10 seconds and then back to flash slowly(1 Blink every second)

| ****


Flash quickly for 10 seconds and then back to OFF

| 1.     Two sequential contact entrapments have been detected. Please ensure there is no obstacle on the path of opening or closing.

2.      Adjust the stall force bigger.


Both of the gates do not move when operating

| ****


Flash quickly

| ****


Flash quickly

| ****


Flash quickly

| 1.     Re-power on the gate opener.

2.        Replace    the       control board as necessary.










One gate runs normally but the other one does not move

| ****











Flash(1 Blink every second )

| ****











Flash(1 Blink every second)

| ****











Flash(1                  Blink every second)

| 1.         Exchange the wire connection of the 2 arms and check what will happen to the 2 arms. If the faulty arm is still faulty, then the arm itself is faulty. If the failure changes to the other arm which worked normally before, then the control board is faulty.

2.    If the arm is confirmed faulty by step 1, you can connect the RED & BLACK wire of the arm to the output of UPS01 directly to check if the arm could run normally (Exchange the RED & BLACK wire to the polarity of the output of

 |  |  |  | power supply will change the running direction of the arm). If so, then the limit switch of the arm is faulty. If the arm still can’t run, then the motor part which is inside the arm is faulty.
---|---|---|---|---



Gate automatically opens, but does not automatically close

| ****



Flash(1 Blink every second )

| ****



Flash(1 Blink every second)

| ****



Flash(1                  Blink every second)

| Setting of DIP switch #1 could be wrong. Please set the dip switch correctly according to the push/pull to opener installation of the gate opener.

Feedback & Review
Your comments and suggestions are important to us as they help us provide the best possible service. Should you have any need to contact us, the info below will help you get in touch: www.topens.com

Contact Us:
E-mail:support@topens.com
Kindly include your Product Model, Purchasing Date & Site, Order #, and your contact information. All your concerns will be replied within 24 hours.
Tel: +1 (888) 750 9899 (Toll Free USA & Canada)

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals