VERITAS 34138-M0033 NetBackup Flex 5360 NAS Storage Installation Guide
- June 16, 2024
- VERITAS
Table of Contents
- VERITAS 34138-M0033 NetBackup Flex 5360 NAS Storage
- Product Usage Instructions
- FAQs
- Technical Support
- Hardware overview
- Compute node drives
- System information
- Cables and connectors
- Preinstallation requirements
- Hardware installation procedures
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
VERITAS 34138-M0033 NetBackup Flex 5360 NAS Storage
VeritasTM 5360 Appliance
Specifications
- Product Name: VeritasTM 5360 Appliance
- Last Updated: 2023-12-14
- Document Version: Revision 1.0
- Trademark: Veritas, the Veritas Logo, and NetBackup
- Legal Notice: Veritas Technologies LLC
- Address: 2625 Augustine Drive Santa Clara, CA 95054
- Website: https://www.veritas.com
Product Usage Instructions
1. Installation Guide
To install the VeritasTM 5360 Appliance, please refer to the Hardware Installation Guide provided.
2. Technical Support
If you require technical support for the VeritasTM 5360 Appliance, please
visit the Veritas website at https://www.veritas.com/support.
The website provides information about our support offerings and how to
contact Technical Support.
3. Documentation
To access the latest documentation for the VeritasTM 5360 Appliance, visit the
Veritas website at
https://www.veritas.com/content/support/en_US/dpp.Appliances.html.
Make sure
to download the document with the most recent update date.
If you have any feedback, suggestions, or need to report errors or omissions in the documentation, please send an email to APPL.docs@veritas.com.
4. Veritas Services and Operations Readiness Tools (SORT)
Veritas Services and Operations Readiness Tools (SORT) is a website that offers information and tools to simplify administrative tasks related to the VeritasTM 5360 Appliance. To access SORT and explore the services and tools it provides for your product, refer to the data sheet available at SORT Datasheet.
FAQs
- Q: Where can I find the latest documentation for the VeritasTM 5360 Appliance?
- A: The latest documentation can be found on the Veritas website at https://www.veritas.com/content/support/en_US/dpp.Appliances.html.
- Q: How can I contact Technical Support for the VeritasTM 5360 Appliance?
- A: To contact Technical Support, please visit the Veritas website at https://www.veritas.com/support.
- Q: Where can I find additional resources and ask questions about the VeritasTM 5360 Appliance?
- A: You can find additional resources and ask questions on the Veritas community site at https://www.veritas.com/community/.
VeritasTM 5360 Appliance Hardware Installation Guide
Veritas 5360 Appliance Hardware Installation Guide
Last updated: 2023-12-14
Document version: Revision 1.0
Legal Notice
Copyright © 2023 Veritas Technologies LLC. All rights reserved.
Veritas, the Veritas Logo, and NetBackup are trademarks or registered
trademarks of Veritas Technologies LLC or its affiliates in the U.S. and other
countries. Other names may be trademarks of their respective owners.
This product may contain third-party software for which Veritas is required to
provide attribution to the third party (“Third-party Programs”). Some of the
Third-party Programs are available under open source or free software
licenses. The License Agreement accompanying the Software does not alter any
rights or obligations you may have under those open source or free software
licenses. Refer to the Third-party Legal Notices document accompanying this
Veritas product or available at:
https://www.veritas.com/about/legal/license-agreements
The product described in this document is distributed under licenses
restricting its use, copying, distribution, and decompilation/reverse
engineering. No part of this document may be reproduced in any form by any
means without prior written authorization of Veritas Technologies LLC and its
licensors, if any.
THE DOCUMENTATION IS PROVIDED “AS IS” AND ALL EXPRESS OR IMPLIED CONDITIONS,
REPRESENTATIONS AND WARRANTIES, INCLUDING ANY IMPLIED WARRANTY OF
MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE OR NON-INFRINGEMENT, ARE
DISCLAIMED, EXCEPT TO THE EXTENT THAT SUCH DISCLAIMERS ARE HELD TO BE LEGALLY
INVALID. VERITAS TECHNOLOGIES LLC SHALL NOT BE LIABLE FOR INCIDENTAL OR
CONSEQUENTIAL DAMAGES IN CONNECTION WITH THE FURNISHING, PERFORMANCE, OR USE
OF THIS DOCUMENTATION. THE INFORMATION CONTAINED IN THIS DOCUMENTATION IS
SUBJECT TO CHANGE WITHOUT NOTICE.
The Licensed Software and Documentation are deemed to be commercial computer
software as defined in FAR 12.212 and subject to restricted rights as defined
in FAR Section 52.227-19 “Commercial Computer Software – Restricted Rights”
and DFARS 227.7202, et seq. “Commercial Computer Software and Commercial
Computer Software Documentation,” as applicable, and any successor
regulations, whether delivered by Veritas as on premises or hosted services.
Any use, modification, reproduction release, performance, display or
disclosure of the Licensed Software and Documentation by the U.S. Government
shall be solely in accordance with the terms of this Agreement.
Veritas Technologies LLC 2625 Augustine Drive Santa Clara, CA 95054
Technical Support
Technical Support maintains support centers globally. All support services
will be delivered in accordance with your support agreement and the then-
current enterprise technical support policies. For information about our
support offerings and how to contact Technical Support, visit our website:
https://www.veritas.com/support
You can manage your Veritas account information at the following URL:
https://my.veritas.com
If you have questions regarding an existing support agreement, please email
the support agreement administration team for your region as follows:
Worldwide (except Japan) Japan
CustomerCare@veritas.com CustomerCare_Japan@veritas.com
Documentation
Make sure that you have the current version of the documentation. Each
document displays the date of the last update on page 2. The latest
documentation is available on the Veritas website:
https://www.veritas.com/content/support/en_US/dpp.Appliances.html
Documentation feedback
Your feedback is important to us. Suggest improvements or report errors or
omissions to the documentation. Include the document title, document version,
chapter title, and section title of the text on which you are reporting. Send
feedback to:
APPL.docs@veritas.com
You can also see documentation information or ask a question on the Veritas
community site:
https://www.veritas.com/community/
Veritas Services and Operations Readiness Tools (SORT)
Veritas Services and Operations Readiness Tools (SORT) is a website that
provides information and tools to automate and simplify certain time-consuming
administrative tasks. Depending on the product, SORT helps you prepare for
installations and upgrades, identify risks in your datacenters, and improve
operational efficiency. To see what services and tools SORT provides for your
product, see the data sheet:
https://sort.veritas.com/data/support/SORT_Data_Sheet.pdf
Chapter
Hardware overview
This chapter includes the following topics: About the appliance and the
storage shelves Compute node drives About the 5360 Appliance control panel
Compute node rear panel 5U84 storage shelf drawers and disk drives 5U84
storage shelf control panel 5U84 storage shelf rear panel 5U84 storage shelf
RAID controller 5U84 storage shelf Expansion module Cables and connectors
About IPMI configuration
About the appliance and the storage shelves
The Veritas 5360 Appliance is a hardware and software storage system designed
for large workloads. It provides high performance with multiple service
offerings and gets deployed in less than 60 minutes.
Hardware overview 7 About the appliance and the storage shelves
Figure 1-1
Veritas 5360 Appliance
The Veritas 5360 appliance is available as a single-node or a two-node
appliance.
The Veritas 5360 appliance and storage shelves provide storage capacity in
several configurations. The 5360 compute node does not provide any storage.
The 5U84 storage shelves provide storage capacity for the appliance system.
You must have a Primary Storage Shelf that connects to the compute node. You
can add up to three optional Expansion Storage Shelves for additional storage.
The Veritas 5360 high availability (HA) configuration includes two compute
nodes, one required Primary Storage Shelf, and up to three optional Expansion
Storage Shelves.
The Veritas 5360 Appliance supports the following software:
Flex Appliance release 3.2 and above
Before you install the hardware, refer to the following section for important
details about the dimensions of the hardware.
See “Dimensions and determining rack locations” on page 28.
The compute node is two rack units (2RU) high.
Each storage shelf is 5RU high and contains 2 drawers with 42 disk drive slots
per drawer.
The rear of the Primary shelf includes two redundant RAID controller I/O
modules. The Expansion shelves contain two I/O modules for connectivity to the
Primary shelf and to other Expansion shelves. Half capacity storage shelves
are also available for the 5360 appliances.
Hardware overview 8 Compute node drives
Refer to the Veritas 5360 Product Description Guide at the following site for
details about usable storage capacity.
Veritas Appliance documentation
Compute node and storage shelf power requirements
With the required 5U84 Primary Storage Shelf, the compute node operates at 220
VAC at 3.1 A with C13 and C14 connectors.
Compute node drives
The front panel of the compute node contains 8 drive slots. The slots are numbered from zero in the left corner to 7 in the right corner.
Figure 1-2
Veritas 5360 Appliance front drive assignments
Slots 0 and 1 – RAID-1 OS and log volume Slot 2 – OS/log hot spare Slots 3
through 7 – blank
About the 5360 Appliance control panel
The front control panel provides push button system controls and LED
indicators for several system features.
Hardware overview 9 About the 5360 Appliance control panel
Table 1-1
Control panel system LED descriptions
LED
System information
Power button with integrated LED
The Power button toggles the system on and off. This button also functions as
a sleep button if enabled by an ACPI compliant operating system. Pressing this
button sends a signal to the integrated BMC that either powers on or powers
off the system. Holding the power button for 10 seconds or more leads to a
hard shutdown.
The integrated LED is a single color (green) and supports different indicator
states as defined in the following table.
See “About the Power button LED states” on page 14.
Drive Activity LED
The drive activity LED on the front panel indicates drive activity from the server board SATA and sSATA storage controllers. The server board also has an I2C header labeled “SAS_MODULE_MISC” to provide access to this LED for add-in SATA or sSATA storage controllers.
Hardware overview 10 About the 5360 Appliance control panel
Table 1-1
Control panel system LED descriptions (continued)
LED
System information
System ID button with integrated Toggles the integrated ID LED and the blue server board
LED
system ID LED on and off. Both LEDs are tied together
and show the same state. The onboard system ID LED is
on the back edge of the server board, viewable from the
back of the system. The system ID LEDs are used to
identify the system for maintenance when installed in a
rack of similar server systems. Two options available for
illuminating the system ID LEDs are:
The front panel system ID LED button is pushed, which causes the LEDs to
illuminate to a solid On state until the button is pushed again.
An IPMI Chassis Identify command is remotely entered that causes the LEDs to
blink for 15 seconds.
NMI button (recessed, tool required for use)
When the NMI button is pressed, it puts the system in a halt state and issues a non-maskable interrupt (NMI). This situation can be useful when performing diagnostics for a given issue where a memory download is necessary to help determine the cause of the problem. To prevent an inadvertent system halt, the actual NMI button is behind the front control panel faceplate where it is only accessible with the use of a small tipped tool like a pin or paper clip.
