MORNINGSTAR PS-MPPT-25 ProStar MPPT Solar Charging System Controller Instruction Manual
- June 17, 2024
- Morningstar
Table of Contents
- MORNINGSTAR PS-MPPT-25 ProStar MPPT Solar Charging System Controller
- Product Information
- Product Usage Instructions
- Configuration
- Wiring
- Operation
- Programming with Meter Display
- FAQ
- ProStar MPPT Operator’s Manual
- Installation Safety Precautions
- GENERAL INFORMATION
- INSTALLATION INSTRUCTIONS
- CURRENT POWER VOLTAGE
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
MORNINGSTAR PS-MPPT-25 ProStar MPPT Solar Charging System Controller
Product Information
Specifications
- Nominal Battery Voltage: 12/24V
- Max. PV Open Circuit Voltage: 120V
- Nominal Max. Input Power: 350W (PS-MPPT-25), 560W (PS-MPPT-40)
- Max. Battery Charging Current: 25A (PS-MPPT-25), 40A (PS-MPPT-40)
- Rated Load Current: 25A (PS-MPPT-25), 30A (PS-MPPT-40)
Product Usage Instructions
Installation
Before installing the ProStar MPPT Solar Charging System Controller, please
follow these steps:
- Read and understand all safety instructions provided in the manual.
- Ensure you have all the necessary tools and equipment for installation.
- Choose a suitable location for installation, considering factors such as proper ventilation and protection from environmental elements.
Configuration
To configure the ProStar MPPT Solar Charging System Controller:
- Refer to the manual for specific configuration options and settings.
- Use the provided accessories, if necessary, to customize the controller according to your requirements.
Mounting
Follow these steps to mount the ProStar MPPT Solar Charging System
Controller:
- Select a sturdy and secure mounting surface.
- Use appropriate mounting hardware to securely attach the controller to the surface.
Wiring
Proper wiring is essential for the correct operation of the ProStar MPPT Solar Charging System Controller. Follow these guidelines:
Wire Sizing
Choose the appropriate wire size based on the distance between the
controller and the connected components. Refer to section 3.4.1 in the manual
for detailed wire sizing information.
Required Overcurrent Protection Devices
Install the necessary overcurrent protection devices as specified in
section 3.4.2 of the manual.
Wiring Connections
Connect the wires according to the wiring diagram provided in section 3.4.3
of the manual.
Operation
The ProStar MPPT Solar Charging System Controller offers various features and settings for efficient operation. Follow these instructions:
TrakStar MPPT Technology
Understand how the TrakStar MPPT Technology works to optimize power
generation from your solar panels. Refer to section 4.1 of the manual for
detailed information.
Battery Charging Information
Learn about the battery charging process and how to ensure optimal charging
performance. Refer to section 4.2 of the manual for detailed information.
Load Control Information
Manage the load connected to the controller effectively using the load
control features. Refer to section 4.3 of the manual fordetailed information.
LED Indications
Interpret the LED indications on the controller to monitor its status and
operation. Refer to section 4.4 of the manual for detailed information.
Power-up
Understand the LED behavior during power-up. Refer to section 4.4.1 of the
manual for detailed information.
Status LED
Learn how the status LED provides information about the controller’s
operating status. Refer to section 4.4.2 of the manual for detailed
information.
State-of-charge LEDs
Use the state-of-charge LEDs to estimate the battery’s remaining capacity.
Refer to section 4.4.3 of the manual for detailed information.
Push-button Use in Non-Metered Version
If you have a non-metered version of the controller, understand how to use
the push-buttons for configuration and operation. Refer to section 4.5 of the
manual for detailed information.
Alarms
Be aware of the different alarm indications and their meanings. Refer to
section 4.6 of the manual for detailed information.
Custom Settings
Explore the custom settings available for advanced configuration of the
controller. Refer to section 4.7 of the manual for detailed information.
Programming with Meter Display
Learn how to program the controller using the meter display. Refer to section 4.7.1 of the manual for detailed information.
Programming in MSView
If you have MSView software, discover how to program the controller using
it. Refer to section 4.7.2 of the manual for detailed information.
Meter Display Operation
Understand how to operate and navigate the meter display. Refer to section
4.7.3 of the manual for detailed information.
Directional Key Use and Operation / Navigating the Meter Map
Learn how to use the directional keys to navigate the meter display and
access various settings. Refer to section 4.7.3.1 of the manual for detailed
information.
Adjusting the Meter Display
Adjust the meter display settings for optimal visibility and readability.
Refer to section 4.7.3.2 of the manual for detailed information.
FAQ
Q: Can I use higher power solar arrays with the ProStar MPPT Solar
Charging System Controller?
A: Yes, the controller can handle higher power arrays without damaging the
controller.
TM
ProStar MPPT
Solar Charging System Controller
Installation, Operation and Maintenance Manual
MAXIMUM POWER POINT TRACKING
MODELS PS-MPPT-25 PS-MPPT-25M PS-MPPT-40 PS-MPPT-40M
DIMENSIONS [inches (centimeters)] 7.88 ( 20.0 )
6.69 ( 17.0 )
6.69 ( 17.0 )
4.92 ( 12.5 )
7.62 ( 19.4 )
2.76 ( 7.0 )
SPECIFICATION SUMMARY
PS-MPPT-25 PS-MPPT-40
Nominal Battery Voltage
12/24V
12/24V
Max. PV OpenCircuit Voltage* Nominal Max. Input
Power** Max. Battery Charging Current Rated Load Current
120V 350 / 700W
25A 25A
120V 560 / 1120W 40A 30A
*Array voltage should never exceed this limit
**These power levels refer to the maximum wattage the PS-MPPT can process. Higher power arrays can be used without damaging the controller.
ProStar MPPT Operator’s Manual
1.0 IMPORTANT SAFETY INSTRUCTIONS
SAVE THESE INSTRUCTIONS. This manual contains important safety, installation,
operating and maintenance instructions for the ProStar MPPT solar controller.
The following symbols are used throughout this manual to indicate potentially
dangerous conditions or mark important safety instructions:
WARNING: Indicates a potentially dangerous condition. Use extreme caution when
performing this task. CAUTION: Indicates a critical procedure for safe and
proper operation of the controller. NOTE: Indicates a procedure or function
that is important to the safe and proper operation of the controller.
CONSIGNES IMPORTANTES DE SÉCURITÉ CONSERVEZ CES INSTRUCTIONS: Ce manuel
contient des instructions importantes de sécurité, d’installations et
d’utilisation du contrôleur solaire ProStar MPPT. Les symboles suivants sont
utilisés dans ce manuel pour indiquer des conditions potentiellement
dangereuses ou des consignes importantes de sécurité.
AVERTISSEMENT: Indique une condition potentiellement dangereuse. Faites preuve
d’une prudence extrême lors de la réalisation de cette tâche. PRUDENCE:
Indique une procédure critique pour l’utilisation sûre et correcte du
contrôleur. REMARQUE: Indique une procédure ou fonction importante pour
l’utilisation sûre et correcte du contrôleur.
ProStar MPPT Operator’s Manual
1
1.0
Safety Information
· Read all of the instructions and cautions in the manual before beginning
installation.
· There are no user serviceable parts inside the ProStar MPPT. Do not
disassemble or attempt to repair the controller.
WARNING: Risk Of Electrical Shock. NO POWER OR ACCESSORY TERMINALS ARE
ELECTRICALLY ISOLATED FROM DC INPUT, AND MAY BE ENERGIZED WITH HAZARDOUS SOLAR
VOLTAGE. UNDER CERTAIN FAULT CONDITIONS, BATTERY COULD BECOME OVER-CHARGED.
TEST BETWEEN ALL TERMINALS AND GROUND BEFORE TOUCHING.
WARNING: THE COMMUNICATIONS PORT IS CONSIDERED TO BE DVC B. AN EXTERNAL
ISOLATOR IS REQUIRED IF IT IS TO BE CONNECTED TO A DVC A CIRCUIT. · External
solar and battery disconnects are required. · Disconnect all sources of power
to the controller before installing or adjusting the ProStar MPPT. · There are
no fuses or disconnects inside the ProStar MPPT Do not attempt to repair.
Informations de Sécurité
· Lisez toutes les instructions et les avertissements figurant dans le manuel
avant de commencer l’installation.
· Le ProStar MPPT ne contient aucune pièce réparable par l’utilisateur. Ne
démontez pas ni ne tentez de réparer le contrôleur.
AVERTISSEMENT: Risque De Choc Électrique. NON ALIMENTATION OU AUX BORNES
D’ACCESSOIRES SONT ISOLÉS ÉLECTRIQUEMENT DE L’ENTRÉE DE C.C ET DOIT ÊTRE
ALIMENTÉS À UNE TENSION DANGEREUSE SOLAIRE. SOUS CERTAINES CONDITIONS DE
DÉFAILLANCE, LA BATTERIE POURRAIT DEVENIR TROP CHARGÉE. TEST ENTRE TOUTES LES
BORNES ET LA MASSE
AVANT DE TOUCHER.
2
Important Safety Instructions
AVERTISSEMENT: LE PORT DE COMMUNICATION EST CONSIDÉRÉE COMME DVC B. UN
ISOLATEUR EXTERNE N’EST NÉCES SAIRE SI C’EST D’ÊTRE CONNECTÉ À UN DVC UN
CIRCUIT.
· External solaire et la batterie se déconnecte sont nécessaires.
· Déconnectez toutes les sources d’alimentation du contrôleur avant
d’installer ou de régler le ProStar MPPT.
· Le ProStar MPPT ne contient aucun fusible ou interrupteur. Ne tentez pas de
réparer.
· Installez des fusibles/coupe-circuits externes selon le besoin.
Installation Safety Precautions
WARNING: This unit is not provided with a GFDI device. This charge controller
must be used with an external GFDI device as required by the Article 690 of
the National Electrical Code for the installation location.
· Throughout this manual NEC guidance has been provided in order to meet
general safety requirements and to inform of best installation practices. It
is the installer’s responsibility to ensure that the installation complies
with all local safety and code requirements.
· Mount the ProStar MPPT indoors. Prevent exposure to the elements and do not
allow water to enter the controller.
· Install the ProStar MPPT in a location that prevents casual contact. The
ProStar MPPT heatsink can become very hot during operation.
· Use insulated tools when working with batteries. · Avoid wearing jewelry
during installation. · The battery bank must be comprised of batteries of same
type, make, and age. · UL/IEC 62109 certified for use in negative ground or
floating systems only.
ProStar MPPT Operator’s Manual
3
1.0
· Do not smoke near the battery bank. · Power connections must remain tight to
avoid excessive
heating from a loose connection. · Use properly sized conductors and circuit
interrupters. · The grounding terminal is located in the case, and is
identified by the symbol below:
Ground Symbol
· This charge controller is to be connected to DC circuits only. These DC
connections are identified by the symbol below:
Direct Current Symbol
The ProStar MPPT controller must be installed by a qualified technician in
accordance with the electrical regulations of the country of installation.
A means of disconnecting all power supply poles must be provided. These
disconnects must be incorporated in the fixed wiring.
The ProStar MPPT negative power terminals are common, and must be grounded as
instructions, local codes, and regulations require.
A permanent, reliable earth ground must be established with connection to the
ProStar MPPT ground terminal.
The grounding conductor must be secured against any accidental detachment.
4
Important Safety Instructions
Précautions de Sécurité D’installation
AVERTISSEMENT: L’appareil n’est pas fourni avec un dispositif GFDI. Ce
contrôleur de charge doit être utilisé avec un dispositif GFDI externe tel que
requis par l’Article 690 du Code électrique national de l’emplacement de
l’installation.
· Tout au long de ce manuel, des conseils NEC ont été fournis afin de répondre
aux exigences générales de sécurité et d’informer sur les meilleures pratiques
d’installation. Il est de la responsabilité de l’installateur de s’assurer que
l’installation est conforme à toutes les exigences de sécurité et de code
locales.
· Montez le ProStar MPPT à l’intérieur. Empêchez l’exposition aux éléments et
la pénétration d’eau dans le contrôleur.
· Installez le MPPT ProStar dans un endroit qui empêche le contact
occasionnel. Le dissipateur de chaleur ProStar MPPT peut devenir très chaud
pendant le fonctionnement.
· Utilisez des outils isolés pour travailler avec les batteries. · Évitez le
port de bijoux pendant l’installation. · Le groupe de batteries doit être
constitué de batteries du
même type, fabricant et âge. · UL/IEC 62109 certifié pour utilisation au
négatif à la
masse ou les systèmes flottants seulement. · Ne fumez pas à proximité du
groupe de batteries. · Les connexions d’alimentation doivent rester serrées
pour éviter une surchauffe excessive d’une connexion desserrée. · Utilisez des
conducteurs et des coupe-circuits de dimensions adaptées.
ProStar MPPT Operator’s Manual
5
1.0
· La borne de mise à la terre se trouve dans l’affaire et est identifié par le symbole ci-dessous :
· Ce contrôleur de charge ne doit être connecté qu’à des circuits en courant continu. Ces connexions CC sont identifiées par le symbole ci-dessous:
Le régulateur MPPT ProStar doit être installé par un technicien qualifié
conformément aux règlements du pays d’installation électriques.
Un moyen de déconnexion de tous les poteaux d’alimentation doit être fourni.
Ceux-ci se déconnecte doit être intégrée dans le câblage fixe.
Une mise à la terre permanent et fiable s’impose avec raccordement à la borne
ProStar MPPT.
Les bornes de puissance négative ProStar MPPT sont communs et doivent être
mise à la terre comme les directives, les codes locaux, et les règlements
exigent.
Le conducteur de terre doit être protégée contre tout détachement accidentel.
6
Important Safety Instructions
Battery Safety
WARNING: A battery can present a risk of electrical shock or burn from large
amounts of short-circuit current, fire, or explosion from vented gases.
Observe proper precautions.
AVERTISSEMENT: Une batterie peut présenter a ris que de choc électrique ou de
brûlure de grandes quantités de court-circuit curlouer, incendie ou explosion
de ventilé gaz. Observer précautions appropriées.
WARNING: Risk of Explosion. Proper disposal of batteries is required. Do not
dispose of batteries in fire. Refer to local
AreVgEuRlTaItSioSnEsMoErNcoT:deRsisfqoureredq’Euxirpelmoseionnts. . Au rebut
des piles est nécessaire. Ne pas jeter les piles dans le feu. Se référer aux
réglementations locales ou des codes pour les exigences.
