Eaton DC22 Green Motion Building EV Charger User Guide
- June 17, 2024
- EATON
Table of Contents
Eaton DC22 Green Motion Building EV Charger
Specifications:
- Manufacturer: Eaton
- Model: Green Motion Building EV Charger
- Certification: Eichrecht certified
- Charging Capacity: 11 kW (Green Motion Building version) / 22 kW (Green Motion Building EV charger version)
Product Usage Instructions
Preparation and Mounting:
Before installation, ensure you have read and understood the step-by-step
instructions from the latest installation and user manuals available at
www.eaton.com/greenmotionBuilding.
Mount the Green Motion Building on the wall or column as per the provided
instructions.
Electrical Connections and Unit Switch-On:
- Make sure to unplug the Green Motion Building during installation.
- Follow the wiring diagram provided in the user manual for correct electrical connections.
- Switch on the unit after completing the electrical connections as per the provided guidelines.
Configuration and Commissioning:
- Limit the maximum capacity of the charger based on your requirements using the configuration settings.
- Refer to Table 1 for configurations to limit the maximum capacity of the EV charger.
FAQ:
-
Q: Who should install the Green Motion Building EV charger?
A: The Green Motion Building must be installed only by professional and qualified personnel. -
Q: What is the maximum charging capacity of the Green Motion Building EV charger?
A: The charging capacity varies based on the version – 11 kW for the Green Motion Building and 22 kW for the Green Motion Building EV charger.
Never turn on equipment when there is evidence of fire or structural damage.
Preparation and mounting
Instructions
- The Green Motion Building is intended for indoor or outdoor installation.
- The optimal operation of the unit is in the temperature range of -25 °C to +45 °C.
- The unit must be transported and stored in indoor locations in the temperature range of -25 °C to +45 °C.
- The unit must be used and stored in locations with relative humidity below 95%.
- The unit must be used below a maximum altitude of 2000 m above sea level.
- The unit must be used in locations free from acids, gases, or other corrosive substances.
- In the case of a wall-mounted unit, the surface of the wall must be able to carry the unit’s weight (max. 8 kg).
- In case of missing accessories, contact your Eaton technical support representative using the email address BGTechSupport@eaton.com.
The contents of the Green Motion Building box
- Green Motion Building EV charger,
- Quick start guide,
- Safety guidelines,
- EV connector, depending on customer configuration:
- Type 2 connector with cable (Mode 3),
- Type 2 connector with female socket (Mode 3),
- Four adhesive gaskets,
- Drilling template,
- Spacers (T2 with shutter model),
- Floor-mounted column (optional),
- Cable holder (optional).
- Ethernet Connection Kit
Mounting the Green Motion Building on the wall
- Use a spirit level to place the drilling template on the wall. Make sure the template’s top is at a height of 1500 mm from ground level, for optimal accessibility.
- Mark the holes with a pencil and remove the installation template.
- Drill four holes in the wall corresponding to the mounting slots of the Green Motion Building, as shown in Figure 1.
- Place four gaskets around the four slots on the outside of the unit, as shown in Figure 2.
- Fix the unit to the wall with four ⌀6 mm screws.
- The appropriate type of plastic plugs and screws must be selected by a professional installer, based on the following considerations: the installation location,
- the type of the wall.
Mounting the Green Motion Building on the column (optional)
- For instructions on how to install the Green Motion Building on a floor-mounted column, please refer to the Green Motion Building documentation on www.eaton.com. Installation checklist for Eaton Green Motion chargers
- Please visit the link or scan the QR code (Figure 7) to fill out the installation checklist form: https://content.eaton.com/en-gb-installation-checklist-ev-chargers
WARNING
Green Motion Building must be installed only by professional and qualified
personnel.
During installation, unplug Green Motion Building. Read and understand the
safety instructions and warnings before installation.
Prior to installation, it is required to download (www.eaton.com/greenmotionBuilding), read, and understand the step-by-step instructions from the latest installation and user manuals.
Electrical connections and unit switch-on
Standard wiring
- Each EV charger must be connected via a separate RCD (Residual Current Device / fault-current circuit breaker), if required by local regulations. No other consumers may be connected to this circuit (Figure 3).
- Refer to the installation manual and local standards for further details on requirements in terms of circuit breakers and minimal cross-sections of conductors.
Electrical connections and terminals
- Open the housing of the Green Motion Building by unscrewing the eight screws as indicated in Figure 4.
- When removing the cover of the unit, please make sure to not break any cables from the electronic board.
- Disconnect the connection cables from the front cover.
- Insert the power supply cable from the bottom of the unit.
Remove the cable glands, if necessary.
- The electrical connection is made on the power supply terminals located at the bottom-right of the electronic board of the unit (Figure 5).
- In case of three phases, connect the phase (L1, L2, L3), neutral (N), and earth (PE) wires of the AC (distribution) grid to the power supply terminal block respecting the correct assignment (Figure 5).
- In case of single phase, connect the phase (L1), neutral (N) and earth (PE) wires of the AC (distribution) grid to the power supply terminal block respecting the correct assignment (Figure 5).
- It is prohibited to connect the unit to a grid circuit with a 3-phase IT grid configuration
Limit maximum capacity
- You can limit the output power of the Green Motion Building through the switch DP1 located on the backside of the front cover.
- Refer to Table 1 to select the appropriate configuration of the unit depending on the maximum capacity of your electrical installation. Unit switch-on
- In case of a wall-mounted Green Motion Building: Check that the unit is correctly fixed to the wall by local regulations.
- In case of a unit mounted on a column: Check that the unit and the column are correctly installed by local regulations.
- Check that the AC GRID connections have been made correctly by local regulations.
- Perform the checks on the continuity of the connections of the protective conductor, insulation resistance, RCD triggering current, triggering time, etc., by local regulations.
- Verify that the housing cover is closed and secured with the fixing screws.
- Place the installer’s warranty seals at the locations specified in the Installation Manual as on Figure 8.
- If the checks listed above were successful, proceed as follows:
- Turn on the AC GRID circuit breakers.
- Wait for the LED light to turn on.
Configuration and commissioning of the charger
- Refer to the installation manual for instructions on configuration and commissioning steps.
- To remove the plug from the charger, you need to pull the plug vertically and then horizontally as indicated in Figure 6.
- To connect to the commissioning page through Ethernet, use http://192.168.51.1/
- Use the unique password provided to connect to the charger through Wi-Fi and connect to http://192.168.53.1/
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>