System Cold Reset Button
When pressed, this button reboots and re-initializes the system. Unlike the power button, the reset button does not disconnect the power to the system. It just starts the system’s Power-On Self-Test (POST) sequence over again.
Hardware overview 11 About the 5360 Appliance control panel
Table 1-1
Control panel system LED descriptions (continued)
LED
System information
System Status LED
The system status LED is a bi-color (green/amber) indicator that shows the
current health of the server system.
The system provides two locations for this feature; one is on the front
control panel and the other is on the back edge of the server board, viewable
from the back of the system. Both LEDs are tied together and show the same
state. The system status LED states are driven by the server board platform
management subsystem. When the server is powered down (transitions to the DC-
Off state or S5), the BMC is still on standby power and retains the sensor and
front panel status LED state established before the power-down event.
Two locations are provided for you to monitor the health of the system. You
can find the first location on the front control panel, while the second
location is located on the back edge of the server board. It is viewable from
the rear of the appliance. Both LEDs show the same state of health.
See “About the System Status LED states” on page 11.
About the System Status LED states
The following table provides a description of each LED state.
Table 1-2
System Status LED states
Color State
Criticality
Description
No color
Off – The
Not ready
system is not
operating.
System power is off (AC and/or DC) System is in EuP Lot6 Off Mode
Hardware overview 12 About the 5360 Appliance control panel
Table 1-2
System Status LED states (continued)
Color State
Criticality
Green Solid on (SO) Healthy
Description
System is in S5 Soft-Off State Indicates that the system is running (in S0
State) and its status is “Healthy”. The system is not exhibiting any errors.
AC power is present and BMC has booted and manageability functionality is up
and running. After a BMC reset, and with the chassis ID solid on, the BMC is
booting Linux. Control has been passed from BMC uBoot to BMC Linux. The BMC
is in this state for roughly 1020 seconds.
Green ~1 Hz blink
Degraded
System degraded:
The system is
operating in a
degraded state
although still
functional.
or
The system is operating in a redundant state but with an impending failure warning.
Redundant loss, such as power supply or fan. Applies only if the associated
platform sub-system has redundancy capabilities.
Fan warning or failure when the number of fully operational fans is more than
minimum number needed to cool the system.
Non-critical threshold crossed: Temperature (including HSBP temp), voltage,
input power to power supply, output current for main power rail from power
supply and Processor Thermal Control (Therm Ctrl) sensors.
Power supply predictive failure occurred while redundant power supply
configuration was present.
Unable to use all of the installed memory (one or more DIMMs failed/disabled
but functional memory remains available).
Battery failure
BMC executing in uBoot. (Indicated by Chassis ID blinking at 3Hz). System in
degraded state (no manageability). BMC uBoot is running but has not
transferred control to the BMC Linux. Server will be in this state 6-8 seconds
after BMC reset while it pulls the Linux image into flash.
Hardware overview 13 About the 5360 Appliance control panel
Table 1-2
System Status LED states (continued)
Color State Green ~1 Hz blink
Criticality
Degraded (continued)
Description
System degraded (continued):
BMC Watchdog has reset the BMC. Power unit sensor offset for configuration
error is asserted. SSD Hot Swap Controller is off-line or
degraded.
Green ~1 Hz blink and amber altern atively
System is initializing after source power is applied
PFR in the process of updating/authenticating/recovering when source power is
connected, system firmware being updated.
System not ready to take power button event/signal.
Amber ~1 Hz blink
Non-critical
Non-fatal, although the system is likely to fail due
The system is operating in a degraded state
to the following issues:
Critical threshold crossed Voltage, temperature (including HSBP temp), input
with an
power to power supply, output current for
impending failure main power rail from power supply and
warning. However, the system is still functioning.
PROCHOT (Therm Ctrl) sensors. VRD Hot asserted Minimum number of fans to cool
the system
not present or failed
Hard drive fault
Power Unit Redundancy sensor Insufficient resources offset (indicates not enough power supplies present)
In non-sparing and non-mirroring mode, if the threshold of correctable errors is crossed
within the window.
Invalid firmware image detected during boot
up or firmware update.
Hardware overview 14 About the 5360 Appliance control panel
Table 1-2
System Status LED states (continued)
Color State
Criticality
Description
Amber Solid on
Critical, non-recoverable System is halted
Fatal alarm system has failed or shutdown:
CPU CATERR signal asserted MSID mismatch detected (CATERR also
asserts for this case) CPU0 is missing CPU Thermal Trip No power power fault
DIMM failure when there is only one DIMM
present; no other good DIMM memory present Runtime memory uncorrectable error
in non-redundant mode.
DIMM Thermal Trip or equivalent BMC/Video memory test failed (Chassis ID
shows blue/solid-on for this condition) SBB Thermal Trip or equivalent 240VA
fault Both uBoot BMC FW images are bad
(Chassis ID shows blue/solid-on for this condition) Fatal Error in processor
initialization: Processor family not identical Processor model not identical
Processor core/thread counts not identical Processor cache size not identical
Unable to synchronize processor
frequency Unable to synchronize QPI link frequency BMC fail authentication
with non-recoverable condition, system hang at T-1; boot PCH only, system
hang; PIT failed, system lockdown.
About the Power button LED states
The following table provides a description of each power state.
Hardware overview 15 About the 5360 Appliance control panel
Table 1-3 State Power – off
Power button LED states
Power Mode Non-ACPI
LED Off
Power – on Non-ACPI
On
S0
ACPI
Steady on
(Advanced Configuration and Power Interface)
S5
ACPI
Off
(Advanced Configuration and Power Interface)
Description The system power is off, and the BIOS has not initialized the
chipset. The system power is on and the green Power button LED is active. The
system and the operating system are up and running.
Mechanical is off and the operating system has not saved any context to the
hard disk drive.
About the integrated BMC beep codes
The integrated BMC may generate beep codes upon detection of failure
conditions. Beep codes are sounded each time the problem is discovered, such
as on each power-up attempt, but are not sounded continuously.
Table 1-4
Integrated BMC beep codes
Associated sensors
Reason for beep
CPU missing sensor
No CPUs installed or first CPU socket is empty.
MSID mismatch sensor
MSID mismatch occurs if a processor is installed into a system board that has incompatible power capabilities.
Power fault
DC power unexpectedly lost (power good dropout) Power unit sensors report power unit failure offset.
Power unit soft power control Power control fault (power good assertion timeout). failure offset
VR watchdog timer
VR Watchdog Timer sensor assertion
PS status
The system does not power on or unexpectedly power off and a power supply unit (PSU) is present that is an
Hardware overview 16 Compute node rear panel
Compute node rear panel
The rear panel of the compute node contains several components and default
ports. Three PCIe riser assemblies support various configurations.
PCIe riser card assemblies 1 and 2 each support three standard PCIe cards,
while PCIe riser card assembly 3 supports two low profile PCIe cards.
Figure 1-3
Veritas 5360 Appliance rear panel
Back panel layout of the Veritas 5360 Appliance 1. Redundant 1300 W power
modules 2. VGA port 3. Serial port (not used) 4. USB 3.0 ports 5. IPMI port 6.
OCP 1-10 GbE ports 7. PCIe Riser # 1 8. PCIe Riser # 2 9. PCIe Riser # 3
5U84 storage shelf drawers and disk drives
Each storage shelf includes 2 drawers with 42 disk drive slots each for a
total of 84 slots. The following diagrams describe the disk layout for the top
drawer and the bottom drawer. The slot numbers start at the front, left of the
drawer. Slot numbers end in the last row at the right rear of the drawer.
Hardware overview 17 5U84 storage shelf drawers and disk drives
The following diagrams show all of the slots in each drawer. The photographs
show the number of the first slot in each drawer.
The top drawer contains slots 0 through 41.
Figure 1-4
Half-populated storage shelf
Figure 1-5
Hardware overview 18 5U84 storage shelf drawers and disk drives
Fully-populated storage shelf
The bottom drawer contains slots 42 through 83.
Figure 1-6
Half-populated storage shelf
Hardware overview 19 5U84 storage shelf drawers and disk drives
Disk drives are not preconfigured before they ship from the factory. During
the initial installation any drive can be placed into any slot for a full
storage shelf. After the compute nodes and storage shelves are configured and
operational, you cannot rearrange the drives. The compute nodes support
storage shelves with half of the total usable capacity. This configuration
includes 45 disk drives and 39 blank carriers. You receive one container of 42
disk drives and another container of 3 drives and 39 blanks. Install these
disk drives into the storage shelf drawers. Refer to the following link for
the disk drive layout for a half capacity storage shelf. See “Installing disk
drives and blanks into a half-capacity storage shelf” on page 48. Each disk
drive is encased in a carrier. A label on the top of the carrier identifies
the storage capacity of the disk that is inside the carrier.
A blank carrier is very similar to a disk drive carrier. The upper latch
assembly is the same. A label identifies the carrier as a blank instead of
storage capacity.
Hardware overview 20 5U84 storage shelf control panel
5U84 storage shelf control panel
The following table explains the components in the storage shelf control
panel.
Number 1
Component Unit identification (ID) display
2
Input switch
3
Power LED
Description
A numerical enclosure display that helps when setting up and maintaining
multiple storage shelves. The Primary shelf has a default value of 00. The
first Expansion shelf has a value of 01. Subsequent Expansion shelves have a
value of 02 and 03.
Used to set the unit identification display.
Amber when the system is in standby mode.
Green when the system is on.
Hardware overview 21 5U84 storage shelf rear panel
Number 4
Component Module fault LED
5
Logical status LED
6
Drawer 1 fault LED
7
Drawer 2 fault LED
Description
Amber when there is a system hardware fault.
An LED may be lit on a power supply, drawer, disk carrier, cooling module, or
I/O module to identify which component is at fault.
Shows a change of status or a fault. Typically these changes of status or
faults are associated with the shelf’s disk drives. However, the Logical
Status LED can also indicate an issue with an internal RAID controller or
external RAID controller, or with a host bus adapter.
Indicates a drive, cable, or sideplane fault in Drawer 1, the top drawer.
Indicates a drive, cable, or sideplane fault in Drawer 2, the bottom drawer.
5U84 storage shelf rear panel
The rear panel of a 5U84 storage shelf contains the following components: Two
I/O module slots, which contain either redundant RAID controllers or
Expansion modules. (Item 1) Five cooling modules (Item 2)
Two power supply units (PSUs) (Item 3)
Hardware overview 22 5U84 storage shelf RAID controller
Each cooling module contains two fans. Cooling modules can be individually
replaced but cannot be taken apart to replace only one fan. Refer to the
following sections for information about the I/O modules. See “5U84 storage
shelf RAID controller” on page 22. See “5U84 storage shelf Expansion module”
on page 23.