CAUTION: When replacing batteries, use properly specified number, sizes,
types, and ratings based on application and system design.
PRUDENCE: Lorsque le remplacement des piles, utilisez correctement nombre
spécifié, tailles, types et les évaluations basées sur conception de système
et d’application.
CAUTION: Do not open or mutilate batteries. Released electrolyte is harmful to
skin, and may be toxic.
PRUDENCE: Ne pas ouvrir ou mutiler les piles. L’électrolyte est nocif pour la
peau et peut être toxique.
· Servicing of batteries should be performed, or supervised, by personnel
knowledgeable about batteries, and the proper safety precautions.
· Be very careful when working with large lead-acid batteries. Wear eye
protection and have fresh water available in case there is contact with the
battery acid.
ProStar MPPT Operator’s Manual
7
1.0
· Remove watches, rings, jewelry and other metal objects before working with
batteries.
· Wear rubber gloves and boots · Use tools with insulated handles and avoid
placing tools
or metal objects on top of batteries. · Disconnect charging source prior to
connecting or
disconnecting battery terminals. · Determine if battery is inadvertently
grounded. If so,
remove the source of contact with ground. Contact with any part of a grounded
battery can result in electrical shock. The likelihood of such a shock can be
reduced if battery grounds are removed during installation and maintenance
(applicable to equipment and remote battery supplies not having a grounded
supply circuit). · Carefully read the battery manufacturer’s instructions
before installing / connecting to, or removing batteries from, the ProStar
MPPT. · Be very careful not to short circuit the cables connected to the
battery. · Have someone nearby to assist in case of an accident. · Explosive
battery gases can be present during charging. Be certain there is enough
ventilation to release the gases.
· Never smoke in the battery area. · If battery acid comes into contact with
the skin, wash
with soap and water. If the acid contacts the eye, flood with fresh water and
get medical attention.
· Be sure the battery electrolyte level is correct before starting charging.
Do not attempt to charge a frozen battery.
· Recycle the battery when it is replaced.
· Entretien des batteries devrait être effectué ou supervisé, par un personnel
bien informé sur les piles et les précautions de sécurité appropriées.
· Soyez très prudent quand vous travaillez avec des grandes batteries au
plomb. Portez des lunettes de protection et ayez de l’eau fraîche à
disposition en cas de contact avec l’électrolyte.
8
Important Safety Instructions
· Enlevez les montres, bagues, bijoux et autres objets mé talliques avant de
travailler avec des piles.
· Porter des bottes et des gants de caoutchouc · Utiliser des outils avec
poignées isolantes et évitez de
placer des outils ou des objets métalliques sur le dessus de batteries. ·
Débrancher la source de charge avant de brancher ou dis-reliant les bornes de
la batterie. · Utilisez des outils isolés et évitez de placer des objets
métalliques dans la zone de travail. · Déterminer si batterie repose par
inadvertance. Dans l’affirmative, supprimer la source du contact avec le sol.
Contact avec n’importe quelle partie d’une batterie mise à la terre peut
entraîner un choc électrique. La probabilité d’un tel choc peut être réduite
si des motifs de batterie sont supprimés pendant l’installation et
maintentretien (applicable à l’équipement et les fournitures de pile de la
télécommande n’ayant ne pas un circuit d’alimentation mise à la terre). ·
Lisez attentivement les instructions du fabricant de la batterie avant
d’installer / connexion à ou retrait des batteries du ProStar MPPT. · Veillez
à ne pas court-circuiter les câbles connectés à la batterie. · Ayez une
personne à proximité qui puisse aider en cas d’accident. · Des gaz explosifs
de batterie peuvent être présents pendant la charge. Assurez-vous qu’une
ventilation suffisante évacue les gaz. · Ne fumez jamais dans la zone des
batteries
· En cas de contact de l’électrolyte avec la peau, lavez avec du savon et de
l’eau. En cas de contact de l’électrolyte avec les yeux, rincez abondamment
avec de l’eau fraîche et consultez un médecin.
· Assurez-vous que le niveau d’électrolyte de la batterie est correct avant de
commencer la charge. Ne tentez pas de charger une batterie gelée.
· Recyclez la batterie quand elle est remplacée.
ProStar MPPT Operator’s Manual
9
1.0
2.0
GENERAL INFORMATION
2.1 Overview
Thank you for choosing the ProStar MPPT charge controller with TrakStarTM MPPT
Technology. The ProStar MPPT is an advanced maximum power point tracking solar
battery charger. The controller features a smart tracking algorithm that finds
and maintains operation at the power source’s peak power point, maximizing
energy harvest.
The ProStar MPPT battery charging process has been optimized for long battery
life and improved system performance. Self-diagnostics and electronic error
protections prevent damage when installation mistakes or system faults occur.
The controller also features eight (8) adjustable settings switches, several
communication ports, and terminals for remote battery temperature and voltage
measurement.
Please take the time to read this operator’s manual to become familiar the
many benefits the ProStar MPPT can provide for your PV systems, for example:
· Rated for 12 or 24 volt systems, and 25 or 40 amps of charging current
· Fully protected with automatic and manual recovery · Seven standard charging
programs selectable with DIP
switches · Continuous self-testing with fault notification
· LED indications and push-button or meter key functions
· Power terminals sized for #14-2 AWG (2.5-35mm2) wire compliant when used
with the optional Morningstar Wire Box. With standard terminal cover, maximum
wire size is #6 AWG (16mm2) wire.
· Includes battery voltage sense terminals
· Digital meter display options
· Optional remote battery temperature sensor · 5-year warranty (see Section
6.0)
10
General Information
2.2 Regulatory Information
NOTE: This section contains important information for safety and regulatory
requirements.
FCC requirements: This device complies with Part 15 of the FCC rules.
Operation is subject to the following two conditions: (1) This device may not
cause harmful interference, and, (2) this device must accept any interference
received, including interference that may cause undesired operation. Changes
or modifications not expressly approved by Morningstar for compliance could
void the user’s authority to operate the equipment.
NOTE: This equipment has been tested and found to comply with the limits for a
Class B digital device, pursuant to Part 15 of the FCC rules. These limits are
designed to provide reasonable protection against harmful interference in a
residential installation. This equipment generates, uses, and can radiate
radio frequency energy and, if not installed and used in accordance with the
instruction manual, may cause harmful interference to radio communication.
However, there is no guarantee that interference will not occur in a
particular installation. If this equipment does cause harmful interference to
radio or television reception, which can be determined by turning the
equipment on and off, the user is encouraged to try to correct the
interference by one or more of the following measures:
ProStar MPPT Operator’s Manual
11
2.0
2.0
· Re-orient or relocate the receiving antenna. · Increase the separation
between the equipment and
receiver. · Connect the equipment into an outlet on a circuit
different from that to which the receiver is connected.
· Consult the dealer, or an experienced radio/TV technician for help.
This Class B digital apparatus complies with Canadian ICES-003. Cet appareil
numerique de la classe B est conforme a la norme NMB-003 du Canada.
2.3 Versions and Ratings
PS-MPPT-25 · Rated for maximum 25 amps continuous current
(battery or load) · Designed for 12 or 24 VDC systems PS-MPPT-25M · Includes
metering display · Rated for maximum 25 amps continuous current (battery
or load) · Designed for 12 or 24 VDC systems
PS-MPPT-40 · Rated for maximum 40 amps of continuous battery
current, and 30 amps of continuous load current · Designed for 12 or 24 VDC
systems
PS-MPPT-40M · Includes metering display · Rated for maximum 40 amps continuous
battery current
and 30 amps of continuous load current · Designed for 12 or 24 VDC systems
12
General Information
ProStar MPPT Operator’s Manual
13
2.4 Features
The features of the ProStar MPPT are shown in Figure 2-1 below. An explanation
of each feature is provided.
8 1
2 9
3 10
4
11
12
13 5
6
14
7
15
16
Figure 2-1. PS-MPPT Features
14
General Information
1 – Charging Status / Error LED Shows charging current and error condition
statuses. 2 – Heatsink Aluminum heatsink (underneath) to dissipate controller
heat (the ProStar MPPT is 100% passively cooled for reliability)
3 – Meter Display Digital LCD monitoring and programming display
4 – Battery Status / Fault LED Indicators Three state of charge (SOC) LED
indicators show charging status and controller faults
5 – Solar Positive and Negative Terminals Power connections for Solar (+) and
(-) cable terminations
6 – Load Positive and Negative Terminals Power connections for Load (+) and
(-) cable terminations
7 – Battery Positive and Negative Terminals Power connections for Battery (+)
and (-) cable terminations
8 – Local Temperature Sensor Compensates charging based on ambient temperature
(not used if Remote Temperature Sensor is connected) 9 – Meter Directional
Buttons Used to navigate throughout meter map
10 – DIP Switches Eight (8) settings switches to configure operation of the
ProStar MPPT
11 – MeterBusTM Port RJ-11 socket for Morningstar MeterBusTM network
connections
12 – Grounding Terminal Chassis ground terminal for equipment grounding
13 – Battery Sense Terminals Connection points for battery voltage sensing
wires
14 – Remote Temperature Sensor Terminals (RTS) Connection points for a
Morningstar RTS to remotely monitor battery temperature 15 – Wire Box for
ProStar-MPPT Optional accessory to route wiring through knock-outs 16 – Wire
Box for ProStar-MPPT Knock-outs Knock-outs for routing wires to conduit or
wire gland terminations
ProStar MPPT Operator’s Manual
15
2.0
2.0
2.5 Optional Accessories
The following accessories are available for purchase separately from your
authorized Morningstar dealer:
Remote Temperature Sensor (Model: RTS) The RTS measures battery temperature
for accurate temperature compensation and is recommended when the ambient
battery temperature differs from the ambient controller temperature by more
than 5º C. The standard cable length is 33 ft (10m).
NOTE: The use of a Remote Temperature Sensor is strongly recommended.
Controller location, air flow, and system power can drastically affect the
local temperature sensor reading. An RTS will provide optimal charging
performance.
RM-1 Meter
The digital Remote Meter displays system operating information, error
indications, and self-diagnostic read-out. Information is displayed on a
backlit 4-digit custom LCD display. The large numerical display and icons are
easy to read and large buttons make navigating the meter menus easy.
Additionally, a status LED and three (3) battery SOC LEDs provide system
status at a glance. The meter can be flush mounted in a wall or surface
mounted using the mounting frame (included). The RM-1 is supplied with 33 ft
(10.0 m) of cable, a mounting frame, and mounting screws. The RM-1 connects to
the RJ- 11 Meter port on the ProStar MPPT.
Ground-fault Protection Device (GFPD-150V) The GFPD-150V detects power source
ground faults and interrupts current as required by the U.S. National
Electrical Code.
Wire Box for ProStar MPPT A modular wiring box that can be added to any
version of ProStar MPPT controller. The box acts as a junction (using knock-
outs) to run controller wiring to external conduit, if desired. The wire box
cannot be used with rigid conduit. The communications accessories / adaptors
below should be housed in the Wire Box for ProStar MPPT.
Communications Support:
Ethernet MeterBus Converter (EMC-1) This product is an Ethernet gateway that
provides web monitoring, a Modbus TCP/IP server, and a local web page server.
End users can collect information about their offgrid PV system remotely by
bridging MODBUS TCP/IP requests to serve LiveView pages, or connect with
MSView monitoring software. The EMC-1 supports all products that have a
MeterBus port.
USB Communications Adapter (UMC-1) A modular unit that uses a USB-B plug,
usually from a USB A-B computer cable, and an RJ-11 plug to connect with a
Morningstar controller’s MeterBus port, for monitoring and programming using
MSView PC software.
PC MeterBus AdapterTM (Model: MSC) The MSC converts the MeterBus RJ-11
electrical interface to an isolated standard RS-232 interface which enables
communication between the ProStar MPPT and a personal computer (PC). The MSC
can be used for programming custom charging set-points, and for logging data
in MSView. See Section 4.7 for more information on programming.
16
General Information
ProStar MPPT Operator’s Manual
17
3.0
INSTALLATION INSTRUCTIONS
3.1 General Installation Notes
· Read through the entire installation section first before beginning
installation.
· Be very careful when working with batteries. Wear eye protection. Have fresh
water available to wash and clean any contact with battery acid.
· Use insulated tools and avoid placing metal objects near the batteries.
WARNING: Equipment Damage or Risk of Explosion Never install the ProStar MPPT
in an enclosure with vented/flooded batteries. Battery fumes are flammable and
will corrode and destroy the ProStar MPPT circuits.
! CAUTION: Equipment Damage When installing the ProStar MPPT in an enclosure,
ensure sufficient ventilation. Installation in a sealed enclosure may lead to
over-heating and a decreased product lifetime.
AVERTISSEMENT: Endommagement de l’équipement ou risque d’explosion N’installez
jamais le ProStar MPPT dans une enceinte avec des batteries à évent/à
électrolyte liquide. Les vapeurs des batteries sont inflammables et
corroderont et détruiront les circuits du ProStar MPPT.
! PRUDENCE: Endommagement de l’équipement Assurez une ventilation suffisante
en cas d’installation du ProStar MPPT dans une enceinte. L’installation dans
une enceinte hermétique peut entraîner une surchauffe et une réduction de la
durée de vie du produit.
18
Installation Instructions
· Do not install in locations where water can enter the controller.
· Loose power connections and /or corroded wires may result in resistive
connections that melt wire insulation, burn surrounding materials, or even
cause fire. Ensure tight connections and use cable clamps to secure cables and
prevent them from swaying in mobile applications.
· Preset charging profiles are generally designed for lead acid batteries.
Custom settings can be used for varied charging requirements (see sections 3.2
and 4.7 for details). Note that some battery types may not be compatible.
· The ProStar MPPT battery connection may be wired to one battery, or a bank
of batteries. The following instructions refer to a singular battery, but it
is implied that the battery connection can be made to either one battery or a
group of batteries in a battery bank.
· The ProStar MPPT uses stainless steel fasteners, an anodized aluminum heat
sink, and conformal coating to protect it from harsh conditions. However, for
acceptable service life, extreme temperatures and marine environments should
be avoided.
· The ProStar MPPT prevents reverse current leakage at night, so a blocking
diode is not required in the system.
· The ProStar MPPT is designed to regulate ONLY solar (photovoltaic) power.
