TASK power LP42HR21NDGSN30 Lighted Power Strip Instruction Manual

May 15, 2024
TASK power

TASK-power-LOGO

TASK power LP42HR21NDGSN30 Lighted Power Strip

Product Information

Specifications

  • Product Name: Lighted Power Strip DV Series
  • Installation Date: January 2019
  • Customer Service: 800-445-6404
  • Design Services & Tech Support: 866-848-9094

FAQ

  • Q: What should I do if I encounter difficulties during installation?
  • A: If you face any challenges during installation, please contact our Customer Service at 800-445-6404 or Design Services & Tech Support at 866-848-9094 for assistance.

General Guidelines

  • Power source MUST be a 20 amp branch circuit protected by a GFCI at the panel or GFCI before the connection at LPS.

  • All wiring must meet NEC® and local codes.

  • Light valance is recommended.

  • Firmly insert the plug straight into a receptacle, applying equal pressure to both blades at the same time. Gently rock plug, if needed.

  • Turn power off at panel. Carefully pry open each piece with the tool (provided). Insert the Romex connector into a knockout hole inside of the back frame. Pull wires into LPS.

Wiring

Wiring for Combined Light and Receptacle Circuit – Non Dimmable

TASK-power-LP42HR21NDGSN30-Lighted-Power-Strip-FIG-2

Step 1

  • Secure LPS to a wall by screwing into wall studs or using anchors provided. Connect BLACK Romex wire to BLACK wire from receptacles and switch.
  • Connect WHITE Romex wire to WHITE wire from receptacles and driver. Ground all GREEN wires to PEM studs inside of back frame.

Step 2

  • When connecting 2 or more LPS fixtures, run Romex from fixture to fixture. Ground each section to the next.

Step 3

  • To terminate last LPS, use wire nuts on the ends of wires.

Step 4

  • Snap cover in place and turn power on.

Wiring for Separate Light and Receptacle Circuits

TASK-power-LP42HR21NDGSN30-Lighted-Power-Strip-FIG-3

Step 1

  • Secure LPS to wall by screwing into wall studs or use anchors provided.
  • If running two circuits, one for receptacles, one for lighting, connect fixture wires to appropriate Romex wires.
  • BLACK to BLACK. WHITE to WHITE. Ground all GREEN wires to PEM studs inside of back frame.

Step 2

  • When connecting 2 or more LPS fixtures, run Romex from fixture to fixture. Ground each section to the next.

Step 3

  • To terminate last LPS, use wire nuts on ends of wires.

Step 4

  • Snap cover in place and turn power on.

Lighted Power Strip DV Series

Wiring Diagram for 18-1/2″ LPS WITH Built-In Power Supply

Wiring Diagram for Combined Light & Receptacle Circuit – Non Dimmable

TASK-power-LP42HR21NDGSN30-Lighted-Power-Strip-FIG-4

Wiring Diagram for Separate Light & Receptacle Circuits

TASK-power-LP42HR21NDGSN30-Lighted-Power-Strip-FIG-5

Lighted Power Strip RM Series
Installation Instructions for LPS WITHOUT Built-In Power Supply

General Guidelines

  • Power source MUST be a 20 amp branch circuit protected by a GFCI at the panel or GFCI prior to the connection at LPS.
  • All wiring must meet NEC® and local codes.
  • Light valance recommended.
  • Firmly insert plug straight into receptacle, applying equal pressure to both blades at the same time. Gently rock plug, if needed.

TASK-power-LP42HR21NDGSN30-Lighted-Power-Strip-FIG-6

Turn power off at panel. Carefully pry open each piece with tool (provided). Insert Romex connector into knockout hole inside of back frame. Pull wires into LPS.

TASK-power-LP42HR21NDGSN30-Lighted-Power-Strip-FIG-7

Remote Power Supply- 120V Entry

Step 1

  • Secure LPS to wall by screwing into wall studs or use anchors provided. Connect BLACK to BLACK, WHITE to WHITE. Ground all GREEN wires to PEM studs inside of back frame.

Step 2

  • When connecting two LPS, run Romex from fixture to fixture. Ground each section to the next.

Step 3

  • To terminate last LPS, use wire nuts on ends of wires.

Remote Power Supply-Low Voltage Entry

Step 4

  • Using appropriate knockout hole, pull low voltage wire from remote power supply into the low voltage space, connect BLACK wire (negative) to BLACK wire from lights and RED wire (positive) to RED wire.

Step 5

  • Snap cover in place and turn power on.

CONTACT

  • Customer Service:
  • 800.445.6404
  • Design Services/Technical Support:
  • 866.848.9094
  • TaskLighting.com

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

TASK power User Manuals

Related Manuals