5U84 storage shelf RAID controller
The Primary Storage Shelf contains two RAID controllers in I/O module slots.
The controllers are labeled A and B, from left to right as you look at the
rear panel of a shelf. Each controller has two sets of SAS-3 ports. From left
to right the SAS-3 ports for each controller are labeled 3, 2, 1, and 0. The
single SAS-3 port on the left side of each RAID controller connects to a SAS-3
port on the Expansion shelf.
Hardware overview 23 5U84 storage shelf Expansion module
5U84 storage shelf Expansion module
Each Expansion storage shelf contains two I/O modules. The modules are labeled
A and B, from left to right as you look at the rear panel of a shelf. Each
module has three SAS-3 ports that are labeled A, B, and C from left to right.
A yellow label states that port B is for attachment to a server only. You
cannot use this port without permission and assistance from Veritas Technical
Support.
The SAS-3 ports connect to the SAS port on each RAID controller on the Primary
shelf and to other Expansion shelves.
SAS3 ports
A
B
C
Ethernet port
Cables and connectors
Compute nodes connect to each other with 1G Ethernet cables. The compute nodes connect to the Primary Storage Shelf with SAS-3 cables. The Primary Storage Shelf connects to Expansion Storage Shelf I/O modules with SAS-3 cables. Expansion Storage Shelves connect to each other with SAS-3 cables. The power connector that attaches to a storage shelf has a right-angled form factor.
Hardware overview 24 About IPMI configuration
A security tie assures continued connection between the power cable and the
storage shelf.
About IPMI configuration
The Intelligent Platform Management Interface (or IPMI) provides management
and monitoring capabilities independently of the host system’s CPU, firmware,
and operating system. You can configure the IPMI sub-system for your
appliances. You can use the remote management port, located on the rear panel
of the appliance, to connect to the IPMI sub-system. The following figure
shows the remote management port (or the IPMI port) on the rear panel of a
5360 Appliance:
The IPMI is beneficial after an unexpected power outage shuts down the
connected system. In case the appliance is not accessible after the power is
restored, you can use a laptop or desktop computer to access the appliance
remotely by using a network connection to the hardware rather than to an
operating system or login shell. This enables you to control and monitor the
appliance even if it is powered down, unresponsive, or without any operating
system. The following diagram illustrates how IPMI works:
Hardware overview 25 About IPMI configuration
The following are some of the main uses of IPMI: Manage an appliance that is
powered off or unresponsive. Using the IPMI, you
can power on, power off, or restart the appliance from a remote location.
Provide out-of-band management and help manage situations where local
physical access to the appliance is not possible or preferred like branch
offices and remote data centers. Access the Appliance Shell Menu remotely
using IPMI if regular network interface is not possible. Reimage the appliance
from the IPMI interface by using ISO redirection. Monitor hardware health of
the appliance from a remote location. Avoid messy cabling and hardware like
keyboard, monitor, and mouse (KVM) solutions to access the appliance. Required
to elevate to an unrestricted shell for support when in lockdown mode.
2 Chapter
Preinstallation requirements
This chapter includes the following topics: Customer-provided environment and
supplies Appliance shipping container contents Storage shelf shipping
container contents Dimensions and determining rack locations Best practices
for rack installation Storage shelf rack requirements Heat dissipation Cable
length verification Prerequisites for IPMI configuration
Customer-provided environment and supplies
For best ventilation, the rack cabinet: Should be at least 100 cm (4 feet)
from walls Should have at least 100 cm (4 feet) from other cabinets on the
front and back
of the appliance and the storage shelves Data centers with two-foot spaces in
the front and in the back of the appliances are acceptable with proper cooling
and ventilation. Refer to the following section for more details.
Preinstallation requirements 27 Appliance shipping container contents
See “Heat dissipation” on page 31. The following describes the necessary
personnel and equipment that are needed at the installation site: At least
three people or a mechanical lift to move the appliance and the storage
shelves. Cables to connect the appliance to your corporate network. A USB-
keyboard and a monitor to connect to the appliance. A 19-inch rack with dual
Power Distribution Units (PDUs) with 120VAC or
220VAC power supplies for the compute node. A magnetic Philips-head screw
driver to install the storage shelf rails into the
rack. A screwdriver with a 2mm Hex bit to secure the bezels to the front of
each
storage shelf drawer. A 19-inch rack with dual Power Distribution Units (PDUs)
with 220VAC power
input for the storage shelves. See “Best practices for rack installation” on
page 30.
Appliance shipping container contents
The appliance and each storage shelf are shipped in separate containers. Each
container includes other boxes and contents. The disk drives are installed
into the appliance and the storage shelf at the factory. The following items
ship within the appliance box. Cables to connect the appliance to the Primary
external storage.
Four SAS-3 cables for a non-HA compute node. Four additional (total of eight)
SAS-3 cables for an HA compute node.
Cables to connect the HA compute nodes. Two CAT-6 Ethernet cables for
interconnection between HA compute nodes. Included in Accessory Package.
QR code card that includes links to the following items: Veritas Appliance
Getting Started documents
(https://www.veritas.com/content/support/en_US/article.100053037) such as
deployment plans and cabling posters
Preinstallation requirements 28 Storage shelf shipping container contents
Appliances Support page
(https://www.veritas.com/content/support/en_US/dpp.Appliances) that links to
the appliance documentation and other resources
Envelope containing the following: Warranty and license information
Accessory box containing rack rails Two power cables Bezel
Storage shelf shipping container contents
The appliance and each storage shelf are shipped in separate containers. Each
container includes other boxes and contents. The following items ship within
the storage shelf box. Rack rails Two SAS-3 cables Two power cords
Dimensions and determining rack locations
Physical specifications for the compute node include the following. Each node
is two rack units (2RU) high. Node measurements are listed below.
Height: 8.7cm (3.43″) (approximately 2U) Width: 44.6cm (17.56″) Length/depth:
77.0cm (30.31″) The compute node rails are extensible to 820mm (32in). The
minimum distance or depth allowed between the rack posts is 623mm (24.6″). The
maximum distance or depth allowed between the rack posts is 942mm (37″).
Physical specifications for the 5U84 storage shelves include the following.
Each storage shelf is 5RU high. Storage shelf measurements are listed below.
Height: 22.3 cm (8.75″) (approximately 5U – shelf, overall)
Preinstallation requirements 29 Dimensions and determining rack locations
Width: 48.3 cm (19.0″) (across the mounting flange) Length/depth: 93.3cm
(36.75″) (from rear of the front flanges to the rear
extremity of the chassis)
Note: The 5U84 storage shelf is longer than a standard IEC-compliant rack. Be
sure that your rack cabinet and Power Distribution Units accommodate the
length of the storage shelves.
The storage shelf rails measure 71.3cm to 88.4cm (28″ to 34.8″) in length. Be
sure that your rack accommodates this distance from the inside of the front
post to the inside of the rear post. Plan for additional space to accommodate
power strips, power cords, and other cables.
When you plan the installation be sure to allocate enough space for all of the
hardware. A typical installation has the storage shelves on the bottom and the
compute node(s) at the top. To help you identify RU spacing, many rack
manufacturers use a system of lines and sequential numbers starting at the
bottom of the rack. The front and the rear of the rack are marked the same to
ensure that the rails are installed straight and level. One RU has three
holes. The holes for one RU are typically marked with a line below the bottom
hole and another line at the top hole.
Use the rack templates to determine the mounting locations for all devices.
Preinstallation requirements 30 Best practices for rack installation
To determine rack locations for the hardware 1 Determine the total number of
rack units (RUs) that you need as follows: 2 Use the rack templates to
determine RU locations. 3 Fold the compute node templates at the horizontal
yellow lines. 4 Use the following graphics to determine where pins and screws
for the storage
shelves fit into the rack. The front of each rail includes four pins that
insert into the rear of the front
rack post. One screw fits into the middle hole of the middle RU. The rear of
each rail includes four pins that insert into the inside of the rear
rack post. Two screws insert into the front of the rear rack post. The screws
install into the middle hole in the first and the fifth RU.
5 Record the rack positions to help you locate them easily when mounting the
hardware.
Best practices for rack installation
Prepare for the hardware installation by following these recommendations. The
appliance requires two RUs of space. Install the appliance in the space that
is directly above the storage shelves. Two people should install the rails;
one person at the back of the rack and one
at the front. Two people should lift and place the appliance into the mounted
rails.
The storage shelves are heavier than the appliance and should be installed as
close to the bottom of the rack as possible.
Always install the heavier storage shelves at the bottom of the rack. Best
practices recommend that you install hardware at the bottom of a rack first.
Then work your way up the rack.
Determine device order and cabling limits.
Be aware of the depth of the guide rails and the devices. Ensure that the
distance between cabinet posts accommodates the rails, devices, cables, and
extending ears.
Physically hold a SAS-3 cable between the intended locations for the appliance
and the last storage shelf. Visually confirm that the cable is long enough.
Preinstallation requirements 31 Storage shelf rack requirements
Storage shelf rack requirements
For best ventilation, the rack cabinet: Should be at least 100 cm (4 feet)
from walls. Should have at least 100 cm (4 feet) from other cabinets on the
front and back
of the appliance and the storage shelves. Data centers with two-foot spaces in
the front and in the back of the appliances
are acceptable with proper cooling and ventilation There must be a minimum
depth of 76 cm (30 in.) between the front of the rack
and the rear of the rack. The compute node rails are extensible to 820mm
(32in). The minimum distance
or depth allowed between the rack posts is 623mm (24.6″). The maximum distance
or depth allowed between the rack posts is 942mm (37″). Storage shelves should
be installed lower in the rack than the appliance. The following list
describes the necessary personnel and equipment that customers must supply at
the installation site: At least two people or a mechanical lift to move the
appliance and the storage shelves. Two people to install the rails; one person
at the back of the rack and one at the front Two people to lift and place the
storage shelf into the mounted rails Cables to connect the appliance to your
corporate network. A USB-keyboard and a monitor to connect to the appliance. A
19-inch rack with dual Power Distribution Units (PDUs) with 220VAC power
supplies.
Heat dissipation
Air flows from the front of each unit and exits from the rear of each unit.
You can install the optional bezel without disruption to the airflow. For best
ventilation, the rack cabinet should: Be at least 100 cm (4 feet) from walls.
Be at least 100 cm (4 feet) from other cabinets on the front and back of the
appliance and the storage shelves.
Preinstallation requirements 32 Cable length verification
Note: Data centers with two-foot spaces in the front and in the back of the
appliances are acceptable with proper cooling and ventilation.
Veritas provides the following requirements to ensure sufficient cooling.
Veritas requires that you install the system in a National Engineering
Manufacturer’s Association (NEMA)-certified or equivalent rack. A minimum of 3
inches (7.6 cm) of space must be between the front of an
appliance and the cabinet door or other air block. A minimum of 6 inches (15.2
cm) of space must be between the rear of an
appliance and the cabinet rear or other air block. A minimum of 1 inch (2.5
cm) of space must be between the front of a storage
shelf and the cabinet door or other air block. A minimum of 2 inches (5.0 cm)
of space must be between the rear of a storage
shelf and the cabinet rear or other air block. Refer to the Veritas Appliance
Product Description Guide for specifications about temperature and cooling.
Appliance documentation
Cable length verification
Before you install and connect the hardware, be sure to verify that you have
the correct length of cables for your setup. Each rack unit (RU) is 44.50 mm
(1.752 inches) in height. The compute node is 2RU high. The 5U84 Storage
Shelves are 5RU high. Two SAS-3 cables ship with each Expansion Storage Shelf.
Each SAS-3 cable is 1-meter (3.28 feet) long.
Note: If you must have Expansion shelves in different racks be sure that the
SAS-3 cables are long enough. Do not stretch the cables too tightly or try to
use adapters or extensions.
Prerequisites for IPMI configuration
Verify the following configuration prerequisites: The remote management port
auto-negotiates its link speed to 1 Gbps.
Preinstallation requirements 33 Prerequisites for IPMI configuration
Note: If the IPMI port is connected to a managed switch port, it is recommended that you configure the switch port to auto-negotiation
If a firewall exists between the appliance and the remote devices that manage an appliance (like a laptop computer), open the following ports:
66 80 162 443 623 627 5120 5124 5900 5902
SOL SSH HTTP SNMP HTTPS Floppy/USB media Secured Floppy/USB media CD Secured CD KVM Secured KVM
Note: If you have a private internal network, remember to configure the
settings accordingly in your network address translation (NAT).
The remote management port must be configured as a DHCP or static address.
3 Chapter
Hardware installation procedures
This chapter includes the following topics: Overview Installing a storage
shelf Installing disk drives into a full-capacity storage shelf Installing
disk drives and blanks into a half-capacity storage shelf Installing the
compute node rack rails Installing the compute node into a rack Connecting the
hardware to one compute node Connecting the hardware to two compute nodes
Connecting Flex nodes to the network Connecting the power cords Turning on the
hardware and verifying operation Configuring the Veritas Remote Management
Interface from a Flex Appliance Accessing and using the Veritas Remote
Management interface
Overview
This chapter describes the procedures to install one or two compute nodes, one
Primary Storage Shelf, and up to three Expansion Storage Shelves.
Hardware installation procedures 35 Installing a storage shelf
Installing a storage shelf
You can use this installation procedure for a Primary Storage Shelf and up to
three Expansion Storage Shelves. For the systems that include one or more
Expansion Shelves, install those units first followed by the Primary Shelf.
Always load hardware into a rack from the bottom to ensure personal safety and
proper weight distribution of equipment.
From the inside of the front post to the inside of the rear post the rails
measure 713mm to 884mm (28in to 34.8in). Be sure that your rack accommodates
this distance. Allow extra space to accommodate power strips, power cords, and
other cables.
Warning: A storage shelf without disk drives weighs up to 61.65kg (135.72lbs).
To avoid potential equipment damage and personal injury, do not install disk
drives into the storage shelves before mounting them into the rack. The added
weight of the disk drives hinders the ability to safely install the storage
shelves. Use the lifting straps that are provided with the shelf to remove the
shelf from the shipping container. Use a mechanical lift or have three people
raise the shelf into position. The rear of the shelf is heavier than the front
of the shelf.
To install the storage shelf rails
Veritas recommends that two people install the rails. One person works at the
back of the rack and one person is at the front of the rack.
A magnetic Philips-head screwdriver is required to install screws into the
storage shelf rails.
Hardware installation procedures 36 Installing a storage shelf
1 The storage shelf rails are extended to full length in the shipping
container. It is easier to install the rails when they are at their shortest
length.
2 Use the four adjuster screws on the inside of the rail to increase or
decrease the rail length.
3 Identify the left and the right rails which are labeled LH (left-hand) or RH
(right-hand) on the front inside of the rail.
Note the ledge at the bottom of each rail. The storage shelf sits on the
ledges which must be positioned on the inside of the rack. The ledges must not
be located between the rail and the rack wall. 4 Locate the pins on the front
and the rear of the rails.
Hardware installation procedures 37 Installing a storage shelf
5 Use the printed rack templates that are provided with the hardware. One side
of the template shows the front of the rail. The other side of the template
shows the rear of the rail. The template shows the five rack units (RUs) to
scale.
Hardware installation procedures 38 Installing a storage shelf
6 Start with the left rail. Place the rail pins inside the front of the rack.
Hardware installation procedures 39 Installing a storage shelf
7 Extend the rail assembly to enable the rear rail pins to engage.
8 Verify that the pins are fully seated in the holes in the rack posts. 9
Secure the four adjuster screws as needed. Do not over-torque. 10 Repeat the
process for the right rail. 11 Verify that the left rails and the right rails
use the same rack holes and are
parallel.
Hardware installation procedures 40 Installing a storage shelf
12 Identify the three different types of screws.
Descriptions of the screws are provided in the following table.
Number Description
Rack location(s)
Rail location(s)
1
Long fastening screw with two washers Front: Center holes in first and Front: Top and bottom holes.
– for use after shelf is installed in rails. fifth rack units (RUs).
Rear: N/A
Install the washer with the gap first. Rear: N/A
2
Medium-sized clamping screw
Front: Center hole of third rack Front: Center hole.
unit (RU).
Rear: Top and bottom holes.
Rear: Center holes in first and
fifth rack units (RUs).
3
Small rear fastening screw
Front: N/A Rear: N/A
Front: N/A
Rear: Connects from chassis lock tab to hole in triangular end of rail.
Hardware installation procedures 41 Installing a storage shelf
13 Install the medium-sized clamping screws from the outside of the rack posts
so that they engage the rails and the rack. The front of the rail requires one
clamping screw in the center hole of the center RU. The rear of the rail
requires two clamping screws. Insert these screws in the middle hole in the
first and the fifth RU.
14 Remove any plastic film from the front and sides of the shelf. 15 Remove
the caps from both sides of the front of the storage shelf.
The caps snap off without any tools.
Hardware installation procedures 42 Installing a storage shelf
16 Warning: The shelf weighs 61.56kg (135.72lbs) without disk drives. Use a
mechanical lift or have at least three people hold the lifting straps. Do not
discard the straps in case you need to move the shelf later. Warning: The back
end of the storage shelf is heavier than the front end. From the front of the
rack, carefully lower the storage shelf onto the rail ledges in the rack. You
can use the three lifting straps that are shipped with the storage shelf to
lift and place the shelf onto the rails.
17 Push the shelf into the back of the rack. 18 On the front of the rack, use
a long screw and two washers in the top and the
bottom holes.
Place the washer with a gap onto the screw first.
Hardware installation procedures 43 Installing a storage shelf
19 Locate the lock tabs on the left and right rear corners of the storage
shelf chassis.
Hardware installation procedures 44 Installing a storage shelf
20 Insert a small screw through the lock tab into the hole in the triangular
end of the rail. Secure the screw.
21 On the front of the storage shelf reattach the left and the right caps. The
left cap contains the control panel. The right cap contains spaces for two
latches which connect to the storage shelf.
Hardware installation procedures 45 Installing disk drives into a full-
capacity storage shelf
Installing disk drives into a full-capacity storage shelf
The 5U84 Primary Storage Shelf and the Expansion Storage Shelf use 4-TB or
8-TB disk drives. You cannot mix the two disk storage capacities in one shelf.
You can have different capacities in separate shelves. You can purchase a
storage shelf that provides half of the total possible storage capacity. See
“Installing disk drives and blanks into a half-capacity storage shelf” on page
48.
Note: It is helpful to have two people install the disks. Both people can move
the latches to unlock the carriers. One person can remove the disks from the
shipping box and hand them to the other person. The first person should orient
the disk drives in the direction of installation. The second person installs
the disks. Both people can press the carriers down and lock them forward. Less
than 5 minutes are required to fill an entire drawer.
Hardware installation procedures 46 Installing disk drives into a full-
capacity storage shelf To install the disk drives into the storage shelf slots
1 Examine the two anti-tamper locks on the front of each drawer.
The red arrows in the locks point to the center of the drawer if the locks are
not engaged. 2 If the locks are engaged, use a Torx T20 screwdriver to rotate
the locks counterclockwise.
3 Pull the bottom drawer forward as far as possible without damaging the
hardware. Press the drawer latches (both sides of the drawer) in towards the
middle of the drawer in order to open the drawer.
4 Locate and open the box or boxes that contain the storage shelf hard disk
drives in their Disk Drive In Carrier (DDIC) units. Note: Each disk drive is
preinstalled in a carrier.
Hardware installation procedures 47 Installing disk drives into a full-
capacity storage shelf
5 Before removing the disk drives from a shipping box, prepare each disk drive
carrier for drawer installation. Do the following for each carrier: Identify
the release latch in the middle of the top of a carrier. Push the release
latch to the right in the direction of the arrow. A yellow line appears to the
left of the latch when the carrier is unlocked.
6 After unlocking all of the carriers, install each carrier into the bottom
drawer. Do the following for each of the carriers that you want to install:
Insert the carrier into one slot and push it down until it stops. Place one
thumb on each of the two pads that are shown by the red arrows.
Push the carrier forward towards the rear of the slot, towards the back of the
drawer.
Hardware installation procedures 48 Installing disk drives and blanks into a
half-capacity storage shelf
The release latch clicks into place. Repeat the process for each carrier in
the bottom drawer of the shelf. 7 Verify that all disks are properly seated in
the slots. 8 Slide the bottom drawer into the storage shelf. Press the two
drawer release buttons located (one per side) on the side of the drawer to
close the drawer until the latches click. 9 Engage the anti-tamper locks on
the top drawer as needed. 10 Pull the top drawer forward as far as possible
without damaging the hardware. 11 Install the disk drive carriers into the top
storage shelf drawer. 12 Slide the top drawer into the shelf by pressing the
two drawer release buttons located (one per side) on the side of the drawer to
close the drawer until the latches click. 13 Engage the anti-tamper locks as
needed.
Installing disk drives and blanks into a half-capacity storage shelf
The Primary Storage Shelf and the Expansion Storage Shelf use 4-TB or 8-TB
disk drives. You cannot mix the two disk storage capacities in one shelf. You
can have different capacities in separate shelves. This section provides
instructions for installing disk drives into a storage shelf that has one half
of the total usable storage capacity. Blank carriers are installed into the
slots that are not filled with disks. Detailed maps of the slots are provided
for the blanks and the disks.
Hardware installation procedures 49 Installing disk drives and blanks into a
half-capacity storage shelf Fill the bottom drawer with disks and blanks. Then
install disks and blanks into the top drawer. To install disk drives and
blanks into the bottom drawer of the storage shelf
1 Examine the two anti-tamper locks on the front of each drawer.
The red arrows in the locks point to the center of the drawer if the locks are
not engaged. 2 If the locks are engaged, use a Torx T20 screwdriver to rotate
the locks counterclockwise.
Hardware installation procedures 50 Installing disk drives and blanks into a
half-capacity storage shelf
3 Pull the bottom drawer forward as far as possible without damaging the
hardware. Press the drawer latches (both sides of the drawer) in towards the
middle of the drawer in order to open the drawer.
Caution: To provide sufficient airflow for storage shelf cooling, install
blank carriers in the empty drive slots of a half-populated drawer.
4 Note the numbered slots in each of the three rows. Blank disk carriers are
shown in blue. Slots with the carriers that include disk drives are shown in
gray.
Hardware installation procedures 51 Installing disk drives and blanks into a
half-capacity storage shelf
5 Identify the release latch in the middle of the top of a blank carrier.
6 Push the release latch to the right. A yellow line appears to the left of
the latch when the disk is unlocked.
7 Start at the front row of the bottom drawer. 8 Locate slot 42 at the front
left corner of the drawer. 9 Insert one disk drive into slot 42 and into each
slot in the first row. 10 Insert the carrier into the slot and push it down
until it stops. 11 Place one thumb on each of the two pads that are shown by
the red arrows.
Hardware installation procedures 52 Installing disk drives and blanks into a
half-capacity storage shelf
12 Push the carrier forward towards the rear of the slot, in the direction of
the circled end of the carrier. The latch clicks into place. The yellow line
is no longer visible.
13 Press all carriers down into the slots and lock them forward. 14 Insert one
disk drive into slot 56 and into all slots in the second row. 15 Press all
carriers down into the slots and lock them forward. 16 Insert one disk drive
into slot 70. 17 Insert blank carriers into slots 71 to 83. 18 Press all
carriers down into the slots and lock them forward. 19 Verify that all
carriers in the three rows are seated down in the slots. A carrier
that is not inserted correctly may hinder securing the drawer. 20 If you need
to remove a disk drive, slide the release latch to the right. The disk
pops up. 21 Slide the drawer carefully into the shelf by pressing the two
drawer release
buttons located (one per side) on the side of the drawer to close the drawer
until the latches click. 22 Engage the anti-tamper locks as needed.
Hardware installation procedures 53 Installing disk drives and blanks into a
half-capacity storage shelf To install disk drives and blanks into the top
drawer of the storage shelf
1 Pull the top drawer forward as far as possible without damaging the
hardware. 2 Install disk drive carriers into slots 0 to 13.
3 Install disk drive carriers into slots 14 and 28. 4 Push the release latch
to the right. A yellow line appears to the left of the latch
when the disk is unlocked. 5 Insert the carrier into one slot and push it down
until it stops.
Hardware installation procedures 54 Installing the compute node rack rails
6 Place one thumb on each of the two pads that are shown by the red arrows.
7 Push the carrier forward towards the rear of the slot, in the direction of
the circled end of the carrier. The release latch clicks into place.
8 Locate slot 15 on the left side of the second row. Slot 15 is to the right
of slot 14. Install blanks into slots 15 through 27.
9 Locate slot 29, to the right of slot 28. 10 Install blanks into slots 29 to
41. 11 If you need to remove a blank, slide the release latch to the right.
The blank
pops up. 12 Verify that all slots are filled. 13 Push the drawer into the
shelf by pressing the two drawer release buttons
located (one per side) on the side of the drawer to close the drawer until the
latches click. 14 Engage the anti-tamper locks as needed.
Installing the compute node rack rails
Veritas recommends the following. The compute node requires two RUs of space
Two people should install the rails; one person at the back of the rack and
one
at the front. Two people should lift and place the compute node into the
mounted rails.
Hardware installation procedures 55 Installing the compute node rack rails To
install the compute node rails
1 Identify the front and the rear of each rail. The following illustration
shows the front of the left-hand and the right-hand rails. The front of the
left rail is labeled A. The front of the right rail is labeled B. The labeled
sides face the rack wall when the rails are installed.
The small metal extensions that are outlined in the illustration must point
down, towards the floor of the rack. Note: The information in this document
supersedes any of the information in the printed installation materials. 2 Use
the printed rack templates to align the rails with the rack holes. Fold the
template along the yellow dotted lines to create an exact, physical match to
the rack.
Be sure to use the same holes on each side of the rack.
Hardware installation procedures 56 Installing the compute node rack rails
3 Place one rail inside the rack. The rack holes and the rail pins should
match the template. Use the same 1RU space and holes in the front and the rear
of the rack. Align the pins in the top holes and the bottom holes of the top
RU. Move the rail front and back to fit into the rack. Slide the rail forward
until the pins click into the rack holes.
4 Secure the rear of the rail. Push the blue lock toward the rack wall and
toward the back of the rail. The lock must be behind the rack post. Ensure
that the lock clicks into place.
Hardware installation procedures 57 Installing the compute node rack rails
5 Insert a washer and a screw into the middle hole of the top RU in the rear
of the rack.
6 Repeat steps 3 through 5 for the other rail. 7 Identify the three different
rails in each rail assembly.
Components in this illustration are as follows. 1 – Outer rail 2 –
Intermediate rail
3 – Inner rail
Hardware installation procedures 58 Installing the compute node rack rails
8 Pull the white tab forward to release the inner rail from the outer and the intermediate rail.
Hardware installation procedures 59 Installing the compute node into a rack
9 Separate the inner rail from the other rail components in the rack. 10
Attach the inner rail to the left and the right sides of the chassis at the
four
attachment locations.
The rails click into place when properly installed.
Installing the compute node into a rack
After the appliance rails have been installed, you can install the appliance
into the rack. After the storage shelves and the compute node rails have been
installed, you can install the compute node into the rack. These instructions
apply to a one-node system and to a multi-node system. 1 Verify that the rails
are securely attached.
Verify that the outer rail is securely attached to the rack. Verify that the
inner rail is securely attached to the compute node. 2 Place the hardware in
the front of the rack.
Hardware installation procedures 60 Installing the compute node into a rack
3 Slide the blue tab forward to unlock the intermediate rail.
4 Pull the intermediate portion of rail the rail forward. Ensure that the ball
bearing retainer on the intermediate rail is locked forward. Note: You do not
need to extend the rails as far as they can possibly extend. You only need
sufficient space to place the hardware into the rails.
5 Align the compute node inner rail to the intermediate rail in the rack.
Slide the inner rail that is attached to compute node forward into the
intermediate rail until a hard stop is encountered. The rail has a lock
mechanism that prevents the hardware from being fully pushed into the rack.
Hardware installation procedures 61 Connecting the hardware to one compute
node
6 Slide the blue tab to unlock the rails and continue the sliding of the
compute node into the rack.
7 Secure the captive screws on the compute node ears.
Connecting the hardware to one compute node
This section provides cabling information for a Veritas 5360 Appliance that
includes one compute node, one Primary Storage Shelf, and up to three
Expansion Storage Shelves. Each compute node is connected to the Primary
Storage Shelf with four SAS-3 cables. The compute nodes connect to each other
with two Ethernet cables.
Hardware installation procedures 62 Connecting the hardware to one compute
node
Expansion Storage Shelves connect to the Primary Shelf and to other Expansion
shelves with two SAS-3 cables. The Primary Shelf has a single SAS-3 port on
the left side of each RAID controller I/O module. This port connects to SAS-3
port A in the Expansion I/O modules. Note: The orientation of the blue tabs on
the ends of the SAS-3 cables is important. In the appliance, the blue tabs on
each SAS-3 connector must face as shown in the diagram.
In the storage shelves, the blue tabs in the SAS-3 connectors should point to
the 12 Gb/s SAS label near each port.
Hardware installation procedures 63 Connecting the hardware to one compute
node To connect a compute node to a Primary Shelf
1 Obtain four SAS-3 cables for each compute node. 2 Identify the SAS-3 ports
in slot 3 and slot 7 of the compute node that is closest
to the Primary Shelf.
The ports in each slot are labeled 3, 2, 1, and 0 from left to right.
3 Identify the four SAS-3 ports in each Primary Shelf controller.
The left-hand controller is labeled A and the right-hand controller is labeled
B. The ports in each controller are labeled 3, 2, 1, and 0 from left to right.
Note: The colors of the cables in the following diagrams are for demonstration
purposes only. 4 Connect the cables as follows: Connect slot 3, Port 3 of the
compute node to controller B, Port 1 on the
Primary Shelf.
Hardware installation procedures 64 Connecting the hardware to one compute
node
Connect slot 3, Port 2 of the compute node to controller A, Port 1 on the
Primary Shelf.
Connect slot 7, Port 0 of the compute node to controller B, Port 0 on the
Primary Shelf.
Connect slot 7, Port 1 of the compute node to controller A, Port 0 on the
Primary Shelf.
Use the following procedure to connect Expansion Storage Shelves to the
Primary Shelf. If you do not have any Expansion shelves at this time, proceed
to the following section to connect power cords to the hardware. See
“Connecting the power cords” on page 77. To connect Expansion Storage Shelves
to a Primary Shelf 1 Do the following if you have one Expansion Shelf.
Connect one end of two SAS-3 cables to the SAS-3 port on the left hand side of
each RAID controller in the Primary Shelf.
Connect the other end of the SAS-3 cables to port A in each of the I/O modules
in the Expansion Shelf. Note: The blue tab on the cable must face down in the
Expansion Shelf.
Hardware installation procedures 65 Connecting the hardware to one compute
node
2 Do the following if you have two Expansion shelves. Connect one end of the
two SAS-3 cables to the SAS-3 port on the left hand side of each RAID
controller in the Primary Shelf. Connect the other end of the SAS-3 cable in
RAID controller A to port A in the nearest Expansion Shelf I/O module on the
left side of the shelf. Connect the other end of the SAS-3 cable in RAID
controller B to port A in the right-hand I/O module in the lower Expansion
Shelf. Connect port C in I/O module A of the upper Expansion Shelf to port A
in I/O module A of the lower Expansion Shelf. Connect port A in I/O module B
of the upper Expansion Shelf to port C in I/O module B of the lower Expansion
Shelf.
Hardware installation procedures 66 Connecting the hardware to one compute
node
3 Do the following if you have three Expansion shelves. Connect one end of the
two SAS-3 cables to the SAS-3 port on the left hand side of each RAID
controller in the Primary Shelf. Connect the other end of the SAS-3 cable in
RAID controller A to port A in the nearest Expansion Shelf I/O module on the
left side of the shelf. Connect the other end of the SAS-3 cable in RAID
controller B to port A in the right-hand I/O module in the lowest Expansion
Shelf. Connect port C in I/O module A of the upper Expansion Shelf to port A
in I/O module A of the middle Expansion Shelf.
Hardware installation procedures 67 Connecting the hardware to one compute
node
Connect port A in I/O module B of the upper Expansion Shelf to port C in I/O
module B of the middle Expansion Shelf.
Connect port C in I/O module A of the middle Expansion Shelf to port A in I/O
module A of the lowest Expansion Shelf.
Connect port A in I/O module B of the middle Expansion Shelf to port C in I/O
module B of the lowest Expansion Shelf.
Hardware installation procedures 68 Connecting the hardware to two compute
nodes
Connecting the hardware to two compute nodes
Installation procedures for a two-node or multi-node system is the same as for
a single-node system except for the following: The two nodes are connected to
each other through the two far-right 1Gb
Ethernet ports on the rear of the nodes. Both nodes connect to the Primary
Storage Shelf.
Note: The colored cables are for demonstration purposes only. There is only
one type of SAS-3 cable.
Note: The orientation of the blue tabs on the ends of the SAS-3 cables is
important. In the appliance, the blue tabs on each SAS-3 connector must face
as shown in the diagram.
In the storage shelves, the blue tabs in the SAS-3 connectors should point to
the 12 Gb/s SAS label near each port.
Hardware installation procedures 69 Connecting the hardware to two compute
nodes To connect a two-node appliance
1 Identify the two ports on the lower right corner of both nodes.
2 Connect Ethernet cables between the ports.
3 Identify the SAS ports on the compute nodes.
Hardware installation procedures 70 Connecting the hardware to two compute
nodes
4 Identify the SAS ports on the Primary Storage Shelf.
5 Connect the cables as follows: On the compute node that is located closest
to the Primary Storage Shelf, connect two SAS cables. On the compute node that
is located closest to the Primary Storage Shelf, connect two more SAS cables.
On the compute node that is located farthest from the Primary Storage Shelf,
connect two SAS cables. On the compute node that is located farthest from the
Primary Storage Shelf connect two more SAS cables .
Hardware installation procedures 71 Connecting the hardware to two compute
nodes
6 If you have Expansion Storage Shelves, proceed to the following
instructions. See “To connect Expansion Storage Shelves to a Primary shelf” on
page 71. If you do not have Expansion shelves proceed to connect the power
cords. See “Connecting the power cords” on page 77.
To connect Expansion Storage Shelves to a Primary shelf 1 Obtain two SAS-3
cables. 2 Locate the SAS-3 ports in the left-hand side of each controller in
the Primary
shelf.
Hardware installation procedures 72 Connecting the hardware to two compute
nodes
3 Locate SAS-3 ports A and C in both I/O modules of the Expansion shelves.
Port B is not used. 4 If you have one Expansion shelf, connect it to the
Primary shelf .
Hardware installation procedures 73 Connecting the hardware to two compute
nodes
5 If you have two Expansion shelves, connect them as shown.
Hardware installation procedures 74 Connecting the hardware to two compute
nodes
6 If you have three Expansion shelves connect them as shown.
Hardware installation procedures 75 Connecting the hardware to two compute nodes
Hardware installation procedures 76 Connecting Flex nodes to the network
7 Proceed to the following section to connect power cords to the hardware. See
“Connecting the power cords” on page 77.
Connecting Flex nodes to the network
Network ports on the rear panel of the compute node are shown in the following
diagram.
The following table provides information about connecting the network ports on both Flex nodes.
Port host1 (mgmt0 bond) copper/RJ45 connector
host0 (mgmt0 bond) copper/RJ45 connector
privnic1 (eth2/NIC3) copper/RJ45 connector privnic0 (eth3/NIC4) copper/RJ45
connector IPMI port – copper/RJ45 connector
Function
Best practices recommend that you use this port and the host0 port to access
the Flex Appliance Console to perform the initial configuration. Labeled ETH0
on the node.
Best practices recommend that you use this port and the host1 port to access
the Flex Appliance Console to perform the initial configuration. Labeled ETH1
on the node.
You must use this port and the privnic0 port to connect the nodes to each
other. Labeled ETH2 on the node.
You must use this port and the privnic1 port to connect the nodes to each
other. Labeled ETH3 on the node.
A 1-GbE port that is used to connect to the Veritas Remote Management
Interface.
The 25-10GbE ports come populated with the 10GbE optical modules. For more details, see the Veritas 5360 Appliance I/O configuration options section in the Veritas 5360 Appliance Product Description Guide on SORT.
Hardware installation procedures 77 Connecting the power cords
Connecting the power cords
Connect all of the storage shelves and the compute node to the Power
Distribution Unit in the rack. Typically a rack has one PDU on each side at
the rear of the hardware. Two PDU strips provide redundant power. To connect
the power cords 1 Obtain two power cords for each unit. 2 Note that the
storage shelf cords have a right-angled connector on the end
that connects to the shelf.
3 Connect the right-angled ends to the Expansion shelf. Connect the strain
relief bale to each power cord.
Hardware installation procedures 78 Connecting the power cords
4 Connect two power cords between the Expansion shelf and the PDU.
5 Rewrap the plastic ties to secure each power cord. 6 Connect two power cords
between the Primary shelf and the PDU.
Hardware installation procedures 79 Turning on the hardware and verifying
operation
7 Connect two power cords between the compute node and the PDU.
8 Verify that the final power cord cabling is consistent with the following
diagram.
Turning on the hardware and verifying operation
You must turn on the hardware in the following order: Expansion shelf Primary
shelf Compute node or nodes
Hardware installation procedures 80 Turning on the hardware and verifying
operation To turn on the hardware
1 Verify that the following cables are connected properly and securely: SAS
cables between the Primary Shelf and the Expansion Shelf SAS-3 cables between
the compute nodes and the Primary Shelf Power cords from each component to the
appropriate Power Distribution Unit (PDU) sockets in the rack.
2 On the rear panel of the Expansion shelf turn on both power supplies.
3 Wait 2 or 3 minutes for the shelf to initialize. The shelf is more quiet
when it has initialized.
Hardware installation procedures 81 Turning on the hardware and verifying
operation
4 Verify that the Power OK LEDs on both power supplies are green.
Number 1 2 3
Description Power supply failure AC failure Power ok
5 Verify that the Power on (standby) LED on the front, left, of the shelf is green.
6 Turn on the Primary Storage Shelf. Let the shelf initialize for 2 or 3 minutes. Verify that the Power OK LEDs on the power supply modules are green.
Hardware installation procedures 82 Configuring the Veritas Remote Management
Interface from a Flex Appliance
Verify that the Power On LED on the control panel on the front of the shelf is
green.
Configuring the Veritas Remote Management Interface from a Flex Appliance
Veritas Flex Appliance release does not support configuring the IPMI port
through the Flex Appliance Shell. To configure the dedicated Veritas Remote
Management Interface (IPMI) LAN settings in the BIOS 1 Connect a standard
video cable between the VGA (Video Graphics Array) port
and the computer monitor 2 Connect a keyboard to a USB port at the rear of the
Flex 5360 appliance. 3 Ensure that the power cords are connected. 4 Turn on
the compute node or nodes with the power button on the control panel
on the right front side of the unit or units. High availability (HA) appliance
compute node and storage shelf service considerations Attention: When you turn
on the storage shelves and compute nodes after completing the service, turn on
the primary compute node first before you turn on the secondary compute node.
Important: Check to determine which compute node is configured as the primary
compute node, and which is configured as the secondary compute node. Do this
before turning on the compute nodes and storage shelves.
5 Verify that the LED under the button is green.
Hardware installation procedures 83 Configuring the Veritas Remote Management
Interface from a Flex Appliance
6 The prompt about accessing the BIOS at the beginning of the startup cycle
appears. Wait until the Veritas logo shows up and press F2 to enter the
initial BIOS setup screen. The initial setup dialog box appears and prompts
you.
Warning: When you are in the BIOS, do not perform any other steps other than
the ones mentioned in this section. Note: If you miss the initial setup dialog
box prompt in step 6, the appliance shell appears. Shut down and restart the
appliance and try accessing the BIOS menu again. The Setup Menu page appears
and the Main menu option should be highlighted.
Hardware installation procedures 84 Configuring the Veritas Remote Management
Interface from a Flex Appliance
7 Use the down key on the keyboard and navigate to the Server Management menu
option. Press Enter.
8 Press the up or down key on the keyboard to navigate to BMC LAN
Configuration. Press Enter.
Hardware installation procedures 85 Configuring the Veritas Remote Management
Interface from a Flex Appliance
9 The BMC LAN Configuration options screen appears.
10 Press the down arrow key on the keyboard to navigate to the Dedicated
Management LAN Configuration option. Use the information supplied by the
customer to fill in the following fields: IP Source, IP address, Subnet mask,
Gateway IP.
Hardware installation procedures 86 Accessing and using the Veritas Remote
Management interface
11 To save your BIOS changes, press F10.
12 Press Y to save and exit. The appliance restarts itself.
Accessing and using the Veritas Remote Management interface
The IPMI web interface is known as Veritas Remote Management interface. You
can use Veritas Remote Management interface to log on to the Flex Appliance
Shell. Before you use the Remote Management interface, the following
prerequisites must be met: The Remote Management interface (IPMI port) must
first be configured. At least one power cable must be connected to a
functioning power source. At least one user must be enabled to use the LAN
channel(s).
Hardware installation procedures 87 Accessing and using the Veritas Remote
Management interface
To access and use the IPMI web interface from a remote computer 1 Log on to a
remote computer in the network and open a supported Windows
browser. 2 Enter the remote management port IP address that is assigned to the
remote
management port. The following page appears:
3 Enter your login information. The default user name is sysadmin. The default
password is P@ssw0rd, where 0 is the number zero. Click Login.
4 Click the Remote Control section located at the top of the page. The Remote
Control section lets you remotely monitor and control the server. Do one of
the following to launch the Appliance Shell: Navigate to Remote Control> iKVM
over HTML5. Click Launch iKVM over HTML5 to launch the Appliance shell. A new
window opens that enables you to remotely monitor and control the appliance.
Click Remote Control > KVM/Console Redirection. Click Launch Console to launch
the appliance shell menu.
Hardware installation procedures 88 Accessing and using the Veritas Remote
Management interface
A JViewer application opens that enables you to remotely monitor and control
the appliance. This application requires Java Runtime Environment (JRE)
version 6.0 or later. Install Java. You can login to the JViewer application
using the same user name and password from step 3
Caution: Starting with Java 7 update 45, you may receive a security warning
when you launch the KVM remote console from the appliance IPMI port. The
warning states that you do not have proper permissions and prevents appliance
access from the IPMI port. For information about how to resolve this issue,
refer to the following document:
https://www.veritas.com/support/en_US/article.100011121.html
5 You can now access and log on to the Flex Appliance Shell. Enter the user
name and password for the appliance. By default, the user name hostadmin has
the password, P@ssw0rd where 0 is the number zero. Type “?” and then enter the
“system” command to actually see the list of available commands.
A Appendix
Adding Expansion Storage Shelves to an operating appliance that does not have
any Expansion shelves
This appendix includes the following topics: Overview Turning off the existing
hardware Installation instructions Connecting one Expansion Shelf to the
Primary Shelf Connecting two Expansion Shelves to the Primary Shelf Connecting
three Expansion Shelves to the Primary Shelf
Overview
This appendix applies to an operating appliance that has one or two compute
nodes and a Primary Storage Shelf. It is possible to already have one or more
Expansion Storage Shelves, up to three units. The hardware must be turned off
before you add any storage shelves.
Adding Expansion Storage Shelves to an operating appliance that does not have
any Expansion shelves 90 Turning off the existing hardware
Turning off the existing hardware
You must turn off the existing system before you turn on any Expansion
Shelves. Be sure to perform these steps in the order that they are presented.
To turn off the existing hardware 1 Perform a soft shutdown of any compute
nodes.
If you have two compute nodes you must shut them down separately. From the
Flex Appliance Shell, enter system shutdown. Verify that the compute node is
completely turned off. All LEDs are off. Fans
are not running. Repeat these steps for the second compute node if applicable.
2 After the compute nodes are turned off you must manually turn off the
Primary Shelf. Locate the on/off switches on the two power supplies on the
rear of the
Primary Shelf. Press the switches to off.
Adding Expansion Storage Shelves to an operating appliance that does not have
any Expansion shelves 91 Installation instructions
Installation instructions
The procedures for installing an Expansion shelf and inserting the disk drive
carriers are the same as for a Primary shelf. Refer to the following sections
for details. See “Dimensions and determining rack locations” on page 28. See
“Installing a storage shelf” on page 35. See “Installing disk drives and
blanks into a half-capacity storage shelf” on page 48. See “Installing disk
drives into a full-capacity storage shelf” on page 45.
Connecting one Expansion Shelf to the Primary Shelf
The Expansion Shelf connects to the Primary Shelf but it does not connect
directly to the compute node.
Adding Expansion Storage Shelves to an operating appliance that does not have
any Expansion shelves 92 Connecting one Expansion Shelf to the Primary Shelf
Note: The orientation of the blue tabs on the ends of the SAS-3 cables is
important. In the appliance, the blue tabs on each SAS-3 connector must face
as shown in the diagram.
In the storage shelves, the blue tabs in the SAS-3 connectors should point to
the 12 Gb/s SAS label near each port.
To connect one Expansion Shelf to the Primary Shelf 1 Verify that all compute
nodes and the Primary Shelf are off and that the power
cords are unplugged. Do not remove the cables between the compute nodes and
the Primary Shelf. 2 Obtain the two SAS-3 cables that ship with the Expansion
Shelf.
Adding Expansion Storage Shelves to an operating appliance that does not have
any Expansion shelves 93 Connecting one Expansion Shelf to the Primary Shelf
3 Identify the single SAS-3 port on the right side of each controller module
in the Primary Shelf.
4 Identify ports A and C in each I/O module in the Expansion Shelf. Port B is
not available for use.
5 Connect the cables as follows: Connect one cable to each of the SAS-3 ports
on the right of each controller module on the Primary Shelf. Connect the other
end of each cable to port A in each I/O module in the Expansion Shelf.
Adding Expansion Storage Shelves to an operating appliance that does not have
any Expansion shelves 94 Connecting two Expansion Shelves to the Primary Shelf
6 Verify the final cable configuration.
7 Connect the power cords of all devices as described in this section. See
“Connecting the power cords” on page 77.
8 Turn on the devices in the proper sequence as described in this section. See
“Turning on the hardware and verifying operation” on page 79.
9 Add the new disk space with the instructions in one of these sections. See
“Adding the disk space of an Expansion Storage Shelf from the Flex Appliance
Console” on page 117.
Connecting two Expansion Shelves to the Primary Shelf
Both Expansion Shelves connect to the Primary Shelf but not directly to the
compute node.
Adding Expansion Storage Shelves to an operating appliance that does not have
any Expansion shelves 95 Connecting two Expansion Shelves to the Primary Shelf
Note: The orientation of the blue tabs on the ends of the SAS-3 cables is
important. In the appliance, the blue tabs on each SAS-3 connector must face
as shown in the diagram.
In the storage shelves, the blue tabs in the SAS-3 connectors should point to
the 12 Gb/s SAS label near each port.
To connect two Expansion Shelves to the Primary Shelf 1 Verify that all
compute nodes and the Primary Shelf are off and that the power
cords are unplugged. Do not remove the cables between the compute nodes and
the Primary Shelf. 2 Obtain the two SAS-3 cables that ship with each Expansion
Shelf.
Adding Expansion Storage Shelves to an operating appliance that does not have
any Expansion shelves 96 Connecting two Expansion Shelves to the Primary Shelf
3 Identify the single SAS-3 port on the right side of each controller module
in the Primary Shelf.
4 Identify ports A and C in each I/O module in the Expansion Shelf. Port B is
not available for use.
5 Connect the cables as follows: Connect one cable to each of the SAS-3 ports
on the right of each controller module on the Primary Shelf. Connect the left
cable to port A in the left I/O module on the closest Expansion Shelf. Connect
the right cable from the Primary Shelf to port A in the right I/O module in
the farthest Expansion Shelf. Connect one end of a new cable to port C in the
left module of the first Expansion Shelf. Connect the other end of the cable
to port A in the left module of the second Expansion Shelf. Connect one end of
the final cable to port A on the right I/O module of the first Expansion
Shelf. Connect the other end of that cable to port C in the right I/O module
of the second Expansion Shelf.
Adding Expansion Storage Shelves to an operating appliance that does not have
any Expansion shelves 97 Connecting two Expansion Shelves to the Primary Shelf
6 Verify the final cable configuration.
7 Connect the power cords of all devices as described in this section. See
“Connecting the power cords” on page 77.
8 Turn on the devices in the proper sequence as described in this section. See
“Turning on the hardware and verifying operation” on page 79.
9 Add the new disk space with the instructions in one of these sections. See
“Adding the disk space of an Expansion Storage Shelf from the Flex Appliance
Console” on page 117.
Adding Expansion Storage Shelves to an operating appliance that does not have
any Expansion shelves 98 Connecting three Expansion Shelves to the Primary
Shelf
Connecting three Expansion Shelves to the Primary Shelf
Two of the three Expansion Shelves connect to the Primary Shelf but not
directly to the compute node. Note: The orientation of the blue tabs on the
ends of the SAS-3 cables is important. In the appliance, the blue tabs on each
SAS-3 connector must face as shown in the diagram.
In the storage shelves, the blue tabs in the SAS-3 connectors should point to
the 12 Gb/s SAS label near each port.
To connect three Expansion Shelves 1 Verify that all compute nodes and the
Primary Shelf are off and that the power
cords are unplugged. Do not remove the cables between the compute nodes and
the Primary Shelf. 2 Obtain the two SAS-3 cables that ship with each Expansion
Shelf.
Adding Expansion Storage Shelves to an operating appliance that does not have
any Expansion shelves 99 Connecting three Expansion Shelves to the Primary
Shelf
3 Identify the single SAS-3 port on the right side of each controller module
in the Primary Shelf.
4 Identify ports A and C in each I/O module in the Expansion Shelf. Port B is
not available for use.
5 Connect the cables as follows: Connect one cable to each of the SAS-3 ports
on the right of each controller module on the Primary Shelf. Connect the left
cable to port A in the left I/O module on the closest Expansion Shelf. Connect
the right cable from the Primary Shelf to port A in the right I/O module in
the farthest Expansion Shelf. Connect one end of a new cable to port C in the
left module of the first Expansion Shelf. Connect one end of another cable to
port A on the right I/O module of the first Expansion Shelf. Connect the other
end of that cable to port C in the right I/O module of the second Expansion
Shelf. Connect one end of another cable to port C on the left I/O module of
the second Expansion Shelf. Connect the other end of that cable to port A in
the left I/O module of the third Expansion Shelf. Connect one end of another
cable to port A on the right I/O module of the second Expansion Shelf.
Adding Expansion Storage Shelves to an operating appliance that does not have
any Expansion shelves 100 Connecting three Expansion Shelves to the Primary
Shelf
Connect the other end of that cable to port C in the right I/O module of the
third Expansion Shelf.
6 Verify the final cable configuration.
7 Connect the power cords of all devices as described in this section. See
“Connecting the power cords” on page 77.
Adding Expansion Storage Shelves to an operating appliance that does not have
any Expansion shelves 101 Connecting three Expansion Shelves to the Primary
Shelf
8 Turn on the devices in the proper sequence as described in this section. See
“Turning on the hardware and verifying operation” on page 79.
9 Add the new disk space with the instructions in one of these sections. See
“Adding the disk space of an Expansion Storage Shelf from the Flex Appliance
Console” on page 117.
B Appendix
Adding Expansion Storage Shelves to an operating appliance that has at least
one operating Expansion shelf
This appendix includes the following topics: Overview Turning off the existing
hardware Installation instructions Connecting one Expansion Shelf to a system
that has one existing Expansion
Shelf Connecting two Expansion Shelves to a system that has one existing
Expansion
Shelf Connecting one Expansion Shelf to a system that has two existing
Expansion
Shelves
Overview
This appendix applies to an operating appliance that has one or two compute
nodes and a Primary Storage Shelf.
Adding Expansion Storage Shelves to an operating appliance that has at least
one operating Expansion shelf 103 Turning off the existing hardware
It is possible to already have one or more Expansion Storage Shelves, up to
three units. The hardware must be turned off before you add any storage
shelves.
Turning off the existing hardware
You must turn off the existing system before you turn on any new Expansion
shelves. Be sure to perform these steps in the order that they are presented.
To turn off the existing hardware 1 Perform a soft shutdown of the compute
nodes.
If you have two compute nodes you must shut them down separately. From the
Flex Appliance Shell, enter system shutdown. Verify that the compute node is
completely turned off. All LEDs are off. Fans
are not running. Repeat these steps for a second compute node if applicable. 2
After the compute nodes are turned off you must manually turn off the storage
shelves. Turn off the Primary shelf first. Then turn off the Expansion shelf.