Connection to any other type of power source e.g. wind turbine or generator
may void the warranty. However, other power sources can be connected directly
to the battery.
· (3) ferrite chokes are included for individual installation around an RTS
cable, a Meterbus cable and a heatsink ground wire, if used. Each wire must be
looped (at least once) through a ferrite choke, as close to the ProStar MPPT
as possible, to meet FCC Class B EMI requirements.
ProStar MPPT Operator’s Manual
19
3.0
! CAUTION: For hazardous location IECEx/ATEX applications, see the addendum –
part no. MS-003244-EN -to this manual.
! PRUDENCE: Pour les applications en environnement dangereux IECEx / ATEX,
voir l’addendum – référence MS-003244FR – à ce Manuel.
WARNING: Risk of Fire Battery, load and PV array disconnects and overcurrent
protection are required in the system. These protection devices are external
to the ProStar MPPT controller. See Section 3.4.2 Required Overcurrent
Protection Devices (OCPD) and Disconnect Switches.
AVERTISSEMENT : Risque d’incendie Des déconnexions de batterie, de charge et
de générateur photovoltaïque et une protection contre les surintensités sont
nécessaires dans le système. Ces dispositifs de protection sont externes au
contrôleur ProStar MPPT. Voir Section 3.4.2 Dispositifs de protection contre
les surintensités (OCPD) et interrupteurs de déconnexion requis.
WARNING: Installation must comply with all US National Electrical Code and
Canadian Electrical Code requirements.
AVERTISSEMENT: Installation doit être conforme à toutes les exigences US
National Electrical Code et Code Canadien d’Electricité.
WARNING: Minimum over-current protection device interrupt ratings must be
2000A for 12V systems, and 4000A for 24V systems.
AVERTISSEMENT: Protection contre les surintensités minimum cotes
d’interruption de périphérique doivent être de 2000 a 12V systèmes et 4000 a
pour les systèmes de 24V.
20
Installation Instructions
3.2 Configuration
The DIP switch block shown in Figure 3.1 below is used to set the operating
parameters for the ProStar MPPT.
Figure 3.1. DIP Switch Block to set charging parameters
Switch 1: Load / Lighting
Mode Normal Lighting
Switch 1 OFF ON
Switches 2, 3: System Voltage
Three (3) system voltage configurations are available as shown in the table
below:
System Voltage Auto 12 24
Switch 2 OFF OFF ON
Switch 3 OFF ON OFF
NOTE: Before connecting the battery, measure the open-circuit voltage. It must
be over ten volts to start the controller. If the system voltage Settings
Switches are set to Auto-detect, battery voltage over 15.5V will be detected
as a 24V nominal battery, and the unit will charge accordingly. The 12/24V
auto selection is only done at start-up, and the detected system voltage will
never change during operation.
Generally, the specific system voltage is known, and it is best to set DIPs
2,3 accordingly; the auto-detect setting should be used only in rare
circumstances.
ProStar MPPT Operator’s Manual
21
3.0
Switches 4, 5, 6: Battery Type Selection
Preset ProStar MPPT battery charging options are shown in table 3-1 below. All
voltage settings listed are for nominal 12 volt batteries. Multiply the
voltage settings by two (2) for 24 volt systems.
NOTE: These settings are general guidelines for use at the operator’s
discretion. The ProStar MPPT can be programmed to satisfy a wide range of
charging parameters. Consult the battery manufacturer for optimal battery
charge settings.
Battery Charging Set-points (@ 25°C): [multiply voltages by (2) for 24 volt
systems]
DIP Switch Settings 4-5-6
Battery Type
Absorp. Stage (volts)
Float Stage (volts)
Equalize Stage (volts)
Absorp. Time (mins)
Equalize Time (mins)
Equalize Timeout
(mins)
Equalize Interval (days)
off-off-off 1 – Sealed*
14.00
13.50
150
off-off-on 2 – Sealed*
14.15
13.50
14.40
150
60
120
28
off-on-off 3 – Sealed*
14.30
13.50
14.60
150
60
120
28
off-on-on 4- AGM/Flooded 14.40
13.50
15.10
180
120
180
28
on-off-off 5 – Flooded
14.60
13.50
15.30
180
120
180
28
on-off-on 6 – Flooded
14.70
13.50
15.40
180
180
240
28
on-on-off 7 – L-16
15.40
13.40
16.00
180
180
240
14
on-on-on 8 – Custom
Custom Custom Custom Custom Custom Custom Custom
- “Sealed” baery type includes gel and AGM baeries
Table 3.1. Battery charging settings for each selectable battery type
Switch 7: Battery Equalization
Mode Manual Equalization
Auto Equalization
Switch 7 OFF ON
22
Installation Instructions
Switch 8: Meterbus / MODBUS Settings
Mode Meterbus MODBUS
Switch 8 OFF ON
3.3 Mounting
Inspect the controller for shipping damage. Mount the ProStar MPPT to a
vertical surface (4-#8 stainless steel self-tapping screws are included).
Tighten the mounting screws, using care not to crack the plastic case. Do not
install directly over an easily combustible surface since the heat sink may
get hot under certain operating conditions. For proper air flow, allow at
least 15 cm (6 in) of space above and below the controller, and 50 mm (2 in)
at the sides – see Figure 3-2 below. Do not locate in an enclosure where
battery gases can accumulate.
NOTE: The heat sink must be in a vertical position (fins up and down).
ProStar MPPT Operator’s Manual
23
3.0
6 in (15 cm)
2 in (5 cm)
6 in (15 cm)
Figure 3-2. Proper Clearances for Passive Cooling
3.4 Wiring
! CAUTION: Code Requirements U.S. installed wiring must conform to all current
U.S. NEC, ANSI/NFPA 70 requirements, and to any local regulations. Non-U.S.
installations must meet all national and local requirements of the country of
installation.
! ATTENTION : Exigences du code Le câblage installé aux États-Unis doit être
conforme à toutes les exigences actuelles du NEC, de l’ANSI/ NFPA 70 aux
États-Unis et à toute réglementation locale. Les installations non américaines
doivent répondre à toutes les exigences nationales et locales du pays.
24
Installation Instructions
3.4.1 Wire Sizing
The power terminals are sized for #14 – 2 AWG (2.5 – 35 mm2) wire. When inside
an enclosure (maintenance access only) and using the Wire Box accessory, or
without the terminal cover, the maximum wire size of #2 AWG can be used. With
the standard terminal cover, the maximum power terminal wire size is #6 AWG
(16 mm2) with multi-stranded wire, or #8 AWG (10 mm2) with fine-stranded wire.
Use an insulated flathead screwdriver, and torque tightly up to 35 in-lb.
The terminals are rated for copper and aluminum conductors. Use UL-listed
Class B or Class C stranded wire rated for 300 Volt and 75C or higher. Copper
is recommended due to the ease of use, good conductivity, strength and lower
thermal expansion properties.
It is critical that the ampacity (or current carrying capacity) of conductors
is sufficient to handle the maximum current of the power circuits. Good system
design generally requires large conductor wires that limit voltage drop losses
to 2% or less.
See Appendix C – Voltage Drop (distances) Tables – for minimum copper wire
sizing to achieve maximum 2% voltage drops.
WARNING: Fire Hazard If multiple units are used in parallel for more charging
current, the battery conductor wiring must be sized for the total sum of all
current ratings of the combined controllers.
AVERTISSEMENT : Risque d’incendie Si plusieurs unités sont utilisées en
parallèle pour plus de courant de charge, le câblage du conducteur de la
batterie doit être dimensionné pour la somme totale de tous les courants
nominal des contrôleurs combinés.
ProStar MPPT Operator’s Manual
25
3.0
3.4.2 Required Overcurrent Protection Devices (OCPD) and Disconnect Switches
WARNING: Risk of Fire and Shock Battery, load and PV array overcurrent
protection (breakers or fuses) are required in the system. These protection
devices are external to the ProStar MPPT controller, and must be sized as
required by the NEC or local code requirements.
AVERTISSEMENT : Risque d’incendie et choc Une protection contre les
surintensités de la batterie, de la charge et du générateur photovoltaïque
(disjoncteurs ou fusibles) est requise dans le système. Ces dispositifs de
protection sont externes au programmateur ProStar MPPT et doivent être
dimensionnés conformément aux exigences du NEC ou du code local.
WARNING: Risk of Fire and Shock The PV system requires a means of
disconnecting the battery, load and PV array. Breaker switches or disconnect
switches can serve as a disconnecting means and should be located at a readily
accessible location. For best practices and safety guidance see NEC 690 “Part
III Disconnecting Means” for disconnect requirements for PV systems in
addition to other code requirements.
AVERTISSEMENT : Risque d’incendie et de choc Le système PV nécessite un moyen
de déconnecter la batterie, la charge et le générateur PV. Les disjoncteurs ou
les sectionneurs peuvent servir de moyens de déconnexion et doivent être
situés à un endroit facilement accessible. Pour les meilleures pratiques et
les conseils de sécurité, voir NEC 690 “Partie III – Disconnecting Means” pour
les exigences de déconnexion des systèmes PV en plus des autres exigences du
code.
26
Installation Instructions
WARNING: Risk of Fire and Shock
Fuses, single-pole circuit breakers, or single-pole disconnect switches must
only be installed on ungrounded system conductors. The NEC allows and may
require the use of double-pole breakers or double-pole disconnect switches
which break both the grounded and ungrounded conductors of the PV array.
AVERTISSEMENT : Risque d’incendie et choc
Les fusibles, les disjoncteurs unipolaires ou les sectionneurs unipolaires ne
doivent être installés que sur des conducteurs de système non mis à la terre.
Le NEC autorise et peut exiger l’utilisation de disjoncteurs bipolaires ou de
sectionneurs bipolaires qui coupent à la fois les conducteurs mis à la terre
et non mis à la terre du générateur photovoltaïque.
BATTERY DISCONNECT AND OVER-CURRENT PROTECTION DEVICE SIZING
The U.S. NEC requires the installation of DC breakers or fused disconnect
switches in all battery circuits in order to provide both a means of
disconnection and overcurrent protection.
The battery breaker or fused disconnect switch(es) should be located near the
battery or the battery busbar. Where the controller battery terminals are more
than 1.5m (5 feet) from the battery, or where circuits from these terminals
pass through a wall or partition, U.S. NEC requires that a means of
disconnection be provided at the battery and solar controller.
The minimum battery disconnect switch current rating is the current rating of
the controller being installed. To provide over-current protection when using
a disconnect switch, a properly sized fuse or breaker must be installed in
series. Battery breakers or fuses must be sized with a minimum of
ProStar MPPT Operator’s Manual
27
3.0
125% of the continuous output current rating of the solar controller.
Recommended battery circuit fuse or breaker current ratings:
PS-MPPT-25: 40 Amps PS-MPPT-40: 50 Amps
PV INPUT DISCONNECT AND OVER-CURRENT PROTECTION DEVICE SIZING
WARNING: Risk of Fire and Shock The solar array open-circuit voltage (Voc) at
the worstcase (coldest) module temperature must not exceed the PV disconnect
or overcurrent protection voltage ratings.
AVERTISSEMENT : Risque d’incendie et choc La tension en circuit ouvert du
générateur solaire (Voc) à la température de module la plus défavorable (la
plus froide) ne doit pas dépasser les valeurs nominales de tension de
déconnexion PV ou de protection contre les surintensités.
As defined in NEC Section 690.9, PV input disconnect switches must have a
current rating greater than or equal to the maximum PV array current (1.25 X
PV array Isc). PV array Isc = # of strings multiplied by the module Isc (STC)
rating. Note that individual PV string circuits do not require disconnects.
NEC Section 690.9 also provides requirements for overcurrent protection. The
PV input breaker or fuse current rating should not be less than the next
higher breaker rating above 125% of the maximum PV array current (156% of the
PV array Isc). Maximum PV breaker or fuse ratings are:
PS-MPPT-25: 40 Amps PS-MPPT-40: 50 Amps
28
Installation Instructions
String over-current protection is also required for parallel strings and are
typically included with the PV string combiner. There may be other code
requirements specific to the installation of a particular PV array.
If 156% of PV array Isc is greater than the maximum PV input breaker or fuse
current rating, the PV array breaker or fuse should be located at the output
of the PV array combiner.
LOAD DISCONNECT AND OVER-CURRENT PROTECTION DEVICE SIZING
The load output breaker or fused disconnect switch should be near the load
output terminals of the controller. Load fuses should be installed between the
controller output and the load disconnect.
The load output disconnect switch must have a minimum current rating the fuse
current rating but is not required to be higher than the load output current
rating of the controller.
The load fuse or breaker should be sized with a minimum of 125% of the maximum
load output current. The maximum load output current is the sum of the branch
load circuits or the controller load output current rating.
The maximum load output breaker or fuse current rating is:
PS-MPPT-25: 40 Amps PS-MPPT-40: 40 Amps
ProStar MPPT Operator’s Manual
29
3.0
3.4.3 Wiring Connections
S+-
32
S+ S – L+ L – B+ B –
4
7
5
6
To battery (+) and (-) terminals for voltage sensing
1
To properly sized array
To load (+) and (-)
terminals
To battery (+) and (-)
terminals
To battery for temperature
sensing
Figure 3-3. Wiring the PS-MPPT
REFER TO FIGURE 3.3 WHEN USING THE WIRING INSTRUCTIONS BELOW.
NOTE: THE PS-MPPT IS UL 1741 COMPLIANT WHEN USED WITH THE OPTIONAL WIRE BOX.
THE WIRE BOX CANNOT BE USED WITH RIGID CONDUIT. THE PS-MPPT IS UL RECOGNIZED
FOR USE IN A UL LISTED ASSEMBLEY WITHOUT THE WIRE BOX FOR THE PS-MPPT.
30
Installation Instructions
STEP 1: Check Controller Limitations Verify that the highest temperature
compensated solar array open-circuit voltage (Voc), and load current do not
exceed the ratings of the ProStar MPPT version being installed. Multiple
controllers can be installed in parallel on the same battery bank to achieve
greater total charging current. In this type of system, each ProStar MPPT must
have its own solar array. The load terminals of multiple controllers can only
be wired together if the total load draw does not exceed the nameplate current
of the LOWEST rated controller.
STEP 2: Battery Voltage Sense Wires
WARNING: Fire Hazard When connecting Battery Sense Wires, install a 5 Amp fuse
in the (+) sense wire, six inches from the (+) battery terminal.
