DELAVIN B707 Semi Frameless Double Sliding Tub Door Installation Guide

June 17, 2024
DELAVIN

INSTALLATION INSTRUCTIONS


SHOWER DOORS • TUB DOORS

MODELS:

SHOWER DOORS: B101/B101B
TUB DOORS: B707/B707B

PREPARATION
  1. We strongly recommend that this product be installed by a licensed and insured professional contractor, including the assistance of a second person during installation.
  2. After opening all boxes and packages, please read this introduction carefully. Check that all required parts are included in the package by marking all components on the Shower Door Components Detail Sheet. Inspect boxes and packages for shipping damage. If the unit has been damaged, has a finishing defect or has missing parts, please contact our customer support department within 3 business days of the delivery date. Please note that DELAVIN will not replace any damaged products or missing parts free of charge after 3 business days or if the product has been installed. Feel free to contact DELAVIN if you have any questions. Attention: Please double check the glass corners and four edges of the two glass doors to ensure that all glass is in perfect condition and without any breakage. Do not attempt to install a shower door if the glass corners are broken.
  3. Please note that if you are in doubt about installation compliance standards, please consult your local building codes. Building and plumbing codes may vary by location and DELAVIN is not responsible for your project’s code compliance standards and does not accept any returns.
  4. Before installation, make sure the installation surface is leveled and solid, and can support the total weight of the unit. Also, make sure the walls are at right angles. Irregular mounting surface levels or improper angle of side walls will cause serious problems during installation. Note that some adjustments and drilling may be required during installation.
  5. Protect all major surfaces of the product during installation. Never place glasses directly on tile floors. Leave the corner protector in place until it needs to be removed. Always use a piece of wood or cardboard to protect the bottom edges and corners of the glass before and during installation.
TOOLS REQUIRED

OTHER TOOLS MAY BE REQUIRED

| | |
---|---|---|---
Level| Tape Measure| Pencil|

Phillips Screwdriver

| | |
Drill bit| Drill bit| Silicone|

Metal File

| | |
Power Drill| Hammer|

Miter saw or Hacksaw

DELAVIN B707 Semi Frameless Double Sliding Tub Door 1

#| ITEM|

Qty

---|---|---

1

| Wall Profile|

2pcs

2

| Upper Guide Rail|

1pc

3

| Door Glass|

2pcs

4

| Wall Profile Bumpers|

4pcs

5

| Guide Block|

3pc

6

| Roller Assembly|

4pcs

7

| Roller Connector|

4pcs

8

| Towel Bar|

2pcs

9

| Plastic Wall Anchor|

4pcs

10

| Roller Screw|

4pcs

11

| Truss Head Self-Tapping Screw 4×12|

2pcs

12

| Truss Head Self-Tapping Screw 4×16|

6pcs

13

| Truss Head Self-Tapping Screw 4×50|

4pcs

14

| Allen Wrench|

3pc

15

| Bottom Guide Rail |

1pc

TEAR OFF THE GLASS PROTECTIVE FILM BEFORE INSTALLATION

Installation steps

1. Measure the finished opening width at the bottom and at the top (at the model height: 59″ for tub or 75″ for shower). Measure and appropriate adjust the size of the upper rail (#02) and bottom rail (#15) according to the width measured above. (The Bottom Guide Rail (#15) needs to be cut equally from both ends to keep the center guide holes centered.) Also check the threshold for level and the walls for plumb.

DELAVIN B707 Semi Frameless Double Sliding Tub Door 2

2. Place the Bottom Guide Rail (#15) onto the threshold in the desired position. Use a tape measure to align it evenly with the front edge of the threshold and mark its position on the threshold.
TIP: Use the left and right Wall profiles (#01) to center the Bottom Guide Rail (#15) on the threshold to maintain the proper spacing from the walls.

3. Place the left and right Wall profiles (#01) and wall horizontally, stand on both ends of the Bottom Guide Rail (#15) and mark the position of the 4 fixed holes on the left and right Wall profiles (#01).
Remove the wall profile and drill holes and insert the Wall anchors (#09).

4. After placing the Wall anchors (#09), place back the two side Wall Profile (#01) on the ends of the Bottom Guide Rail (#15) against the wall.
Replace the cross drill bit of the electric drill, match the holes on Wall Profile Bumpers (#04) with the four holes on the wall in the previous step, use 4 x 50 screws (#13)to fix (1*#13 for each hole), and cover the holes with the decorative caps.

  DELAVIN B707 Semi Frameless Double Sliding Tub Door
7

5. Position the Bottom guide rail (#15) on the threshold and mark the threshold through the center guide holes for drilling.
Remove the Bottom guide rail (#15) and drill into the thresohold:
Apply silicone to the bottom surface of the Bottom guide rail (#15) and place it back into position on the threshold.
Attach the Guide block (#05) and Bottom guide rail (#15) to the threshold using two of the 4 x16 screws (#12). Cover the screw holes with the decorative caps.

6. Disassemble Roller Connector (#07) into three parts: two screws, the upper part is added with a spacer, and the lower part is added with a spacer.
Then connect the upper part of (#07) to Roller Screw (#10) as shown in the figure, and then tighten the other end of Roller Screw (#10) to Roller Assembly (#06). Finally, 3 groups are obtained as shown.

  1. two paths

7. Put the part with the Roller Assembly (#06) assembled above into the two paths of the Upper Guide Rail (#02) as shown in the figure, and placing two in each path.

 DELAVIN B707 Semi Frameless Double Sliding Tub Door
14

8. Put the Upper Guide Rail(#02) (with 4 rollers (#06) part installed) on top of the two side frames.

  1. keep some distance

9. Let someone else lift one Door Glass(#03), align the protruding point on the Roller Assembly (#06) assembled above with the hole above the glass, and fix the other part that was dismantled on page eight with the two screws on the Upper Guide Rail.
A piece of Door Glass is held in place with two rollers in each path. Leave a little space between the Door Glass and Guide Block (#05) as shown, so that the glass can move more flexibly.
After fixing the glass, use Screw 4×12#11) at both ends of the Upper Guide Rail (#02) to lock the side Wall Profile(#01) and the Upper Guide Rail.
The other Door Glass is also installed in the same way.

  1. Glass

10. Disassemble the Towel bars (#08) as shown in the picture, make sure there is a rubber sheet (protective glass) between the glass on both sides and the Towel bars, and fix it on the Towel bars hole of the glass.
(Note: The accessories that need to be installed on the Towel bars are already on the handle, and they need to be unscrewed and installed as shown in the figure.

11. Apply good quality mildew-resistant silicone to the entire interior perimeter where the wall profile meets the wall and along the threshold.
Allow 24 hours for the silicone to fully cure before using the shower.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals