PROJOY RSD PEFS-EL Series Array Level Rapid Shutdown Installation Guide
- June 4, 2024
- PROJOY
Table of Contents
RSD PEFS-EL Series Array Level Rapid Shutdown
Installation Guide
Scope and General
The manual is only used for PEFS-EL Series Array-level Rapid Shutdown.
Version | Date | Remark | Chapter |
---|---|---|---|
V1.0 | 10/15/2021 | First Edition | – |
V2.0 | 4/20/2022 | Content Modified | 6 Installation |
V2.1 | 5/18/2022 | Content Modified | 4 Shutdown Mode |
- Changes or modifications not explained/approved in this manual void your authority to operate this equipment.
- PROJOY shall not be held responsible for any damage caused due to incorrect installation of the product and/or the misunderstanding of this manual.
- PROJOY reserves the right to make any modification to this manual or the information contained herein at any time without notice.
- No design data such as sample pictures provided in this manual may be modified or duplicated except for the purpose of personal use.
- To ensure the recycling of all possible materials and proper disposal treatment of components, please return the product to PROJOY at end-of-life.
- Check the system regularly (once per 3 months) for faults.
Important Safety Precautions
Components in the installations are exposed to high voltages and currents.
Follow these instructions carefully in order to reduce the risk of fire or
electric shock.
The following regulations and standards are considered applicable and
mandatory to read prior to the installation of electrical equipment:
- Connection with the main circuit, Wiring should be done bu professional qualified personnel; Wiring should be done after confirmation of complete disconnection of input power supply; Wiring should be done after installation of breaker body.
- International Standards: IEC 60364-7-712 Electrical installations of buildings-Require- ments for special installations or locations-Solar Photovoltaic (PV) power supply systems.
- Local building regulations.
- Guidelines for lightning and overvoltage protection.
Note!
- It is essential to uphold the limits for voltage and current in all possible operating conditions. Also keep in mind the literature on correct dimensioning and sizing of cabling and components.
- The installation of these devices may only be performed by certified technical personnel.
- The wiring schematics of the Firefighter Safety Switch can be found at the end of this manual.
- All the installation works should be tested in accordance with relevant local legislation at the time of installation.
About Rapid Shutdown
3.1 Intended Use of the Rapid Shutdown
The Rapid Shutdown has been specially developed as a safety device for direct
current (DC) photovoltaic installations. The DC disconnect switch is used to
disconnect the connection strings of the installation in case of an emergency
situation. Such an emergency situation could be in case of fire.
3.2 Location of the Rapid Shutdown
The Rapid Shutdown needs to be placed as close to the solar panels as
possible. Due to its enclosure, the switch is protected against external
influences like dust and moisture. The whole set-up is conforms to IP66 which
makes it suitable for outdoor usage when needed.
Shutdown Mode
Automatic Shutdown
Automatically shut down the DC power of panels when detecting the temperature of the area is higher than 70℃.
AC Power Shutdown
Firefighters or homeowners can manually turn off the AC power of the distribution box when in an emergency or it can automatically shut down when the AC power has lost.
Manual Shutdown
In an emergency, it can be shut down manually through the Panel Level Rapid Shutdown Controller Box.
RS485 shutdown
About PEFS Array-level Rapid Shutdown
5.1 Model Description
5.2 Technical parameters
Number of poles | 2 | 4 | 6 | 8 | 10 | 12 | 14 | 16 | 18 | 20 |
---|---|---|---|---|---|---|---|---|---|---|
Appearance | ||||||||||
Frame Rating In(A) | 16, 25, 32, 40, 50, 55 | |||||||||
Working temperature | -40 — +70°C | |||||||||
Fiducial temperature | +40°C | |||||||||
Pollution degree | 3 | |||||||||
Protection class | IP66 | |||||||||
Outline dimensions(mm) | 210x200x100 | 375x225x96 | 375x225x162 | |||||||
Installation dimensions(mm) | 06×269 | 06×436 |
5.3 Wiring Options
Number of poles | 2 | 4 | 6 | 8 | 10 | 12 | 14 | 16 | 18 | 20 |
---|---|---|---|---|---|---|---|---|---|---|
Appearance | ||||||||||
3-core wire | 1 ‘1.2m for AC power supply | |||||||||
MC4 cable | 4 | 8 | 12 | 16 | 20 | 24 | 28 | 32 | 36 | 40 |
Installation
6.1 Installation Requirements
Open the box, take out PEFS, read this manual, and prepare a cross/straight
screwdriver.
6.2 Installation Steps
-
Pull out the product bottom bracket to both sides.
-
Mount the switch enclosure on the wall.
-
Wire the power AC connection to the terminals.
Wire Color: According to American and Europe standard requirements -American standards:
L: Black; N: White; G: Green Europe standard: L: Brown; N: Blue; G: Green&Yellow
Note!
FB1 and FB2 are used to remotely display the on and off states of the switch. When the switch is closed, FB1 is connected to FB2; when the switch is open, FB1 is disconnected from FB2.
The resistor is selected according to the supply voltage, to ensure the circuit current is less than the rated current of the Indicator light and <320mA -
Wire the string cables to the interface.
Note!
Please follow the marks (1+, 1-, 2+, 2- ) for PV wiring. -
Note the installation environment (See the schematic on the next page).
Note!
Do not expose to direct sunlight.
Do not expose to rain and snow cover.
The installation site must have good ventilation conditions.
Do not be in direct contact with (continuous) ingress water.
-
Diagram
6.3 Test
-
Step1. Activate the AC power circuit. PEFS switches on.
-
Step 2. Wait one minute. UPS is charging.
-
Step 3. Deactivate the AC power circuit. PEFS will switch off in about 7 seconds. Red LED lights off.
-
Step 4. Activate the AC power circuit. PEFS switches on in 8 seconds. Red LED light on.
-
Step 5. The test is completed.
Aftersales service and warranty
This product is manufactured in a sophisticated quality management system. In case of fault, the following warranty and after-services clauses are applicable.
7.1 Warranty
On the premise of the user’s compliance with the reservation and use
specifications of the breaker, for breakers whose delivery date is within 60
months from now and whose seals are intact, PROJOY will repair or replace any
of these breakers which are damaged or cannot work normally due to manufacture
quality. However, as for faults caused by the following reasons, PROJOY would
repair or replace the breaker with a charge even it is still under warranty.
- Due to incorrect use, self-modification, and improper maintenance, etc.:
- Use beyond the requirements of standard specifications;
- After the purchase, due to falling and damage during installation, etc.;
- Earthquakes, fires, lightning strikes, abnormal voltages, other natural disasters, and secondary disasters, etc.
7.2 Aftersales service
- Please contact the supplier or our company’s after-sales service department in case of failure;
- During the warranty period: For failures caused by the company’s manufacturing problems, free repairs and replacements;
- After the warranty period expires: If the function can be maintained after the repair, make a paid repair, otherwise it can be replaced with a paid one.
Contact us
Projoy Electric Co., Ltd.
Tell : +86-512-6878 6489
Web: https://en.projoy-electric.com/
Add: 2nd Floor, Building 3, No. 2266, Taiyang Road, Xiangcheng District,
Suzhou
References
- Telepathy - Powering Successful Brands
- Home - Projoy Electric
- DC Isolator, AC Isolator, DC Isolator Switch, Solar PV Isolator Switch manufacturer-Projoy Electric
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>