AVERTISSEMENT : Risque d’incendie
Lors de la connexion des câbles de détection de batterie, installez un fusible
de 5 A dans le câble de détection (+), à six pouces de la borne de la batterie
(+).
Due to connection and cable resistance, voltage drops are unavoidable in power
cables that carry current, including the ProStar MPPT battery cables. If
Battery Sense wires are not used, the controller must use the voltage reading
at the battery power terminals for regulation. This voltage may differ from
the actual battery bank voltage due to voltage drop.
The Battery Voltage Sense connection enables the ProStar MPPT to measure the
voltage at the battery terminals accurately with no voltage drop.
Generally accepted wiring practice is to limit voltage drops between the
charger and the battery to 2%. Even properly sized wiring with 2% drop can
result in a 0.3 volt drop for 14.4V charging. Voltage drops will cause some
undercharging of the battery.
ProStar MPPT Operator’s Manual
31
3.0
The controller will begin Absorption or limit equalization at a lower battery
voltage because the controller measures a higher voltage at the controller’s
terminals than is the actual battery voltage. For example, if the controller
is programmed to start Absorption at 14.4V, when the controller “sees” 14.4
volts at its battery terminals, the true battery voltage would only be 14.1
volts, if there is a 0.3 volt drop between the controller and battery.
Note that the battery sense wires will not power the controller, and the sense
wires will not compensate for losses in the power wires between the controller
and the battery. The battery sense wires are used to improve the accuracy of
the battery charging.
The two sense wires, can range in size from 1.0 to 0.25 mm2 (16 to 24 AWG),
and should be cut to length as required to connect the battery to the voltage
sense terminals. A 2-position terminal (see figure 3.3) is used for the
battery sense connection. A twisted pair cable is recommended but not
required. Use UL rated 300 Volt conductors. The voltage sense wires may be
pulled through conduit with the power conductors.
Observing correct polarity, connect both battery voltage sense wires to the
ProStar MPPT at the 2-position Battery Sense terminal, and to battery (+) and
(-) terminals. No damage will occur if the polarity is reversed, but the
controller cannot read a reversed sense voltage.
Tighten the connector screws to 5 in-lb (0.56 Nm) of torque.
The maximum length allowed for each battery voltage sense wire is 98 ft (30
m).
Connecting the voltage sense wires to the RTS terminal will cause an alarm.
NOTE: If the battery input voltage is greater than 5 volts different than the
Battery Sense, due to voltage drops or faulty connections, the Battery Sense
input will not be recognized by the ProStar MPPT.
32
Installation Instructions
A battery voltage sense connection is not required to operate the ProStar MPPT
controller, but it is recommended for best performance.
STEP 3: Remote Temperature Sensor
WARNING: Risk of Fire. If no Remote Temperature Sensor (RTS) is connected, use
the ProStar MPPT within 3m (10 ft) of the batteries. Internal Temperature
Compensation will be used if the RTS is not connected. Use of the RTS is
strongly recommended.
AVERTISSEMENT: Risque d’incendie. Si non Capteur de température distant (RTS)
est connecté, utilisez le MPPT ProStar moins de 3m (10 pi) de les batteries.
Compensation de la température interne sera utilisée si la RTS n’est pas
connecté. Utilisation de la RTS est fortement recommandé.
All charging settings are based on 25°C (77°F). If the battery temperature
varies by 5°C, the charging setting will change by 0.15 Volts for a 12 Volt
battery. This is a substantial change in the charging of the battery, and the
use of the optional Remote Temperature Sensor (RTS) is recommended to adjust
charging to the actual battery temperature. The RTS can be added at any time
after the system has been installed.
Connect the RTS to the 2-position terminal located between the battery (-) and
chassis ground terminal lugs (see figure). The RTS is supplied with 33 ft (10
m) of 22 AWG (0.34 mm2) cable. There is no polarity, so either wire (+ or -)
can be connected to either screw terminal. The RTS cable may be pulled through
conduit along with the power wires. Tighten the connector screws to 5 in-lb
(0.56 Nm) of torque. Separate installation instructions are provided inside
the RTS bag.
WARNING: Equipment Damage Never place the temperature sensor inside a battery
cell. Both the RTS and the battery will be damaged.
ProStar MPPT Operator’s Manual
33
3.0
AVERTISSEMENT: Endommagement de l’équipement Ne placez jamais la sonde de
température dans un élément de batterie. Le RTS et la batterie seraient
endommagés.
CAUTION: The ProStar MPPT will use the local temperature sensor for
compensation if the RTS is not used.
PRUDENCE: Le ProStar MPPT ne compense pas la température des paramètres de
charges si le RTS n’est pas utilisé.
NOTE: The RTS cable may be shortened if the full length is not needed. Be sure
to reinstall the ferrite choke on the end of the RTS if a length of cable is
removed. This choke ensures compliance with electromagnetic emissions
standards.
REMARQUE: Le câble de RTS peut être raccourci si la totalité de la longueur
n’est pas nécessaire. Assurez-vous de réinstaller la bobine en ferrite sur
l’extrémité du RTS si une longueur de câble est enlevée. Cette bobine assure
la conformité avec les normes d’émissions électromagnétiques.
STEP 4: Grounding and Ground Fault Interruption
WARNING: This unit is not provided with a GFDI device. This charge controller
must be used with an external GFDI device as required by the Article 690 of
the National Electrical Code for the installation location.
NOTE: Depending on the country of installation, conductors identified by the
color green, or a combination of green/yellow, shall only be used for earthing
conductors.
AVERTISSEMENT : L’appareil n’est pas fourni avec un dispositif GFDI. Ce
contrôleur de charge doit être utilisé avec un appareil GFDI externe comme
requis par le code local ou les références
34
Installation Instructions
Use copper wire to connect the grounding terminal in the case, and other dead metal, to earth ground. The grounding terminal is identified by the ground symbol on the case, just above the terminal, as shown below:
Figure 3-4. Ground Symbol
Per NEC 690.45 (A) and NEC Table 250.122, minimum sizes for equipment copper
grounding wire are: · ProStar MPPT-25 10 AWG (5 mm2) · ProStar MPPT-40 10 AWG
(5 mm2)
Per IEC 62109, minimum sizes for equipment copper grounding wire are:
· ProStar MPPT-25 7 AWG (10 mm2) · ProStar MPPT-40 7 AWG (10 mm2) OR, of the
same, or greater, cross-sectional area as the PV wires.
WARNING: Risk of Fire DO NOT bond DC system electrical negative to earth
grounding terminal on the controller. Per NEC, system negative must be bonded
to earth ground at only one point, and through a GFPD if required.
AVERTISSEMENT : Risque d’incendie NE LIEZ PAS le côté négatif du système à la
mise à la terre au niveau du contrôleur. Selon les exigences par le code local
ou les références, le côté négatif du système doit être mis à la terre par un
GFPD à un seul point.
For safety, and effective lightning protection, it is recommended, and may be
required by code, that the negative conductor of the charging system be
properly grounded. Do not connect the grounding electrode
ProStar MPPT Operator’s Manual
35
3.0
conductor (GEC) to the case ground terminal. The ProStar MPPT does not have
internal ground fault protection; but where the NEC requires the use of a
ground fault protection device (GFPD), the system electrical negative should
be bonded through a GFPD to earth ground at only one point. The grounding
point may be located in the solar, or the battery circuit. For system
grounding electrode conductor sizing requirements, refer to the NEC Section
690.47, or applicable local regulations or code.
STEP 5: Battery Connections – see diagram below Be sure that DIP switches 2
and 3 are set for 12 or 24V, as described in Section 3.2
NOTE: Before connecting the battery, measure the open-circuit voltage. It must
be over 10 volts to start the controller. If the system voltage Settings
Switches are set to Auto-detect, battery voltage over 15.5V will be detected
as a 24V nominal battery, and the unit will charge accordingly. The 12/24V
auto selection is only done at start-up.
With an OPEN battery OCPD, connect the battery (-) wire from the battery to
the controller battery (-) terminal. Connect the battery (+) wire from the
battery to the OCPD, and then connect a wire from the battery OCPD to the
controller battery (+) terminal. If wiring a fuse and disconnect switch
install the fuse on the battery side of the disconnect switch. DO NOT CLOSE
THE BATTERY OCPD AT THIS TIME.
36
Installation Instructions
BATTERY (+)
BATTERY (-)
Battery breaker
6 in. (15) cm
MAX.
+-
12V / 24V BATTERY
System Ground (at battery OR solar side, but NOT both)
STEP 6: Solar Connections – see diagram below
WARNING: Shock Hazard Depending on the array configuration, the solar PV array
can produce open-circuit voltages of up to 120 Vdc when in sunlight. Verify
that the solar input breaker or disconnect is open (disconnected), and
combiner fuses (if installed) removed before installing the system wires. The
PV modules should be connected last to avoid voltage in the rest of the PV
circuit during wiring.
AVERTISSEMENT : Risque de Choc
Selon la configuration du générateur, le générateur solaire PV peut produire
des tensions en circuit ouvert allant jusqu’à 120 Vdc lorsqu’il est exposé au
soleil. Vérifiez que
ProStar MPPT Operator’s Manual
37
3.0
le disjoncteur ou le sectionneur d’entrée solaire est ouvert (déconnecté) et
que les fusibles du combinateur (le cas échéant) ont été retirés avant
d’installer les câbles du système. Les modules PV doivent être connectés en
dernier pour éviter toute tension dans le reste du circuit PV pendant le
câblage.
With an OPEN solar OCPD, connect the solar (PV) array wires to the PS-MPPT
solar terminals. Connect a PV (-) wire from the controller (-) terminal to the
PV array (-). Connect a PV (+) wire from the controller to the PV OCPD. Then
connect a PV (+) wire from the OCPD to the PV array (+). If required, install
the combiner and/or ground fault protection wiring (not shown) according to
the manufacturer’s instructions.
Use caution, since the solar array can produce voltage and current whenever in
sunlight. DO NOT CLOSE THE PV OCPD AT THIS TIME.
120Voc Maximum
40 Volt MODULE
40 Volt MODULE
40 Volt MODULE
(-) (+)
(-)
(+)
(-) (+)
SOLAR (+)
Solar Breaker
SOLAR (-)
STEP 7: Load Connections – see diagram below
CAUTION: Equipment Damage Do not wire any AC inverter to the load terminals of
the ProStar MPPT. Damage to the load control circuit may result. An inverter
should be wired to the battery. If there is a possibility that any other load
will sometimes exceed the Prostar MPPT’s maximum voltage or current limits,
the device should be wired directly to the battery or battery bank. If load
control is
38
Installation Instructions
required, contact Morningstar Tech Support for assistance.
PRUDENCE : Dommages matériels Ne pas raccorder n’importe quel convertisseur
aux bornes de la ProStar MPPT. Pourrait endommager le circuit de commande de
charge. S’il y a une possibilité que n’importe quelle autre charge dépassera
parfois la tension maximale de la Prostar MPPT ou limites de courant,
l’appareil doit être câblé directement sur la batterie ou la batterie. Si le
régulateur de charge est nécessaire, contacter le Support technique de
Morningstar d’assistance.
Turn the loads off, install an OPEN load OCPD, and connect load wires –
observing correct polarity – as shown below. DO NOT CLOSE THE LOAD OCPD AT
THIS TIME.
LOAD (+)
Load breaker
LOAD (-)
STEP 8: Power-Up and Verify System Operation NOTE: Carefully observe the LEDs
after each connection. The LEDs will indicate proper polarity and a good
connection.
Close the battery breaker to power on the controller. Watch the the charging
status, and then the three battery stateof-charge (SOC) LEDs blink in sequence
(G-Y-R), confirming proper start-up. If they do not light, check the battery
polarity (+/) and battery voltage.
ProStar MPPT Operator’s Manual
39
3.0
Next, the green, yellow or red LED will light depending on the battery state-
of-charge (SOC). Confirm that one of these LEDs is on before going to the next
step. Close the solar disconnect. If the solar input is connected while in
sunlight, the charging LED indicator will light. Confirm proper connection by
observing the charging LED. Close the load disconnect, and turn the load on,
to confirm a proper connection. If the load does not turn on, it could be for
various reasons: · the ProStar MPPT is in LVD (red LED on) · there is a short
circuit in the load (LEDs blinking R/G Y) · there is an overload condition
(LEDs blinking R/Y – G) · the load is not connected, not working, or turned
off
After all connections have been completed, observe the LEDs to make sure the
controller is operating normally for system conditions. If the optional
digital meter is used, observe that the display is scrolling with proper
voltage and current values. Also, a self- test can be performed with digital
meter units.
STEP 9: To Power-down
WARNING: Risk of Damage ONLY disconnect the battery from the ProStar MPPT
AFTER the solar input has been disconnected. Damage to the controller may
result if the battery is removed while the ProStar MPPT is charging.
AVERTISSEMENT: Risque d’endommagement Le ProStar MPPT 150V SEULEMENT
déconnecter la batterie APRÈS l’entrée solaire a été déconnectée. Le
contrôleur pourrait endommager si la batterie est retirée quand le ProStar
MPPT 150V est en charge. · To prevent damage, power-down must be done in the
reverse order as power-up.
40
Installation Instructions
4.0
OPERATION
4.1 TrakStarTM MPPT Technology
The ProStar MPPT utilizes Morningstar’s TrakStar Maximum Power Point Tracking
technology to extract maximum power from the solar module(s). The tracking
algorithm is fully automatic and does not require user adjustment. Trakstar
technology will track the array maximum power point voltage (Vmp) as it varies
with weather conditions, ensuring that maximum power is harvested from the
array through the course of the day. Current Boost: In many cases, TrakStar
MPPT technology will “boost” the solar charge current. For example, a system
may have 2 amps of solar current flowing into the ProStar MPPT and 5 amps of
charge current flowing out to the battery. The ProStar MPPT does not create
current! Rest assured that the power into the ProStar MPPT is the same as the
power out of the ProStar MPPT. Since power is the product of voltage and
current (Volts x Amps), the following is true*: (1) Power Into the ProStar
MPPT = Power Out of the ProStar MPPT (2) Volts In x Amps In = Volts Out x Amps
Out
- assuming 100% efficiency i.e. if no losses in wiring and conversion existed. If the solar module’s Vmp is greater than the battery voltage, it follows that the battery current must be proportionally greater than the solar input current so that input and output power are balanced. The greater the difference between the maximum power voltage and battery voltage, the greater the current boost. Current boost can be substantial in systems where the solar array is of a higher nominal voltage than the battery as described in the next section.