If you have a second Expansion shelf turn it off last.
Adding Expansion Storage Shelves to an operating appliance that has at least
one operating Expansion shelf 104 Installation instructions
3 Locate the on/off switches on the two power supplies on the rear of the
storage shelves. The switches are in the same location for the Primary shelf
and for the Expansion shelves.
4 Press the switches on the Primary shelf to off. 5 Press the switches on the
Expansion shelf that is closest to the Primary shelf
to off. 6 If you have a second Expansion shelf press the switches to off.
Installation instructions
The procedures for installing an Expansion shelf and inserting the disk drive
carriers are the same as for a Primary shelf. Refer to the following sections
for details. See “Dimensions and determining rack locations” on page 28. See
“Installing a storage shelf” on page 35. See “Installing disk drives and
blanks into a half-capacity storage shelf” on page 48. See “Installing disk
drives into a full-capacity storage shelf” on page 45.
Adding Expansion Storage Shelves to an operating appliance that has at least
one operating Expansion shelf 105 Connecting one Expansion Shelf to a system
that has one existing Expansion Shelf
Connecting one Expansion Shelf to a system that has one existing Expansion
Shelf
Expansion Shelves connect to the Primary Shelf and to other Expansion Shelves
but they do not connect directly to the compute node. Note: The orientation of
the blue tabs on the ends of the SAS-3 cables is important. In the appliance,
the blue tabs on each SAS-3 connector must face as shown in the diagram.
In the storage shelves, the blue tabs in the SAS-3 connectors should point to
the 12 Gb/s SAS label near each port.
To connect a new Expansion Shelf to a Primary Shelf and an existing Expansion
Shelf 1 Verify that all compute nodes and the Primary Shelf are off and that
the power
cords are unplugged. Do not remove the cables between the compute nodes and
the Primary Shelf. 2 Obtain the two SAS-3 cables that ship with each Expansion
Shelf.
Adding Expansion Storage Shelves to an operating appliance that has at least
one operating Expansion shelf 106 Connecting one Expansion Shelf to a system
that has one existing Expansion Shelf
3 Identify the single SAS-3 port on the right side of each controller module
in the Primary Shelf.
4 Identify ports A and C in each I/O module in the Expansion Shelf. Port B is
not available for use.
5 Connect the cables as follows: On the existing Expansion Shelf unplug the
SAS-3 connector in port A of the right I/O module. Identify port A in the
right I/O module in the second Expansion Shelf. Plug the SAS-3 connector into
this port. Connect one end of a new SAS-3 cable to port C on the left I/O
module of the existing shelf. Connect one end of a new SAS-3 cable to port C
on the left I/O module of the existing shelf. Connect the other end of the
cable to port A on the left I/O module on the new shelf. Connect one end of a
new SAS-3 cable to port A in the right I/O module of the existing shelf.
Connect the other end of the cable to port C in the right I/O module of the
new shelf.
Adding Expansion Storage Shelves to an operating appliance that has at least
one operating Expansion shelf 107 Connecting two Expansion Shelves to a system
that has one existing Expansion Shelf
6 Verify the final cable configuration.
7 Connect the power cords of all devices as described in this section. See
“Connecting the power cords” on page 77.
8 Turn on the devices in the proper sequence as described in this section. See
“Turning on the hardware and verifying operation” on page 79.
9 Add the new disk space with the instructions in one of these sections. See
“Adding the disk space of an Expansion Storage Shelf from the Flex Appliance
Console” on page 117.
Connecting two Expansion Shelves to a system that has one existing Expansion
Shelf
Expansion Shelves connect to the Primary Shelf and to other Expansion Shelves
but they do not connect directly to the compute node.
Adding Expansion Storage Shelves to an operating appliance that has at least
one operating Expansion shelf 108 Connecting two Expansion Shelves to a system
that has one existing Expansion Shelf Note: The orientation of the blue tabs
on the ends of the SAS-3 cables is important. In the appliance, the blue tabs
on each SAS-3 connector must face as shown in the diagram.
In the storage shelves, the blue tabs in the SAS-3 connectors should point to
the 12 Gb/s SAS label near each port.
To connect two new Expansion Shelves to a Primary Shelf and an existing
Expansion Shelf 1 Verify that all compute nodes and the Primary Shelf are off
and that the power
cords are unplugged. Do not remove the cables between the compute nodes and
the Primary Shelf. 2 Obtain the two SAS-3 cables that ship with each Expansion
Shelf.
Adding Expansion Storage Shelves to an operating appliance that has at least
one operating Expansion shelf 109 Connecting two Expansion Shelves to a system
that has one existing Expansion Shelf
3 Identify the single SAS-3 port on the right side of each controller module
in the Primary Shelf.
4 Identify ports A and C in each I/O module in the Expansion Shelf. Port B is
not available for use.
5 Connect the cables as follows: On the existing Expansion Shelf unplug the
SAS-3 connector in port A of the right I/O module. Connect the end of the
cable to port A in the right I/O module in the third Expansion Shelf. Connect
one end of a new SAS-3 cable to port C on the left I/O module of the existing
shelf. Connect the other end of the cable to port A on the left I/O module on
the second shelf. Connect one end of a new SAS-3 cable to port A on the right
I/O module of the existing shelf. Connect the other end of the cable to port C
on the right I/O module on the second shelf. Connect one end of a new SAS-3
cable to port C on the left I/O module of the second shelf. Connect the other
end of the cable to port A on the left I/O module on the third shelf. Connect
one end of a new SAS-3 cable to port A on the right I/O module of the second
shelf.
Adding Expansion Storage Shelves to an operating appliance that has at least
one operating Expansion shelf 110 Connecting two Expansion Shelves to a system
that has one existing Expansion Shelf
Connect the other end of the cable to port C on the right I/O module on the
third shelf.
Adding Expansion Storage Shelves to an operating appliance that has at least
one operating Expansion shelf 111 Connecting two Expansion Shelves to a system
that has one existing Expansion Shelf
6 Verify the cabling configuration.
Adding Expansion Storage Shelves to an operating appliance that has at least
one operating Expansion shelf 112 Connecting one Expansion Shelf to a system
that has two existing Expansion Shelves
7 Connect the power cords of all devices as described in this section. See
“Connecting the power cords” on page 77.
8 Turn on the devices in the proper sequence as described in this section. See
“Turning on the hardware and verifying operation” on page 79.
9 Add the new disk space with the instructions in one of these sections. See
“Adding the disk space of an Expansion Storage Shelf from the Flex Appliance
Console” on page 117.
Connecting one Expansion Shelf to a system that has two existing Expansion
Shelves
Expansion Shelves connect to the Primary Shelf and to other Expansion Shelves
but they do not connect directly to the compute node.
Adding Expansion Storage Shelves to an operating appliance that has at least
one operating Expansion shelf 113 Connecting one Expansion Shelf to a system
that has two existing Expansion Shelves Note: The orientation of the blue tabs
on the ends of the SAS-3 cables is important. In the appliance, the blue tabs
on each SAS-3 connector must face as shown in the diagram.
In the storage shelves, the blue tabs in the SAS-3 connectors should point to
the 12 Gb/s SAS label near each port.
To connect a new Expansion Shelf to a Primary Shelf and to two existing
Expansion Shelves 1 Verify that all compute nodes and the Primary Shelf are
off and that the power
cords are unplugged. Do not remove the cables between the compute nodes and
the Primary Shelf. Do not remove the cables between the compute nodes and the
Primary Shelf. 2 Obtain the two SAS-3 cables that ship with each Expansion
Shelf.
Adding Expansion Storage Shelves to an operating appliance that has at least
one operating Expansion shelf 114 Connecting one Expansion Shelf to a system
that has two existing Expansion Shelves
3 Identify the single SAS-3 port on the right side of each controller module
in the Primary Shelf.
4 Identify ports A and C in each I/O module in the Expansion Shelf. Port B is
not available for use.
5 Connect the cables as follows: On the second existing Expansion Shelf unplug
the SAS-3 connector in port A of the right I/O module. Connect the end of the
cable to port A in the right I/O module of the third Expansion Shelf. Connect
one end of a new cable to port C in the left I/O module of the second shelf.
Connect the other end of the cable to port A in the left I/O module of the
third shelf. Connect one end of a new cable to port A on the right I/O module
of the second shelf. Connect the other end of the cable to port C on the right
I/O module of the third shelf.
Adding Expansion Storage Shelves to an operating appliance that has at least
one operating Expansion shelf 115 Connecting one Expansion Shelf to a system
that has two existing Expansion Shelves
6 Verify the cabling configuration.
Adding Expansion Storage Shelves to an operating appliance that has at least
one operating Expansion shelf 116 Connecting one Expansion Shelf to a system
that has two existing Expansion Shelves
7 Connect the power cords of all devices as described in this section. See
“Connecting the power cords” on page 77.
8 Turn on the devices in the proper sequence as described in this section. See
“Turning on the hardware and verifying operation” on page 79.
9 Add the new disk space with the instructions in one of these sections. See
“Adding the disk space of an Expansion Storage Shelf from the Flex Appliance
Console” on page 117.
C Appendix
Configuring the disk space for new Flex Expansion Storage Shelves
This appendix includes the following topics: Adding the disk space of an
Expansion Storage Shelf from the Flex Appliance
Console
Adding the disk space of an Expansion Storage Shelf from the Flex Appliance
Console
Follow the steps in this section to add storage disk space to an appliance
after physically adding one or more Expansion Shelves.
Note: When you configure additional disk space, any current backup operations
are stopped until the process is complete. Veritas recommends that you do not
start any backup operations before starting this procedure.
To configure additional disk space 1 Turn on the new shelf or shelves. 2 Turn
on the appliance node.
See “Turning on the hardware and verifying operation” on page 79. 3 Sign in to
the Flex Appliance Console. 4 Go to the System topology page.
Configuring the disk space for new Flex Expansion Storage Shelves 118 Adding
the disk space of an Expansion Storage Shelf from the Flex Appliance Console
5 Click on Add storage. 6 A confirmation window appears. Click Yes.
You can monitor the progress from the Activity Monitor.
Note: In a multi-node appliance, two tasks are shown in the Activity Monitor.
A task to add new storage displays for the first node, and a task to scan new
storage displays for the second node. The task for the second node runs after
the first node’s tasks are complete.
If you want to resize instances, refer to the Resizing instance storage
section in the Flex Appliance Getting Started and Administration Guide.
References
- The Leader in Enterprise Data Management | Veritas
- Home - VOX
- Appliances Support | Veritas™
- Appliances Support | Veritas™
- Java Warning when launching IPMI KVM console
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>