ProStar MPPT Operator’s Manual
41
4.0
CURRENT POWER VOLTAGE
High Voltage Strings and Grid-tie Modules Another benefit of TrakStar MPPT technology is the ability to charge 12 or 24 volt batteries with solar arrays of higher nominal voltages. A 12 volt battery bank can be charged with a 12, 24, 36 or 48V nominal off-grid solar array. Certain grid-tie solar modules may also be used as long as the sthoelaPr raorSratyaroMpePnPTci1rc2u0itVvmolataxigmeu(mVoci)nrpautitnvgowltailgl neortateinxcgeaetd worst-case (lowest) module temperature. The solar module HdoigchuemresnotlaatrioinnpsuhtovuolldtapgreovreidsueltVsocinvslo. wteemr psoelraartuinrepudtata. current for a given input power. High voltage solar input strings allow for smaller gauge solar wiring. This is especially helpful for systems with long wiring runs between the solar array and the ProStar MPPT.
An Advantage Over Traditional Controllers
Traditional controllers connect the solar module directly
to the battery when recharging. This requires that the so-
lar module operate in a voltage range that is below the
mvooltdauglee’smVamyp.ranIngea
12V from
system, 10 – 15
typically around 17V. Figure 4.1
for example, the battery
Vdc but shows a
ttyhpeicmaol cduurlree’sntVvmsp.is
voltage output curve for a nominal 12V off-grid module.
12 Volt Module Current vs. Voltage
Typical Battery Voltage Range
Maximum Power Point
12 Volt Module Output Power
TrackStar Maximum
Power Point
Traditional Controller Operating Range
10 15 17 VOLTAGE
10 15 17 VOLTAGE
Figure 4.1. Nominal 12 volt solar module I-V curve and output power graph
42
Operation
4.2 Battery Charging
4-Stage Charging The ProStar MPPT has a 4-stage battery charging algorithm for
rapid, efficient, and safe battery charging. Figure 4-2 shows the sequence of
stages.
EQUALIZE
NIGHT
BULK CHARGE
ABSORPTION
FLOAT
NIGHT
TIME
Figure 4.2. ProStar MPPT Charging Algorithm
Bulk Charge Stage
During Bulk charging, the battery is not at 100% state of charge and battery
voltage has not yet charged to the Absorption voltage set-point. The
controller will deliver 100% of available solar power to recharge the battery.
Absorption Stage
When the battery has recharged to the Absorption voltage set-point, constant-
voltage regulation is used to maintain battery voltage at the Absorption set-
point. This prevents heating and excessive battery gassing. The battery is
allowed to come to full state of charge at the Absorption voltage set-point.
The green SOC LED will blink once per second during Absorption charging.
ProStar MPPT Operator’s Manual
43
4.0
The battery must remain in the Absorption charging stage for a cumulative
150-180 minutes, depending on battery type, before transition to the Float
stage will occur. However, Absorption time will be extended by 30 minutes if
the battery discharges below 12.50 volts (12V system) the previous night.
The Absorption set-point is temperature compensated through either the on-
board local temperature sensor, or an optional Remote Temperature Sensor
(RTS), if connected.
Float Stage
After the battery is fully charged in the Absorption stage, the ProStar MPPT
reduces the battery voltage to the Float voltage set-point. When the battery
is fully recharged, there can be no more chemical reactions and all the
charging current is turned into heat and gassing. The float stage provides a
very low rate of maintenance charging while reducing the heating and gassing
of a fully charged battery. The purpose of float is to protect the battery
from long-term overcharge. The green SOC LED will blink once every two (2)
seconds during Float charging.
Once in Float stage, loads can continue to draw power from the battery. In the
event that the system load(s) exceed the solar charge current, the controller
will no longer be able to maintain the battery at the Float set-point. Should
the battery voltage remain below the Float set-point for a cumulative 60
minute period, the controller will exit Float stage and return to Bulk
charging.
The Float set-point is temperature compensated through either the on-board
local temperature sensor, or an optional Remote Temperature Sensor (RTS), if
connected.
44
Operation
Equalization Stage
WARNING: Risk of Explosion Equalizing vented batteries produces explosive gases. The battery bank must be properly ventilated.
!
CAUTION: Equipment Damage Equalization increases the battery voltage to levels that
may damage sensitive DC loads. Verify all system loads
are rated for the temperature compensated Equalize
voltage before beginning an Equalization charge.
!
CAUTION: Equipment Damage Excessive overcharging and gassing too vigorously can
damage the battery plates and cause shedding of active
material from the plates. An equalization that is too high
or for too long can be damaging. Review the require-
ments for the particular battery being used in your system.
AVERTISSEMENT: Risque d’explosion Les batteries à évent et compensation produisent des gaz explosifs. Le groupe de batteries doit être correctement ventilé.
!
PRUDENCE: Endommagement de l’équipement La compensation augmente la tension des batteries à des
niveaux pouvant endommager les charges sensibles en
CC. Vérifiez que toutes les charges du système sont
conçues pour la tension de compensation par température
avant de commencer une charge de compensation.
!
PRUDENCE: Endommagement de l’équipement Une surcharge excessive et un dégagement gazeux trop
vigoureux peuvent endommager les plaques de batteries
et provoquer l’élimination du matériau actif des plaques.
Une compensation trop élevée ou trop longue peut
provoquer des dégâts. Examinez les exigences pour la
batterie particulière utilisée dans votre système.
Certain battery types benefit from a periodic boost charge to stir the electrolyte, level the cell voltages, and complete the chemical reactions. Equalization (EQ) charging raises
ProStar MPPT Operator’s Manual
45
4.0
the battery voltage above the standard absorption voltage so that the electrolyte gases. The green SOC LED will blink rapidly two (2) times per second during equalization charging. The duration of the equalize charge is determined by the selected battery type. See table 4-1 in this section for more details. The Equalization Time is defined as time spent at the equalization set-point. If there is insufficient charge current to reach the equalization voltage, the EQ will terminate after an additional 60 minutes to avoid over gassing or heating of the battery. If the battery requires more time in equalization, with non-metered versions, manual EQ can be activated using the push-button (see Section 4.5) to continue for one or more additional EQ cycles. The Prostar MPPT meter, or MSView software, can also be used to program EQ timing and duration.
The Equalization set-point is temperature compensated through either the on- board local temperature sensor, or an optional Remote Temperature Sensor (RTS), if connected.
Why Equalize?
Routine equalization cycles are often vital to the performance and life of a
battery – particularly in a solar system. During battery discharge, sulfuric
acid is consumed and soft lead sulfate crystals form on the plates. If the
battery remains in a partially discharged condition, the soft crystals will
turn into hard crystals over time. This process, called “lead sulfation”,
causes the crystals to become harder over time and more difficult to convert
back to soft active materials. Sulfation from chronic undercharging of the
battery is the leading cause of battery failures in solar systems. In addition
to reducing the battery capacity, sulfate build-up is the most common cause of
buckling plates and cracked grids. Deep cycle batteries are particularly
susceptible to lead sulfation.
Normal charging of the battery can convert the sulfate back to the soft active
material if the battery is fully recharged. However, a solar battery is seldom
completely recharged, so the soft lead sulfate crystals harden over a period
of time.
46
Operation
Only a long controlled overcharge, or equalization, at a higher voltage can
reverse the hardening of sulfate crystals.
When to Equalize?
The ideal frequency of equalizations depends on the battery type (lead-
calcium, lead-antimony, etc.), the depth of discharging, battery age,
temperature, and other factors. One very broad guide is to equalize flooded
batteries every 1 to 3 months or every 5 to 10 deep discharges. Some
batteries, such as the L-16 group, will need more frequent equalizations.
The difference between the highest cell and lowest cell in a battery can also
indicate the need for an equalization. Either the specific gravity or the cell
voltage can be measured. The battery manufacturer can recommend the specific
gravity or voltage values for your particular battery.
Preparation for Equalization
First, confirm that all of the system loads are rated for the equalization
voltage. Consider that at 0°C (32°F) the equalization voltage will reach 16.75
volts for L-16 batteries with a temperature sensor installed. Disconnect any
loads at risk of damage due to the high input voltage.
If Hydrocaps are used, be sure to remove them before starting an equalization.
Replace the Hydrocaps with standard battery cell caps. The Hydrocaps can get
very hot during an equalization. Also, if Hydrocaps are used, the equalization
should be set for manual only (DIP switch #7 is Off). After the equalization
is finished, add distilled water to each cell to replace gassing losses. Check
that the battery plates are covered.
Equalize a Sealed Battery?
The Battery Charging Settings table (see table 4-1 in this section) shows two
sealed battery settings with an Equalization cycles. These are minimal “boost”
cycles to level individual cells. This is not an equalization, and will not
vent gas from sealed batteries that require up to 14.4V
ProStar MPPT Operator’s Manual
47
4.0
charging (12V battery). Many VRLA batteries, including AGM and gel, have
charging requirements up to 14.4V (12V battery). Depending on the battery
manufacturer’s recommendation, the “boost” cycle for sealed cells can be
disabled by setting the equalize setting switch to manual, if required.
Battery Charge Settings
Preset ProStar MPPT battery charging options are shown in tables 4-1 and 4-2
below. All voltage settings listed are for nominal 12 Volt batteries. Multiply
the voltage settings by two (2) for 24 Volt batteries.
NOTE: These settings are general guidelines for use at the operator’s
discretion. The ProStar MPPT can be programmed to satisfy a wide range of
charging parameters. Consult the battery manufacturer for optimal battery
charge settings.
Battery Charging Set-points (@ 25°C): [multiply voltages by (2) for 24 volt systems]
DIP Switch Settings 4-5-6
Battery Type
Absorp. Stage (volts)
Float Stage (volts)
Equalize Stage (volts)
Absorp. Time (mins)
Equalize Time (mins)
Equalize Timeout
(mins)
Equalize Interval (days)
off-off-off 1 – Sealed*
14.00
13.50
150
off-off-on 2 – Sealed*
14.15
13.50
14.40
150
60
120
28
off-on-off 3 – Sealed*
14.30
13.50
14.60
150
60
120
28
off-on-on 4- AGM/Flooded 14.40
13.50
15.10
180
120
180
28
on-off-off 5 – Flooded
14.60
13.50
15.30
180
120
180
28
on-off-on 6 – Flooded
14.70
13.50
15.40
180
180
240
28
on-on-off 7 – L-16
15.40
13.40
16.00
180
180
240
14
on-on-on 8 – Custom
Custom Custom Custom Custom Custom Custom Custom
- “Sealed” baery type includes gel and AGM baeries
Table 4.1. Battery charging settings for each selectable battery type
48
Operation
Shared Settings
Absorption Extension Voltage Absorption Extension Time Float Exit Time-out
Float Cancel Voltage Equalize Time-out
Temperature Compensation Co-efficient
Value
12.50 Absorption Time + 30
60 12.10 Equalize Time + 60
– 30
Units
Volts minutes minutes
Volts minutes millivolts / °C
/ 12V
Table 4.2. Battery settings that are shared among all battery types
The ProStar MPPT provides seven (7) standard battery charging settings that
are selected with the settings switches (see Table 4.1 above). These standard
charging settings are suitable for lead-acid batteries ranging from sealed
(gel, AGM, maintenance-free) to Flooded and L-16 cells. In addition, an eighth
charging setting provides for custom set-points using MSViewTM PC software.
Table 4-1 above summarizes the major parameters of the standard charging
settings. The shared settings in Table 4-2 are common to all battery types.
The following charging profiles graphically illustrate the shared settings:
Absorption Extension
Bulk
Extended Absorption
Absorption
Float
12.50 V
Absorption Extension Voltage
1:00 2:00 3:00 4:00 5:00 6:00 Figure 4-3. Absorption Extension Charging
Profile
ProStar MPPT Operator’s Manual
time (hrs)
49
4.0
If battery voltage discharges below 12.50 volts (25.00 volts @ 24V) the previous night, Absorption charging will be extended on the next charge cycle as shown in figure 4-3 above. Thirty minutes will be added to the normal Absorption duration.
Float Time-out
Bulk Absorption Float
SubFloat Bulk Absorption
Float V
60 mins. below Float
1:00 2:00 3:00 4:00 5:00 6:00
Figure 4-4. Float Exit Time-out Charging Profile
time (hrs)
After entering Float stage, the controller will only exit Float if the battery voltage remains below Float voltage for sixty cumulative minutes. In figure 4-4, a system load turns on at 3:30 hrs when the controller is in Float stage, runs for one hour, and turns off at 4:30 hrs. The load current draw is larger than the charge current, causing battery voltage to drop below Float voltage for sixty minutes. After the load runs for sixty minutes, the time-out causes the controller to return to Bulk charging, and then Absorption stage again. In this example, a load runs continuously for sixty min. However, because the Float exit timer is cumulative, multiple momentary load events that pull the battery voltage below Float voltage for a combined sixty minutes duration will also force an exit from Float stage.
50
Operation
Float Cancel Voltage
Bulk
Absorption
Float cancelled this charge cycle
12.0 V
Float Cancel Voltage
1:00 2:00 3:00 4:00 5:00 6:00 Figure 4.5. Float Cancellation Charging Profile
time (hrs)
If the battery bank discharges below 12.10 volts (24.20 volts @ 24 V) the previous night, Float charging stage will be cancelled for the next charge cycle. Figure 4-5 above, illustrates this concept. At 0:00 hrs (dawn), battery voltage is below the Float Cancel threshold voltage. The diagram shows where Float stage would have occurred if Float was not canceled.
ProStar MPPT Operator’s Manual
51
4.0
Equalize Time-out
Bulk Equalize V
Equalize
Absorp. V
Equalize timeout
Float
1:00 2:00 3:00 4:00 5:00 6:00
time (hrs)
Figure 4.6. Equalize Time-out Charging Profile
The charging profile in figure 4-6 above, shows an Equalize Time-out event. The time-out timer begins as soon as battery voltage exceeds the Absorption voltage set-point. If there is insufficient charging current or system loads are too large, the battery voltage may not reach the Equalize set-point. Equalize Time-out is a safety feature that prevents high battery voltage for extended periods of time which may damage the battery.
52
Operation
4.3 Load Control Information
The primary purpose of the load control function is to disconnect system loads
when the battery has discharged to a low state of charge, and reconnect system
loads when the battery is sufficiently recharged. System loads may be lights,
DC appliances, or other electronic devices. The total current draw of all
loads must not exceed the ProStar MPPT 25 or 30 Amp maximum load rating.
CAUTION: Equipment Damage Do not wire any AC inverter to the load terminals of
the ProStar MPPT. Damage to the load control circuit may result. An inverter
should be wired to the battery. If there is a possibility that any other load
will sometimes exceed the Prostar MPPT’s maximum voltage or current limits,
the device should be wired directly to the battery or battery bank. If load
control is required, contact Morningstar Tech Support for assistance.
PRUDENCE : Dommages matériels Ne pas raccorder n’importe quel convertisseur
aux bornes de la ProStar MPPT. Pourrait endommager le circuit de commande de
charge. S’il y a une possibilité que n’importe quelle autre charge dépassera
parfois la tension maximale de la Prostar MPPT ou limites de courant,
l’appareil doit être câblé directement sur la batterie ou la batterie. Si le
régulateur de charge est nécessaire, contacter le Support technique de
Morningstar d’assistance.
Current Compensation: All LVD and LVR set-points are current compensated.
Under load, the battery voltage will sag in proportion to the current draw of
the load. A short-term large load could cause a premature LVD without the
current compensation feature. LVD and LVR set-points are adjusted lower per
the following table.
System Voltage
12 Volt 24 Volt
Current Compensation
-20 mV per amp of load -40 mV per amp of load
Table 4-3. Current Compensation Values
ProStar MPPT Operator’s Manual
53
4.0
LVD Warning: As the battery discharges, the Battery Status LEDs will
transition from green to yellow and then from yellow to flashing red. The
flashing red indication is a warning that a low voltage disconnect (LVD) event
will occur soon.
The amount of time between a green SOC indication and load disconnect will
depend on many factors including: · rate of discharge (amount of load draw) ·
capacity of the battery · health of the battery · LVD set-point
If the battery discharges to the LVD set-point the load will disconnect and a
solid red Battery Status LED indication will be displayed.
General Load Control Notes: Do not wire multiple ProStar MPPT load outputs
together in parallel to power DC loads with a current draw greater than 25 or
30A, depending on the ProStar MPPT model in use. Equal current sharing cannot
be assured and an over-load condition will likely occur on one or more
controllers.
Exercise caution when connecting loads with specific polarity to a live load
circuit. A reverse polarity connection may damage the load. Always double
check load connections before applying power.
54
Operation
4.4 LED Indications
KEY: G = green Y = yellow R = red
G – Y – R = flashing sequencially G / Y = flashing together G / Y – R = G and Y flashing together, alternating with R flash
4.4.1. Power-up Normal power-up: Status LED flashes G, then SOC LEDS flash G – Y – R, sequentially, then SOC LEDs will indicate battery charge status with one or two lit battery status LEDs. Failed bootload: Status LED flashes G, then SOC LEDS flash G – Y and stop on solid Y.
4.4.2 Status LED
The Status LED indicates charging status and any existing solar input error conditions. The Status LED is on when charging during the day and off at night. The Status LED will flash red whenever an error condition(s) exists. Table 4.4 lists the Status LED indications.
Color None Green Red Red
Indication
Off (with heartbeat¹)
On Solid (with heart-
beat²) Flashing On Solid (with heart-
beat2)
Operating State Night
Charging Error
Critical Error
¹ heartbeat indication flickers the Status LED on briefly every 5 seconds ² heartbeat indication flickers the Status LED off briefly every 5 seconds
Table 4.4. Status LED Definitions
ProStar MPPT Operator’s Manual
55
4.0
NOTES: 1) R flashing is generally a user addressable fault / error 2) R
charging status LED ON with heartbeat blink OFF every 5 secs is a critical
fault that generally requires service. See, “Solid Charging Status LED with
Self-test (R-Y-G) SOC Faults”, in Section 5.1.
4.4.3 State-of-Charge LEDs Battery SOC LED Indications are shown in Table 4-5
below:
Condition Absorption Float Start EQ (push-button) Stop EQ (push-button)
Equalize SOC > 13.5V 13.5V > SOC > 13.0V 13.0V > SOC > 12.5V
SOC < 12.5V Low voltage disconnect warning Low voltage disconnect
Indication G flash – every sec G flash – every 2 secs [G / Y / R] x2 – G- G [G
/ Y / R] x2 – R – R G flash – 2 / sec G solid G / Y solid Y solid Y / R solid
R flash – every sec
R solid
Table 4.5. Battery SOC LED Indications
4.5 Push-Button Use in Non-Metered Version
The version of the ProStar MPPT without meter display features a push-button that operates as follows depending on the DIP Switch 1 setting: Normal Mode (DIP 1 OFF)
· Regardless of the DIP 7 setting, press and hold the pushbutton for 5 seconds to initiate or stop an Equalization (EQ).
56
Operation
Lighting Control Mode (DIP 1 ON) A quick press of the push-button will conduct
a ten minute lighting test. A lighting test is used to verify correct wiring
in the load circuit and /or verify that the lighting components are
operational. The lighting test will override LVD for ten minutes – the
override duration is not programmable. · Press and hold the push-button for
five seconds to initiate
or stop an Equalization (EQ).
Reset PS-MPPT to Factory Settings
To restore factory settings: Disconnect PV; disconnect battery power; press
and hold down the push-button; re-start the PS-MPPT by connecting the battery;
keep the push-button depressed for 3-5 secs, until the battery LEDs start to
cycle R-Y-G. A Custom Edit Settings fault will occur. See Section 5 for
details. The unit will need to be re-powered to resume normal operation.
4.6 Alarms
Solar Overload No LED indication. The ProStar MPPT will limit battery current to the 25 or 40 amp maximum rating. An over-sized solar array will not operate at peak power. The solar array should be less than the ProStar MPPT nominal max. input power rating for optimal performance. See Section 7.0 Technical Specifications for more information.
High Temperature Current Limit
The ProStar MPPT will limit the solar input current if the heatsink
temperature exceeds safe limits. Solar charge current will be tapered back (to
0 amps if needed) to reduce the heatsink temperature. The Appendix B de-rating
graphs indicate maximum ambient temperatures at which the ProStar MPPT will
operate with full-rated current; as indicated in each graph, maximum ambient
temperature depends on array input voltage. Actual de-rating
ProStar MPPT Operator’s Manual
57
4.0
temperatures lower than specified in the graphs indicate insufficient airflow.
Maximum charging current depends on many factors, and good ventilation can
greatly reduce the amount of de-rating. If the controller frequently reports
this alarm condition, corrective action should be taken to provide better air
flow, or to move the controller to a cooler location.
High Input Voltage Current Limit The ProStar MPPT will limit the solar input
current as the solar array Voc approaches the maximum input voltage rating.
The array Voc should never exceed the 120 volt maximum input voltage – see the
array voltage de-rating graph in Appendix.
Current Limit The array power exceeds the rating of the controller. This alarm
indicates that the ProStar MPPT is limiting battery current to the maximum
current rating.
RTS Open The Remote Temperature Sensor is not connected to the controller. Use
of the RTS is recommended for proper battery charging.
Heatsink Temperature Sensor Open / Shorted The heatsink temperature sensor is
damaged. Return the controller to an authorized Morningstar dealer for
service.
Battery Sense Out of Range / Disconnected (only alarm with LED indications)
Error status LED: Flashing red. Battery status LEDs: R/Y – G/Y sequencing. A
battery sense wire is disconnected. Inspect the battery sense connections.
This alarm is set when the voltage at the battery sense terminals differs by
more than five volts from the voltage at the battery terminals.
Uncalibrated
The controller was not factory calibrated. Return the controller to an
authorized Morningstar dealer for service.
58
Operation
4.7 Custom Settings
4.7.1 Programming with the Meter Display
The ProStar MPPT is available in metered and non-metered versions. The metered
model allows: · Custom programming, including lighting programs and
low battery temperature foldback, directly from the unit. · Extensive settings
adjustment and information as shown
partially in Figure 4-7 below:
Models: PS-MPPT-25M PS- MPPT- 40M
Display Screens and Programming
Main Screens
Solar Current – Battery Current – Load Current
Daily Charging Stage – Time
Daily Charge Transferred Battery and Load
Daily Max / Min Battery Voltages
COMMANDS
STATUS
HISTORY See Complete History Screens Online, or in
Manual Insert
SYSTEM
CUSTOM PROGRAMMING:
See Complete Programming Screens Online or in Manual Insert
To Programming Screens
Serial No. Firmware Version Battery Type Absorption Voltage Float Voltage EQ Voltage Input Mode System Voltage
Error Log Graphs Records
Clear Resettable Ah
Faults
Alarms Charge State Load / Light State Target Voltage Battery Temp. Battery
Sense Input Voltage Last Equalization Hour Meter
Clear Total Ah Clear KWh Load Disconnect Start Lighting Test Factory Reset Reset Control
DISPLAY SETTINGS
See Complete Programming Screens Online or in Manual Insert
Backlight Backlight Timer
Contrast Brightness Auto Scroll Auto Scroll Timer Auto Return Temp. Units
Language
Figure 4-7. Simplified Meter Map. For metered models, see the included
complete meter map insert, also available in the ProStar MPPT support
documents at:
www.morningstarcorp.com
ProStar MPPT Operator’s Manual
59
4.0
4.7.2 Programming in MSView Beyond the preset DIP switch options, the Prostar
MPPT’s charging profile and all other settings are customizable using MSView
PC software available at:
www.morningstarcorp.com
WARNING: Risk Of Electrical Shock. Hazardous voltage is present at the
Meterbus communications port. Use 150V rated, 4 or 6 conductor UL listed
telephone cable.
AVERTISSEMENT: Risque de choc électrique. Tension dangereuse est présente dans
le port de communication de transfert. Utilisez 150V évalué, 4 ou 6
conducteurs câble de téléphone répertorié UL.
With a connection to a PC, and to the RJ-11 port of the PSMPPT, the MSView
ProStar MPPT Set-up Wizard is capable of editing all charging and lighting
parameters, for upload to the controller. The Set-up Wizard, and topics within
the Help tab describe programming procedures in detail.
All aspects of connection, programming and communications are covered in the
Product Connectivity Manual:
www.morningstarcorp.com
Communications accessories / adapters are housed in the optional Wire Box for
ProStar MPPT.
4.7.3 Meter Display Operation
4.7.3.1 Directional Key Use and Operation / Navigating the Meter Map
The ProStar MPPT’s meter map consists of two main axes: The horizontal top
level daily monitoring screens, and the vertical Main Menu stacked screens.
The four lighted triangular directional control keys allow movement to reach
any desired point on the meter map. A lit key indicates
60
Operation
a valid direction in the map. The current location is indicated on the display
with a column heading, and a bold descriptor.
4.7.3.2 Adjusting the Meter Display The display setting options, as shown in
Figure 4-7, are adjustable by using the directional keys to locate and edit a
desired setting or variable.
4.7.4 Using the Meter Display to Program Charging Set-points, Load Control,
Communications, and Advanced Settings Refer to the complete meter map insert
for metered PSMPPTs. From a top level monitoring screens, scroll down to the
Main Menu – “Custom Programming” – screen. Select the desired category, and
edit the variable or settings as instructed in the meter display. Note that
charging set-points should be entered as if for a 12V system – DIP switches 2
and 3 settings prompt the controller to multiply if necessary. TIP: Using the
meter, Float and EQ stages can be disabled by setting these voltages to 0V.
The Load Control category includes Normal (load disconnect) and Lighting
programming. The Advanced Settings category includes more optional charging,
MPPT, and load control settings. NOTE: Without DIPs 4,5,6 ON (up), only COM
address settings options will appear in the meter map. To view and program
custom settings via the meter display, DIPs 4,5,6 must be in the ON (up)
position.
4.7.5 Lighting Control / Programming Overview The ProStar MPPT display has
extensive lighting load programmability. With DIP switch 1 ON (up), a dusk-
dawn lighting program is enabled, if lighting timing hasn’t been programmed in
MSView or using the meter; with DIP 1, 4, 5, 6 ON, and the unit programmed,
custom timing will be in effect.
ProStar MPPT Operator’s Manual
61
4.0
With DIP 1 OFF (down), all lighting control functions are disabled. Using
either MSView or the meter display, four channels are available for setting
timers that can work separately, or in combination. See Section 4.7.6 –
Lighting Programming Using Meter Display – for more details.
4.7.6 Lighting Programming Using the Meter Display Lighting programming
capabilities are accessible with the meter via Custom Programming->Load
Control->Lighting. Lighting settings editing is done via on-screen
instructions. · The Summary provides a graphical representation of the
complete lighting configuration · LVD / LVR can be specified for use when a
lighting
program is in operation · Sunrise and Sunset Threshold settings allow the
adjustment of percentages of the maximum seen solar array voltage for
triggering day and night events · There are four channels, each having two
timers, which can be used independently, or in combination. · Events and
actions are used as references and controls. An event is one of eight points
in a day e.g. sunrise or midnight. Each event can be edited to specify a time
offset to trigger an action, which can be, “Do Nothing”, “Lights On”, or
“Lights Off” · The combination setting of each channel will specify whether
the actions and events of each timer will function: not at all (no
combination); when both timers’ settings match (AND); for either timers’
settings (OR)
4.7.7 Low Temperature Foldback
The ProStar MPPT has a Low Temperature Foldback option which can be used to
protect lithium batteries from being charged in cold conditions. Custom
settings defining the bounds of charge current reduction due to low battery
temperature can be programming in MSView, or with the Advanced Custom Settings
options with the display interface.
62
Operation
Advanced Custom Settings options are available with ProStar MPPT built-in
meter models (PS-MPPT-25M and PS-MPPT-40M).
The High Limit defines the lowest temperature at which the controller will
deliver 100% of the controller’s rated output charging current. The Low Limit
defines the temperature at which the controller will stop providing battery
charging current. The charge current is tapered linearly from the High Limit
to the Low Limit.
NOTE: Local meter display setup required for Low Limit < 1° Celsius.
4.8 Inspection and Maintenance
Table 4-6 below lists the recommended maintenance schedule to keep your
ProStar MPPT performing optimally.
WARNING: Risk Of Electrical Shock. No power or accessory terminals are
electrically isolated from dc input, and may be energized with hazardous solar
voltage. Under certain fault conditions, battery could become over-charged.
Test between all terminals and ground before touching.
AVERTISSEMENT: Risque De Choc Életrique. Non alimentation ou aux bornes
d’accessoires sont isolés électriquement de l’entrée de c.C et doit être
alimentés à une tension dangereuse solaire. Sous certaines conditions de
défaillance, la batterie pourrait devenir trop chargée. Test entre toutes les
bornes et la masse avant de toucher.
WARNING: Shock Hazard Disconnect all power sources to the controller before
removing the wiring box cover. Never remove the cover when voltage exists on
the ProStar MPPT power connections.
AVERTISSEMENT: Risque de décharge électrique Déconnecter toutes les sources
d’alimentation pour le contrôleur avant d’enlever le couvercle de boîte de
connexion. N’enlevez jamais le couvercle lorsque tension existe sur les
connexions d’alimentation ProStar MPPT.
ProStar MPPT Operator’s Manual
63
4.0
Schedule
2 weeks after installation
Maintenance Items
Re-tighten power terminal connections to specified
torque values.
3 months after installation Monthly or After Each Equalization
Re-tighten power terminal connections to specified
torque values.
Inspect the battery bank. Look for cracked or
bulging cases, and corroded terminals.
For wet cell (flooded type) batteries, make sure the water level is correct.
Wet cell water levels should be
checked monthly or according to the manufacturer’s recommendations.
Annually
Clean the heatsink fins with a clean, dry rag.
Inspect all wiring for damage or fraying. Inspect for nesting insects. Re-
tighten all wiring terminal connections to specified
torque values. Inspect the system earth grounding for all components. Verify
all grounding conductors are appropriately secured to earth ground.
Table 4-6. Maintenance Schedule
64
Operation
5.0
TROUBLESHOOTING
WARNING: RISK OF ELECTRICAL SHOCK. NO POWER OR ACCESSORY TERMINALS ARE
ELECTRICALLY ISOLATED FROM DC INPUT, AND MAY BE ENERGIZED WITH HAZARDOUS SOLAR
VOLTAGE. UNDER CERTAIN FAULT CONDITIONS, BATTERY COULD BECOME OVERCHARGED.
TEST BETWEEN ALL TERMINALS AND GROUND BEFORE TOUCHING.
AVERTISSEMENT: RISQUE DE CHOC ÉLECTRIQUE. NON ALIMENTATION OU AUX BORNES
D’ACCESSOIRES SONT ISOLÉS ÉLECTRIQUEMENT DE L’ENTRÉE DE C.C ET DOIT ÊTRE
ALIMENTÉS À UNE TENSION DANGEREUSE SOLAIRE. SOUS CERTAINES CONDITIONS DE
DÉFAILLANCE, LA BATTERIE POURRAIT DEVENIR TROP CHARGÉE. TEST ENTRE TOUTES LES
BORNES ET LA MASSE AVANT DE TOUCHER.
WARNING: Shock Hazard A means of disconnecting all power supply poles must be
provided. These disconnects must be incorporated in the fixed wiring. Open all
power source disconnects before removing controller wiring cover, or accessing
wiring.
AVERTISSEMENT: Risque de décharge électrique Un moyen de déconnexion de tous
les poteaux d’alimentation doit être fourni. Ceux-ci se déconnecte doit être
intégrée dans le câblage fixe. Ouvrir que toutes les source d’énergie se
déconnecte avant de retirer le couvercle de la contrôleur, ou accès au
câblage.
5.1 LED Fault Indications
Load Over-current Error Status LED: Flashing red. Battery status LEDs: R/YG
sequencing. If the load current exceeds the maximum load current rating, the
ProStar MPPT will disconnect the load. The greater the overload the faster the
load will be
ProStar MPPT Operator’s Manual
65
5.0
disconnected. A small overload could take a few minutes to disconnect. The
ProStar MPPT will attempt to reconnect the load two (2) times. Each attempt is
approximately 10 seconds apart. If the overload remains after two (2)
attempts, the load will remain disconnected until power is removed and re-
applied.
Solar Short Circuit Charging Status LED: OFF. Solar input power wires are
short-circuited. Charging automatically resumes when the short is cleared.
Battery Reverse Polarity No LED indication, the unit is not powered. No damage
to the controller will result. Correct the mis-wire to resume normal
operation.
Load Short Circuit Error status LED: Flashing red. Battery status LEDs: R/G-Y
sequencing. Fully protected against load wiring shortcircuits. After two (2)
automatic load reconnect attempts (10 seconds between each attempt) the
ProStar MPPT will wait, and then automatically reconnect the load, once the
short is cleared. High Solar Voltage Disconnect Charging Status LED: R
flashing. No battery status errors. If the solar input open-circuit voltage
(Voc) exceeds the 120 Volt maximum rating, the array will remain disconnected
until the Voc falls safely below the maximum rating.
Remote Temperature Sensor (RTS) Error status LED: Flashing red. Battery status
LEDs: R/Y G/Y sequencing. A bad RTS connection or a severed RTS wire has
disconnected the temperature sensor during charging. Charging automatically
resumes when the problem is fixed. To resume operation without an RTS,
disconnect all power to the ProStar MPPT and then reconnect. If the controller
is re-started with the failure still present, the controller may not detect
that the RTS is connected, and the LEDs will not indicate a fault.
66
Troubleshooting
A metered model, an RM-1 meter, or MSView PC software, can be used to
determine if the RTS is working properly. Solar-Battery High Voltage
Disconnect (HVD) Error status LED: Flashing red. Battery status LEDs: R-G
sequencing. This fault is set when battery voltage is above normal operating
limits. The controller will disconnect the solar input and set a Solar High
Voltage Disconnect fault. This fault is commonly caused by other charging
sources in the system, charging the battery above the ProStar MPPT regulation
voltage. Recovery occurs at HVD re-connect threshold, and the fault will clear
automatically.
Load High Voltage disconnect (HVD) – disabled by default Error status LED:
None. Battery status LEDs: R-G sequencing. This fault is set when battery
voltage is above normal operating limits. The controller will disconnect the
load output and set a Load High Voltage Disconnect fault. This fault is
designed to protect sensitive loads from excessive voltage. Recovery occurs at
HVD reconnect threshold, if programmed, and the fault will clear
automatically. High Heatsink Temperature Error status LED: Flashing red.
Battery status LEDs: R-Y sequencing. The heatsink temperature has exceeded
safe limits and the load is disconnected. The load will automatically
reconnect when the heatsink cools to a safe temperature.
Battery Over-current Error status LED: Flashing red. Battery status LEDs:
R/Y-G sequencing. While rare, if battery current exceeds approximately 130% of
the controller’s output current rating, this fault can occur. The fault is
generally related to fast, large battery voltage transients (connecting a very
heavy or capacitive load like an inverter) that are faster
ProStar MPPT Operator’s Manual
67
5.0
than the controller can regulate, and it shuts off to protect the circuitry.
The controller will automatically re-start in 10 seconds.
Settings (DIP) Switch Changed
Error status LED: Flashing red. Battery status LEDs: R-Y-G sequencing. If a
settings switch is changed while there is power to the controller, the LEDs
will begin sequencing and the solar input will disconnect. The controller must
be re-started to clear the fault and begin operation with the new settings.
Custom Settings Edit
Error status LED: Flashing red. Battery status LEDs: R-Y-G sequencing. A value
has been modified in custom settings memory. The controller will stop charging
and indicate a fault condition. After all settings have been modified, the
controller must be reset by removing and then restoring power to the
controller. The new programmed settings will be used after the power reset.
Firmware Update Failure
The firmware update was not successfully programmed. The controller will not
indicate the full power-up LED sequence of G-Y-R when power to the controller
is reset. Instead, the controller will display green, and then stop on yellow.
The yellow LED will continue to be lit and the controller will not complete
start up or begin charging.
Re-try the firmware update. The firmware must be successfully loaded before
the controller will start up.
SOLID CHARGING STATUS LED with SELF-TEST (R-Y-G) SOC FAULTS
Verify that nothing has been mis-wired. If not, the error is likely critical.
Contact an authorized Morningstar dealer for support.
Fault PV FET Short
Charging Status LED Battery SOC LEDs
Solid red
R-Y-G sequencing
Load FET Short
Solid red
R-Y-G sequencing
Load FET Open
Solid red
Damaged local temperature sensor Damaged heatsink temperature sensor
Solid red (only if RTS is invalid) Solid red
Software
Solid red
R-Y-G sequencing R-Y-G sequencing R-Y-G sequencing R-Y-G sequencing
RE-SETTABLE SELF-TEST (R-Y-G) SOC FAULTS
Fault
–
Battery SOC LEDs
Custom Settings Edit
–
R-Y-G sequencing
DIP Switch Change
–
R-Y-G sequencing
5.0
68
Troubleshooting
ProStar MPPT Operator’s Manual
69
5.2 Battery Charging and Performance Issues
Problem: No LED indications, controller does not appear to be powered
Solution: With a multi-meter, check the voltage at the battery terminals on
the ProStar MPPT. Battery voltage must be 10 vdc or greater. If the voltage on
the battery terminals of the controller is between 10 and 35 vdc, and no LEDs
are lit, contact your authorized Morningstar dealer for service. If no voltage
is measured, check wiring connections, fuses, and breakers.
Problem: The ProStar MPPT is not charging the battery.
Solution: Check the three (3) battery SOC LEDs. If they are flashing in a
sequence, see Section 4.5 LED indications of this manual to determine the
cause. A metered model, an RM-1 meter, or MSView PC software will display
active faults and alarms.
If the LED indications are normal, check the fuses, breakers, and wiring
connections in the power source wiring. With a multi-meter, check the array
voltage directly at the ProStar MPPT solar input terminals. Input voltage must
be greater than battery voltage before charging will begin.
Problem: Controller makes buzzing and humming noises.
Solution: No action is required. This is expected due to magnetic resonance
and circuit switching.
If troubleshooting does not correct the problem, please refer to Morningstar’s
Warranty Claim Procedure in Section 6.
70
Troubleshooting
6.0
WARRANTY & POLICIES
WARRANTY
LIMITED WARRANTY – Morningstar Solar Controllers and Inverters
Integrated Series products, SureSine Family (Gen 2) inverters and other Morningstar Professional SeriesTM products, except the SureSineTM-300 Classic (Gen 1) inverter, are warrantied to be free from defects in materials and workmanship for a period of FIVE (5) years from the date of shipment to the original end user.Warranty on replaced units, or field-replaced components, will be limited only to the duration of the original product coverage. Morningstar Essentials SeriesTM products, and SureSineTM-300 Classic (Gen 1) inverter, are warrantied to be free from defects in materials and workmanship for a period of TWO (2) years from the date of shipment to the original end user. Warranty on replaced units, or field-replaced components, will be limited only to the duration of the original product coverage. Morningstar will, at its option, repair or replace any such defective units.
CLAIM PROCEDURE: Before requesting warranty service, check the operator’s
manual, including any troubeshooting section, to verify product failure. To
begin the warranty replacement process, contact your authorized Morningstar
distributor or dealer for assistance with troubleshooting and, if necessary,
obtaining an RMA number.
An RMA number must be issued by Morningstar prior to return of any unit(s)
under this warranty. Required RMA information:
(A) purchase location – business or company name – and date
ProStar MPPT Operator’s Manual
71
6.0
(B) full model and serial numbers (SN is 8-digits on unit bar label)
(C) failure behavior, including LED indications (D) array configuration, panel
Pmax, Voc, Vmp, Isc, and nominal battery voltage – these specifications are
needed to receive assistance. (E) multi-meter available (for field
troubleshooting)
After the dealer is contacted, and is not able to assist with warranty claim,
contact Morningstar Technical support at support@morningstarcorp.com. Please
provide proof of date and place of purchase, and all details listed in
preceding paragraph.
WARRANTY EXCLUSIONS AND LIMITATIONS: This warranty does not apply under the
following conditions: · Damage by accident, negligence, abuse or improper use
· PV or load currents exceeding the ratings of the product · Unauthorized
product modification or attempted repair · Damage occurring during shipment ·
Damage resulting from acts of nature such as lightning, weather extremes, or
infestation THE WARRANTY AND REMEDIES SET FORTH ABOVE ARE EXCLUSIVE AND IN
LIEU OF ALL OTHERS, EXPRESS OR IMPLIED. MORNINGSTAR SPECIFICALLY DISCLAIMS ANY
AND ALL IMPLIED WARRANTIES, INCLUDING, WITHOUT LIMITATION, WARRANTIES OF
MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. No Morningstar
distributor, agent or employee is authorized to make any modification or
extension to this warranty.
MORNINGSTAR IS NOT RESPONSIBLE FOR INCIDENTAL OR CONSEQUENTIAL DAMAGES OF ANY
KIND, INCLUDING BUT NOT LIMITED TO LOST PROFITS, DOWN-TIME, GOODWILL OR DAMAGE
TO EQUIPMENT OR PROPERTY.
R20-4/23
72
Warranty and Policies
Morningstar Corporation 8 Pheasant Run, Newtown, PA 18940 USA
215-321-4457 www.morningstarcorp.com
support@morningstarcorp.com
ProStar MPPT Operator’s Manual
73
6.0
7.0
TECHNICAL SPECIFICATIONS
PS-MPPT-25 PS-MPPT-40 PS-MPPT-25M PS-MPPT-40M
Electrical:
Nominal Battery Voltage
All: 12 or 24 Volts
Battery Voltage Range
All: 10-35 Volts
Voltage Accuracy
All: 0.1% +/- 50mV
Max. Battery Current
25 Amps
40 Amps
Max. PV Open-Circuit Voltage
All: 120 Volts
Load Current Rating
25 Amps
30 Amps
Self-Consumption
All: ~0.6W (no meter) ~1.0W (w/backlit meter)
LED Indications
(1) status, (3) battery SOC
Transient Surge Protection
4500 watts (solar, battery, load)
Conversion Efficiency (peak)
All: 97.3%
Mechanical:
Dimensions: Standard
7.87(W) x 7.62(L) x 2.76(D) in. / 20.0(W) x 19.4(L) x 7.0(D) cm
Wire Box Option
7.87(W) x 11.22(L) x 3.62(D) in. /
20.0 (W) x 28.5 (L) x 9.2(D) cm
Weight:
Standard Version
3.1 lb /1.4 kg
Standard Version with Wire Box
3.4 lb /1.5 kg
Wire Size Range: Power Terminals
Maximum torque
2.5 – 16 mm2 / #14 – 6 AWG (up to #2 AWG with Wire Box)
35 in-lb
Battery voltage sense and RTS 0.25 – 1.0 mm2 / #24 – 16 AWG
Maximum torque
5 in-lb
Knock-outs (Wire Box option only)
M20, 1/2″, 1″ (trade sizes)
Enclosure
IP20, Type 1
Battery Charging:
4-Stage Charging:
Temperature compensation Coefficient:
Temperature compensated set-points:
Bulk, Absorption, Float, Equalize
-30mV / 12 volt / ºC
Absorption, Float, Equalize, HVD and HVDR (solar)
74
Technical Specifications
Battery Charging Set-points (@ 25°C): [multiply voltages by (2) for 24 volt systems]
DIP Switch Settings 4-5-6
Battery Type
Absorp. Stage (volts)
Float Stage (volts)
Equalize Stage (volts)
Absorp. Time (mins)
Equalize Time (mins)
Equalize Timeout
(mins)
Equalize Interval (days)
off-off-off 1 – Sealed*
14.00
13.50
150
off-off-on 2 – Sealed*
14.15
13.50
14.40
150
60
120
28
off-on-off 3 – Sealed*
14.30
13.50
14.60
150
60
120
28
off-on-on 4- AGM/Flooded 14.40
13.50
15.10
180
120
180
28
on-off-off 5 – Flooded
14.60
13.50
15.30
180
120
180
28
on-off-on 6 – Flooded
14.70
13.50
15.40
180
180
240
28
on-on-off 7 – L-16
15.40
13.40
16.00
180
180
240
14
on-on-on 8 – Custom
Custom Custom Custom Custom Custom Custom Custom
- “Sealed” baery type includes gel and AGM baeries
Current Compensation: 12 volt systems 24 volt systems Compensated set-points
-15 mV / A -30 mV / A
LVD
Load and Solar Control (multiply voltages by (2) for 24 volt systems):
Default values (customizable) LVD1
11.5V
LVR1
12.6V
Instant LVD HVD – solar
10.0V Highest set-point in preset charging profile [+ 0.5V (@ 25ºC)]
HVD – load1 HVDR – solar
Disabled 13.8V (@ 25ºC)
HVDR – load1
Disabled
LVD Warning
LVD Override – Lighting Test Maximum # LVD overrides (not customizable)
4 minutes
10 minutes No limit unless V_batt < Instant LVD
1 Applies to units with Firmware v27 and higher
ProStar MPPT Operator’s Manual
75
7.0
Lighting Control (DIP 1 ON): Lighting Timer Setting Lighting Test Timer Data &
Communications: Communication Port Comm. Protocols
Datalogging PC Software
Dusk-Dawn (default) 10 minutes
MeterBus Morningstar MeterBus;
MODBUS 6-8 months, daily records
MSView
Digital Meter:
Resolution Viewing Area Display Color Backlight Operating Temperature Storage
Temperature
Environmental: Maximum Operating Altitude Ambient Temperature Range:
T4 Certified
T5 Certified
Storage Temperature
Humidity
Tropicalization
128 x 64 70mm x 40mm
blue on white LED
-20ºC to +60ºC -30ºC to +80ºC
2000 meters
-40°C to +60°C -40°C to +45°C -40ºC to +80ºC
100% n.c. Conformally coated PCBs;
Marine-rated terminals
For hazardous location-IECEx/ATEX applications, see the addendum – part no.
MS-003244-EN – to this manual.
Protections
Power-up against any active faults Reverse Polarity – battery and array
Solar Short-Circuit
High Solar Voltage Disconnect
High Heatsink Temperature – Current De-rating
High Heatsink Temperature – Load Disconnect
Load Short-Circuit
Load Over-Current
Heatsink Temperature Limit
RTS Terminals
Battery Sense Terminals
76
Technical Specifications
ProStar MPPT Efficiency 12 Volt System 31 Vmp 62 Vmp 93 Vmp
APPENDIX A – Efficiency Graphs
600
550
500
450
400
Output Power (Watts)
350
300
250
200
150
100
50
100.00% 99.00% 98.00% 97.00% 96.00% 95.00% 94.00% 93.00% 92.00% 91.00% 90.00%
89.00% 88.00% 87.00% 86.00% 85.00% 84.00% 83.00% 82.00% 81.00% 80.00% 79.00%
78.00% 77.00% 76.00% 75.00% 74.00% 73.00% 72.00% 71.00% 70.00%
0
Efficiency (%)
ProStar MPPT Operator’s Manual
77
Appendices
100.00% 99.00% 98.00% 97.00% 96.00% 95.00% 94.00% 93.00% 92.00% 91.00% 90.00% 89.00% 88.00% 87.00% 86.00% 85.00% 84.00% 83.00% 82.00% 81.00% 80.00% 79.00% 78.00% 77.00% 76.00% 75.00% 74.00% 73.00% 72.00% 71.00% 70.00% 0
ProStar MPPT Efficiency 24 Volt System 62 Vmp 93 Vmp 50 100 150 200 250 300
350 400 450 500 550 600 650 700 750 800 850 900 950 1000 1050 1100 1150
Output Power (Watts)
78
Appendices
Efficiency (%)
APPENDIX B – De-rating Graphs
PS-MPPT 40A Charging Current vs. Array Voltage
OVER – VOL TAGE RANGE !
40
Charging Current (Amps)
0
80 85
90
95 100 105 110 115 120
Array Voltage (Volts)
Figure B-1
PS-MPPT 40 (mounted vertically on wall) Charging Current vs. Ambient Temp.
45
40
35
Max. Charging
30
Current 25
(Amps) 20
15
10 5 0 20 25 30 35 40 45 50 55 60
Ambient Temp. (ºC)
PS-40 31 VMP 12 & 24V
PS-40 62 VMP 12 & 24V
PS-40 93 VMP 12V
PS-40 93 VMP 24V
Figure B-2
ProStar MPPT Operator’s Manual
79
Appendices
PS-MPPT 25A (mounted vertically on wall) Charging Current vs. Ambient Temp.
30
25
20 Max.
Charging
Current (Amps)
15
10
5
0 20 25
30 35
40
45
50
Ambient Temp. (ºC)
55 60
Figure B-3
PS-25 31 VMP 12 & 24V
PS-25 62 VMP 12 & 24V
PS-25 93 VMP 12 & 24V
80
Appendices
APPENDIX C – Wire Sizing Minimum Wire Sizing
Wire sizing requirements are based on the ampacity current-carrying capacity –
of conductors. The NEC includes Ampacity Tables which are used to determine
the ampacity for a given wire size as indicated in Section 310.15.
ProStar MPPT power terminals are rated for 75ºC. When wires with a 90°C
temperature rating are used with terminals that have a 75°C temperature
rating, wire ampacity at 75°C must be used. This also applies to the
temperature ratings of breaker terminals.
Wire ampacity requirements for the battery and PV array circuits are as
follows:
Controller battery wire ampacity must be greater than or equal to 125% of
maximum continuous current (battery current rating of the controller) PV array
wire ampacity must meet both of the following requirements: Must be greater
than or equal to 156% of PV Array Isc without correction and adjustment
factors Must also be greater than or equal to 125% of PV Array Isc with
correction and adjustment factors Load wire ampacity must be greater than or
equal to the load breaker current rating. Wire ampacity correction and
adjustment factors may also be required to account for the following:
· maximum ambient temperature · temperatures at different parts of the circuit
(rooftops
or engine rooms for example) · wire terminal temperature ratings · multi-
conductor cables · conduit fill and other factors
ProStar MPPT Operator’s Manual
81
Appendices
Minimum Battery Wire Sizing (Table C-1) for 75º or 90ºC rated stranded copper wire
MODEL
Wire Size in a raceway, cable, or earth (AWG)1
30ºC 30º-60ºC
PS-MPPT
25
10 AWG
8 AWG > 35°C
6 > 55ºC
Wire Size in free air2
30ºC 30º-45ºC
10 AWG
10 AWG
Metric Wire Size (mm2)3
6-10
PS-MPPT 40
8 AWG
6 AWG > 35°C
4 AWG > 45°C
8 AWG
8 AWG
10-18
NOTES: 1 Per NEC 2021 [see NEC Table 310.15(b)(16)], ampacity for not more
than three current-carrying conductors in a raceway, cable, or earth (buried)
2 Per NEC 2021 [see NEC Table 310.15(b)(17)], ampacity for conductors in free
air 3 Estimated. See local code requirements for metric cable sizing
Table C-1. Minimum DC battery wire sizes for 75ºor 90ºC rated stranded copper
wire
Voltage Drop Tables
Good system design generally requires large conductor wires that limit voltage
drop losses to 2% or less. The tables below provide wire sizing for a maximum
of 2% voltage drop. Longer distance wire runs may require significantly larger
wire sizes to reduce the voltage drop to an acceptable level.
ProStar MPPT Voltage Drop Tables
2% Voltage Drop Chart (feet) for 75° or 90ºC Stranded Copper Wire – 12 Volt
System / Maximum 1-way Distance (feet), 12 Volt System – multiply values by
(2) for 24 Volt and by (4) for 48V, system. NOTE: Distances are estimates only
and can vary based on temperature, type of wire and other factors.
Wire Size 40A 35A 30A 25A 20A 15A 10A (AWG)
1/0 29.3 33.5 39.0 47.0 59.0 78.0 117.0
1* 23.2 26.5 31.0 37.1 46.0 62.0 77.0
2* 18.4 21.1 24.6 29.5 36.9 49.1 61.0
3* 14.6 16.7 19.5 23.3 29.2 38.9 48.6
4* 11.6 13.3 15.5 18.6 23.2 31.0 38.7
6
7.3 8.3 9.7 11.6 14.6 19.4 24.3
8
4.6 5.3 6.1 7.4 9.2 12.3 15.3
10
3.3 3.8 4.6 5.8 7.7 9.6
12
2.9 3.6 4.8 6.0
14
2.3 3.0 3.8
- Wire sizes larger than #2 AWG, or #6 AWG (#8 AWG with fine stranded wire) when using the terminal cover, must be terminated at a splicer block located externally to the ProStar MPPT. Use #2 AWG (or smaller) wire to connect the ProStar MPPT to a splicer block. Table C-2. Maximum one-way circuit distance (feet) for 12 Volt systems, stranded copper, 2% voltage drop
Appendices
82
Appendices
ProStar MPPT Operator’s Manual
83
2% Voltage Drop Chart (meters) for 75° or 90ºC Stranded
Copper Wire – 12 Volt System / Maximum 1-way Distance (meters), 12 Volt System
– multiply values by (2) for 24 Volt and by (4) for 48V, system. NOTE:
Distances are estimates only and can vary based on temperature, type of wire
and other factors.
Wire Size 40A 35A 30A 25A 20A 15A 10A (AWG)
70* 11.0 12.6 14.7 17.6 22.0 29.4 44.1
50* 7.6 8.7 10.2 12.2 15.3 20.3 30.5
35* 5.6 6.4 7.5 9.0 11.3 15.0 22.6
25* 4.1 4.6 5.4 6.5 8.1 10.8 16.3
16* 2.6 2.9 3.4 4.1 5.2 6.9 10.3
10 1.6 1.8 2.2 2.6 3.2 4.3 6.5
6
1.1 1.3 1.5 1.9 2.6 3.8
4
0.9 1.0 1.3 1.7 2.6
2.5
0.8 1.1 1.6
- Wire sizes larger than 35mm2,, or 16mm2 (10mm2 with fine stranded wire) when using the terminal cover, must be terminated at a splicer block located externally to the ProStar MPPT. Use 35mm2 (or smaller) wire to connect the ProStar MPPT to a splicer block. Table C-3. Maximum one-way circuit distance (meters) for 12 Volt systems, stranded copper, 2% voltage drop
Celsius to Fahrenheit Conversions
ºCelsius 30 35 40 45
ºFahrenheit 86 95 104 113
Table C-4. Celsius to Fahrenheit Conversions
Appendices
84
Appendices
ProStar MPPT Operator’s Manual
85
FOR CURRENT DETAILED CERTIFICATION LISTINGS, REFER TO:
Under, “Type”, choose, “Declaration of Conformity (DOC)”, to view list of product DOCs.
PROSTAR MPPT ADDENDUM TO OPERATOR’S MANUAL
Certifications
ProStar MPPTTM, MeterBusTM are trademarks of Morningstar Corporation.
MODBUSTM and MODBUS TCP/IPTM are trademarks of Modbus IDA.
©2023 Morningstar Corporation. All rights reserved.
Certifications
MS-001537 v3.6
86
UL1741 INVERTERS, CONVERTERS, AND CONTROLLERS AND INTERCONNECTION SYSTEM
EQUIPMENT FOR USE WITH DISTRIBUTED ENERGY SOURCES, SECOND EDITION, REVISION
THROUGH AND INCLUDING SEP 07, 2016 CSA C22.2#107.1-01 POWER CONVERSION
EQUIPMENT UL121201/CSA C22.2 #213 Non-incendive Electrical Equipment for Use
in Class I, Division 2 Hazardous (Classified) Locations, Groups A,B,C,D,
Temperature Group: T4, T5 (see product manual environmental specifications)
EMC Directives · Immunity: EN 61000-6-1 · Emissions: EN 61000-6-3
CISPR 22 Low Voltage Directive: IEC/EN 62109-1 1
Hazardous Locations for IECEx/ATEX Applications
IECEx ETL 20.0066X ITS20ATEX25933X IECEx: Ex ec ic IIC TX Gc ATEX: II 3G Ex ec
ic IIC TX Gc T4: -40°C Tamb +60°C T5: -40°C Tamb +45°C Prostar MPPT must be
verified with di-electric strength test specified by the relevant industrial
standard. The equipment must be placed inside an Ex-rated IP 54 enclosure in
accordance with IEC 60079 series. A tool is required in order to access the
equipment inside the enclosure.
Morningstar Corporation 8 Pheasant Run, Newtown, PA 18940 USA 10611 Iron
Bridge Road, Ste. L, Jessup, MD 20794 USA
MORNINGSTAR CORPORATION
MS-003244-EN-5
2
References
- Solar Charge Controllers & Inverters | Morningstar Off-grid Solar
- Support Library - Morningstar Corporation
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>